Ambar3Jacksonville, United States · founded March 29, 2016 · 1 active markets
SUBSIDIARY

Ambar3 develops affordable and workforce multifamily rental communities in Southeast Florida, using housing-credit, mortgage-revenue-bond, and related financing programs. Its residents include working families, income-qualified households, and seniors. Projects range from renovated communities to new mid-rise and high-rise housing for residents.

Years in business
10
founded March 29, 2016
Portfolio value
USD 60 million estimated project development cost
August 14, 2018
Units delivered
249 units
as the company states it
Projects last researched October 15, 2026
Every figure on this card was read out of a document.

Overview

Investor tear sheet

a summary of the tabs that follow · no rating of our own

Company dossier

Legal name
AMBAR3, LLC1
Headquarters
1649 Atlantic Boulevard1, Jacksonville1, United States
Founded
March 29, 20161
Entity type
SUBSIDIARY1
Business model
build to rent1
Markets
1 market listed
What they build
no project types recorded
Full dossier in About →

Delivery record

0 date-assessed of 0 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
0
within the rolling ten-year window
Median delay
—
the middle of no scored projects
Average delay
—
the same projects, pulled by the worst
Average time to deliver
—
no delivered projects with a dated start — needs 3
Worst slip
—
0
early or less than 6 months late
6 to 12 months late
0
yellow rows below
Over 12 months late
0
red rows below

Against other developers

Not enough info yet.
Projects and timelines in Track Record →

Awards & recognition

All awards →

Risks & source coverage

  • DELIVERY DELAY Reported July 22, 2026; the petition describes delays during the development period through summer 2025. In a petition filed with Florida Housing on July 22, 2026, Ambar Riverview, Ltd. (the project entity for The Ambar, identified as developed by Ambar3, LLC) stated that the development experienced a nearly year-long building-permit delay, construction slowdowns and subcontractor shortages, and that a bonding company had to intervene to get the development placed in service; the filing also described a deteriorated relationship with the general contractor. This is a project-level finding, not evidence that Ambar3 itself defaulted.
  • REGULATORY September 22, 2023 (formal protest); financing approval was adopted May 20, 2025. A competing applicant filed a formal protest alleging that Ambar Station, Ltd., an Ambar3-sponsored project entity, should have been found ineligible for Florida Housing funding because its equity proposal was ambiguous and created a potential $33.7 million pre-completion funding shortfall; the source records the allegation and requested administrative relief, not a final finding that Ambar3 or the project was ineligible, and later Miami-Dade financing approval indicates the project proceeded.
  • LEGAL Final order adopted June 11, 2020. Ambar Trail, Ltd., associated with Ambar3, challenged Florida Housing’s selection process in an administrative proceeding; after a hearing, the administrative law judge recommended dismissal with prejudice for lack of standing, and Florida Housing’s board adopted that dismissal in a final order.
  • 1 more in Risk & Sources
Record status
active
Company sources
76 source entries across 76 fields
Projects tracked
0 · 0 completed in assessment
All flags and sources →

Track Record

Delivery record

0 date-assessed of 0 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
0
within the rolling ten-year window
Median delay
—
the middle of no scored projects
Average delay
—
the same projects, pulled by the worst
Average time to deliver
—
no delivered projects with a dated start — needs 3
Worst slip
—
0
early or less than 6 months late
6 to 12 months late
0
yellow rows below
Over 12 months late
0
red rows below

Against other developers

Not enough info yet.

Construction start to handover

0 of 0 projects dated · 0 places
Based on covered projects with documented construction or launch dates and available handover dates. Timelines vary by project and may not represent the developer’s full portfolio.
Construction start, or the launchTarget completion (window)Completion or handover, as reportedCurrently statedLaunch year only, no date publishedEarly or ≤6 mo lateOver 6–12 mo lateOver 12 mo lateStalled
No dated projects to plot.
Click a row in the chart to open a project, or a table row below to see its sources. The chart runs wider than the page where the record spans many years — scroll it sideways to follow a project to its handover. Every date we have is drawn. A hollow marker is only a launch year, not a date anyone published. No dates published means we looked and found none; dates not yet checked means we have not looked yet. Handing over is not finished — rows say which. A delay is shown when one source gives the promised date and another gives the real one, however rough: "2019" still counts, and the row shows how wide that is. Projects missing one of the two dates, or with sources that disagree, are left out of the figures.

About

Company dossier

Legal name
AMBAR3, LLC
Headquarters
1649 Atlantic Boulevard, Jacksonville, United States
32207
Founded
March 29, 2016
Jacksonville, United States
Entity type
SUBSIDIARY
Revenue
not published
Business model
build to rent

Partners

8 partners
Florida Housing Finance Corporation
government partner

Funding made Ambar Key possible.

Summit Contracting Group
contractor

Contractor for Ambar Key.

LanMar Design Group
partner

Architect for Ambar Key.

AH of Monroe
joint venture

Partnered with Ambar3 to redevelop Marty’s Place into a 47-unit affordable community.

BB&T
funder

Provided a $37.8 million construction loan for The Quarry.

Wells Fargo
funder

Purchased The Quarry tax credits.

SunTrust
funder

Provided The Quarry permanent loan as a Fannie Mae lender.

PQH Group
partner

Architect for The Quarry.

Sources: name

PRESS2020-03-11

Ambar3 To Celebrate The Grand Opening Of Ambar Key

March 11, 2020 · carried by vestcor.com
A combination of funding from Florida Housing Finance Corporation made this community possible.
value seen: Florida Housing Finance Corporation
https://vestcor.com/press-release/ambar3-to-celebrate-the-grand-opening-of-ambar-key/

Sources: name

PRESS2020-03-11

Ambar3 To Celebrate The Grand Opening Of Ambar Key

March 11, 2020 · carried by vestcor.com
Summit Contracting Group is the contractor and LanMar Design Group is the architect.
value seen: Summit Contracting Group
https://vestcor.com/press-release/ambar3-to-celebrate-the-grand-opening-of-ambar-key/

Sources: name

PRESS2020-03-11

Ambar3 To Celebrate The Grand Opening Of Ambar Key

March 11, 2020 · carried by vestcor.com
Summit Contracting Group is the contractor and LanMar Design Group is the architect.
value seen: LanMar Design Group
https://vestcor.com/press-release/ambar3-to-celebrate-the-grand-opening-of-ambar-key/

Sources: name

PRESSdate not shown in source

inside.

vestcor.com
Marty’s Place Ambar3, part of the Vestcor Companies, has partnered with a non-profit organization, AH of Monroe, to redevelop an existing multi-family property into a 47-unit, 3 story, garden-style affordable housing community.
value seen: AH of Monroe
https://vestcor.com/wp-content/uploads/Fall-2019-Vestcor-Revue.pdf

Sources: name

PRESS2018-08-14

The Vestcor Companies Break Ground on The Quarry in Big Coppitt Key, Florida

August 14, 2018 · carried by vestcor.com
BB&T provided a $37.8 million construction loan.
value seen: BB&T
https://vestcor.com/press-release/the-vestcor-companies-break-ground-on-the-quarry-in-big-coppitt-key-florida/

Sources: name

PRESS2018-08-14

The Vestcor Companies Break Ground on The Quarry in Big Coppitt Key, Florida

August 14, 2018 · carried by vestcor.com
Wells Fargo purchased the tax credits
value seen: Wells Fargo
https://vestcor.com/press-release/the-vestcor-companies-break-ground-on-the-quarry-in-big-coppitt-key-florida/

Sources: name

PRESS2018-08-14

The Vestcor Companies Break Ground on The Quarry in Big Coppitt Key, Florida

August 14, 2018 · carried by vestcor.com
SunTrust as a Fannie Mae lender provided the permanent loan.
value seen: SunTrust
https://vestcor.com/press-release/the-vestcor-companies-break-ground-on-the-quarry-in-big-coppitt-key-florida/

Sources: name

PRESS2018-08-14

The Vestcor Companies Break Ground on The Quarry in Big Coppitt Key, Florida

August 14, 2018 · carried by vestcor.com
Summit Contracting Group is the contractor and PQH Group is the architect.
value seen: PQH Group
https://vestcor.com/press-release/the-vestcor-companies-break-ground-on-the-quarry-in-big-coppitt-key-florida/

Registrations & licences

COMPANY NUMBERL16000061606
Florida Department of State · US · Active
Jurisdiction-agnostic: a DLD number, a Companies House number and a state RERA registration all land in the same table.

Contact

Markets

1 countries
United Statesactive 0 projects tracked

What they build

no project types recorded
A project counts once under each type it carries, so the shares add to more than the project count.

Management

Principals & executives

6 names found
JD
John D. Rood
John D. Rood founded The Vestcor Companies in 1983 and remains its chairman. The company credits him with managing acquisitions and development across more than 113 investment partnerships and over 105 communities; independent coverage identifies a University of Montana business degree and prior work with Carlson Companies.
Current title
Chairman, The Vestcor Companies
Experience
no career length stated
Companies before
Carlson Companies
Education
University of MontanaBachelor of Science
Other boards
Fidelity National Financial, Inc.Florida Prepaid College Board
Known for
nothing tagged
https://linkedin.com/in/john-rood-677a0670

Sources: education

PRESSdate not shown in source

John Rood – Florida 500

Florida Trend
EDUCATION: University of Montana (BS)
value seen: University of Montana (BS)
https://floridatrend500.com/real-estate/john-rood/

Sources: full name

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
### John D. Rood
value seen: John D. Rood
https://vestcor.com/about/leadership/

Sources: linkedin page

SOCIAL2026-09-25

John Rood

LinkedIn
# John Rood Chairman at The Vestcor Companies, Inc.
value seen: https://linkedin.com/in/john-rood-677a0670
https://linkedin.com/in/john-rood-677a0670

Sources: other boards

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
Mr. Rood currently serves on the Board of Directors of Fidelity National Financial, Inc. (FNF).
value seen: Board of Directors of Fidelity National Financial, Inc. (FNF)
https://vestcor.com/about/leadership/

Sources: previous companies

PRESSdate not shown in source

John Rood – Florida 500

Florida Trend
After college, I worked for Carlson Cos. in Minneapolis.
value seen: Carlson Cos.
https://floridatrend500.com/real-estate/john-rood/

Sources: summary

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
Mr. Rood began his real estate career in 1983 as founder of The Vestcor Companies. Under his direction, the company focused on brokerage of multifamily properties and then expanded into real estate investments, development, and construction.
value seen: began his real estate career in 1983 as founder
value paraphrased from this source
https://vestcor.com/about/leadership/

Sources: title

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
##### Chairman, The Vestcor Companies
value seen: Chairman, The Vestcor Companies
https://vestcor.com/about/leadership/
C“
Clarence “Steve” Moore
Clarence “Steve” Moore is president of The Vestcor Companies and oversees its operational, investment and strategic decisions. Public sources also identify him as a University of North Florida trustee and former assistant dean, with earlier audit experience at Ernst & Young and accounting and MBA degrees from UNF.
Current title
President, The Vestcor Companies
since November 9, 2016
Experience
no career length stated
Companies before
Ernst & Young LLPUniversity of North Florida
Education
University of North FloridaBachelor’s degree in accounting
University of North FloridaMaster’s degree in business administration
Other boards
University of North Florida Board of TrusteesDuval County Research and Development Authority
Known for
nothing tagged

Sources: education

PRESS2019-04-13

Steve Moore, President, Vestcor - The Future of Private Development in Northeast Florida

Rotary District 6970 · carried by dacdb.com
Mr. Moore received his bachelor’s degree in accounting and his master’s degree in business administration from the University of North Florida.
value seen: bachelor’s degree in accounting and his master’s degree in business administration from the University of North Florida
https://www.dacdb.com/rotary/accounts/6970/Bulletins/4383/The%20Gear%2004_16_19.pdf

Sources: full name

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
### Steve Moore
value seen: Steve Moore
https://vestcor.com/about/leadership/

Sources: other boards

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
Steve was recently appointed to the University of North Florida board of trustees.
value seen: University of North Florida board of trustees
https://vestcor.com/about/leadership/

Sources: previous companies

PRESS2019-04-13

Steve Moore, President, Vestcor - The Future of Private Development in Northeast Florida

Rotary District 6970 · carried by dacdb.com
He also worked as an auditor at Ernst & Young LLP in Jacksonville, Florida.
value seen: auditor at Ernst & Young LLP
https://www.dacdb.com/rotary/accounts/6970/Bulletins/4383/The%20Gear%2004_16_19.pdf

Sources: since

PRESS2019-04-13

Steve Moore, President, Vestcor - The Future of Private Development in Northeast Florida

Rotary District 6970 · carried by dacdb.com
Steve Moore has been the President at The Vestcor Companies, Inc., since November 9, 2016
value seen: since November 9, 2016
https://www.dacdb.com/rotary/accounts/6970/Bulletins/4383/The%20Gear%2004_16_19.pdf

Sources: summary

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
Steve Moore is responsible for the overall direction and performance of The Vestcor Companies, overseeing all operational and investment decisions.
value seen: responsible for the overall direction and performance
value paraphrased from this source
https://vestcor.com/about/leadership/

Sources: title

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
##### President, The Vestcor Companies
value seen: President, The Vestcor Companies
https://vestcor.com/about/leadership/
EA
Elena Adames
Elena Adames is Ambar3’s president and leads applications, design and development of its new properties in Southeast Florida. Independent reporting describes more than 21 years in affordable-housing and real-estate development, including approximately 35 developments and about 5,500 units, and says she formed Ambar3 with Vestcor’s principals in 2016.
Current title
President, Ambar3
since Mar 2016 - Present
Experience
no career length stated
Companies before
none sourced
Education
Florida International UniversityBachelor of Science in construction management
Other boards
none sourced
Known for
nothing tagged
Work email: eadames@ambarco.com1 Email
https://linkedin.com/in/elena-adames-84943953
We are proud to provide much needed workforce housing to this community. Vestcor March 11, 2020https://vestcor.com/press-release/ambar3-to-celebrate-the-grand-opening-of-ambar-key/

Sources: education

PRESSdate not shown in source

South Florida Update: Affordable Housing

Bisnow
She holds a Bachelor of Science degree in construction management from Florida International University, Miami, Florida.
value seen: Bachelor of Science degree in construction management from Florida International University
https://www.bisnow.com/webinar/south-florida/affordable-housing/south-florida-update-affordable-housing-5252

Sources: email

REGULATOR2025-11-17

RECEIVED

Florida Housing Finance Corporation
Elena M. Adames President Ambar3, LLC ... E-Mail: eadames@ambarco.com
value seen: eadames@ambarco.com
https://www.floridahousing.org/docs/default-source/legal/petitiond9415ad4-5fee-4c7c-b0b7-318d1783ad50.pdf?sfvrsn=128b3274_1

Sources: full name

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
### Elena Adames
value seen: Elena Adames
https://vestcor.com/about/leadership/

Sources: linkedin page

SOCIAL2026-09-08

Elena Adames

LinkedIn
# Elena Adames President at Ambar3, LLC
value seen: https://linkedin.com/in/elena-adames-84943953
https://linkedin.com/in/elena-adames-84943953

Sources: quotes

PRESS2020-03-12

Ambar3 To Celebrate The Grand Opening Of Ambar Key

The Vestcor Companies
“We are proud to provide much needed workforce housing to this community,” said Ambar3 President Elena Adames.
value seen: We are proud to provide much needed workforce housing to this community
https://vestcor.com/press-release/ambar3-to-celebrate-the-grand-opening-of-ambar-key/

Sources: since

SOCIAL2026-09-08

Elena Adames

LinkedIn
### President - Ambar3, LLC (Current) Mar 2016 - Present
value seen: Mar 2016 - Present
https://linkedin.com/in/elena-adames-84943953

Sources: summary

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
Elena Adames is responsible for the application process, design and development of new properties under Ambar3, LLC.
value seen: responsible for the application process, design and development
value paraphrased from this source
https://vestcor.com/about/leadership/

Sources: title

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
##### President, Ambar3
value seen: President, Ambar3
https://vestcor.com/about/leadership/
JF
Jason Floyd
Jason Floyd is the group CFO, responsible for finance, accounting, reporting, development financing and information technology. His published work history includes earlier controller and accounting roles at Vestcor, Jacksonville Sound & Communications and Eola Capital.
Current title
Chief Financial Officer, The Vestcor Companies
since Jan 2017 - Present
Experience
no career length stated
Companies before
Jacksonville Sound & Communications, Inc.Eola Capital
Education
University of North FloridaMBA
University of North Florida - College of Business AdministrationBBA (Accounting)
Other boards
none sourced
Known for
nothing tagged
https://linkedin.com/in/jason-floyd-71b1a735

Sources: education

DIRECTORYdate not shown in source

Jason Floyd Email & Phone Number

RocketReach
University of North Florida MBA 2000-2001 ... University of North Florida - College of Business Administration BBA (Accounting) 1996-2000
value seen: University of North Florida MBA
https://rocketreach.co/jason-floyd-email_30091934

Sources: full name

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
### Jason Floyd
value seen: Jason Floyd
https://vestcor.com/about/leadership/

Sources: linkedin page

SOCIAL2026-09-22

Jason Floyd - CFO at The Vestcor Companies, Inc.

LinkedIn
# Jason Floyd CFO at The Vestcor Companies, Inc.
value seen: https://linkedin.com/in/jason-floyd-71b1a735
https://linkedin.com/in/jason-floyd-71b1a735

Sources: previous companies

DIRECTORYdate not shown in source

Jason Floyd Email & Phone Number

RocketReach
VP of Finance @ Jacksonville Sound & Communications, Inc. (April 2012 - April 2013) ... Assistant Controller @ Eola Capital (December 2010 - July 2011)
value seen: Jacksonville Sound & Communications, Inc.
https://rocketreach.co/jason-floyd-email_30091934

Sources: since

SOCIAL2026-09-22

Jason Floyd

LinkedIn
#### CFO (Current) Jan 2017 - Present
value seen: Jan 2017 - Present
https://linkedin.com/in/jason-floyd-71b1a735

Sources: summary

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
Jason Floyd is responsible for the overall finance and accounting functions of The Vestcor Companies. Jason's responsibilities include financial reporting, financing for new and existing developments and information technology.
value seen: responsible for the overall finance and accounting functions
value paraphrased from this source
https://vestcor.com/about/leadership/

Sources: title

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
##### Chief Financial Officer, The Vestcor Companies
value seen: Chief Financial Officer, The Vestcor Companies
https://vestcor.com/about/leadership/
KT
Kevin Troup
Kevin Troup leads land acquisition, due diligence, concept planning, purchase negotiations and credit underwriting for Vestcor’s affordable-housing platform. The company specifically says he manages underwriting and approval for new developments under both TVC Development and Ambar3, LLC.
Current title
Vice President, TVC Development
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
nothing tagged

Sources: full name

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
### Kevin Troup
value seen: Kevin Troup
https://vestcor.com/about/leadership/

Sources: summary

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
In addition, Kevin maintains a strong relationship with our lenders and equity providers as he manages the credit underwriting and approval process on all new developments under TVC Development, Inc. and Ambar3, LLC.
value seen: approval process on all new developments under TVC Development, Inc. and Ambar3, LLC
value paraphrased from this source
https://vestcor.com/about/leadership/

Sources: title

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
##### Vice President, TVC Development
value seen: Vice President, TVC Development
https://vestcor.com/about/leadership/
A“
Alexander “Alex” Hepler
Alex Hepler is the group construction lead for new developments, covering planning, scheduling, permitting, cost estimating, reporting and quality management. Independent reporting identifies him as the Vestcor construction director overseeing the Coco Vista project and discussing the company’s affordable-housing delivery rationale.
Current title
Director of Construction, The Vestcor Companies
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
nothing tagged
https://www.linkedin.com/in/alex-hepler-5b029648
Vestcor was initially reluctant to undertake a project of this size in the Keys. The Keys Citizen March 23, 2022https://www.keysnews.com/news/local/coco-vista-latest-affordable-housing-project-in-middle-keys/article_78a13118-a9dc-11ec-924d-d797c0ff2a32.html

Sources: full name

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
### Alexander Hepler
value seen: Alexander Hepler
https://vestcor.com/about/leadership/

Sources: linkedin page

SOCIAL2026-09-05

Alex Hepler

LinkedIn
# Alex Hepler Director of Construction, The Vestcor Companies
value seen: https://www.linkedin.com/in/alex-hepler-5b029648
https://www.linkedin.com/in/alex-hepler-5b029648

Sources: quotes

PRESS2022-03-23

Coco Vista latest affordable housing project in Middle Keys

The Keys Citizen · carried by keysnews.com
Hepler admitted “Vestcor was initially reluctant to undertake a project of this size in the Keys” because of its location and access.
value seen: Vestcor was initially reluctant to undertake a project of this size in the Keys
https://www.keysnews.com/news/local/coco-vista-latest-affordable-housing-project-in-middle-keys/article_78a13118-a9dc-11ec-924d-d797c0ff2a32.html

Sources: summary

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
Alex Hepler is responsible for overseeing construction on all new developments for Vestcor. Alex’s responsibilities include project planning, scheduling, permitting, project cost estimating, construction reporting and quality management.
value seen: overseeing construction on all new developments
value paraphrased from this source
https://vestcor.com/about/leadership/

Sources: title

COMPANY2021-08-31

Leadership » Vestcor

The Vestcor Companies
##### Director of Construction, The Vestcor Companies
value seen: Director of Construction, The Vestcor Companies
https://vestcor.com/about/leadership/

Projects

Assessment coverage

Completed projects: 2016-10-15 through 2026-10-15. Initial research is capped at 10 completed projects and a separate delivery-risk search capped at 7 findings. Risk findings are not project assessment counts. Absence is not proof of a complete portfolio or no failures. Month-level dates overlapping a boundary are excluded from figures.

No qualifying completions found in this window.

0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.

Stalled, cancelled & overdue projects

0 evidenced cases
The capped delivery-risk search ran; no project-level exception cases are recorded here. Risk findings are listed under Risks and are separate from assessed projects. This does not establish that the developer has no delivery failures.

Completed projects

0 projects
ProjectLocationTypeUnitsFloorsAreaCostPayment planLaunchedConstruction startOriginal targetHandoverDelayConfidenceStatus
Click any row for the sources behind it. Cost basis matters: an estimated cost, a construction loan and a sale price are different numbers. Each row states which one it is, so they are never averaged together.

Awards

Awards & recognition

1 found
GOVERNMENT RECOGNITION Winner February 3, 2017
Florida Housing Finance Corporation RFA 2016-114 housing-credit funding selection · Ambar Key
Florida Housing Finance Corporation selected the Ambar Key application, identifying Ambar3, LLC as developer, for $2,150,000 in housing-credit funding and invited the applicant to enter credit underwriting.

Risks

Risk flags

4 found
DELIVERY DELAY Reported July 22, 2026; the petition describes delays during the development period through summer 2025.
In a petition filed with Florida Housing on July 22, 2026, Ambar Riverview, Ltd. (the project entity for The Ambar, identified as developed by Ambar3, LLC) stated that the development experienced a nearly year-long building-permit delay, construction slowdowns and subcontractor shortages, and that a bonding company had to intervene to get the development placed in service; the filing also described a deteriorated relationship with the general contractor. This is a project-level finding, not evidence that Ambar3 itself defaulted.
REGULATORY September 22, 2023 (formal protest); financing approval was adopted May 20, 2025.
A competing applicant filed a formal protest alleging that Ambar Station, Ltd., an Ambar3-sponsored project entity, should have been found ineligible for Florida Housing funding because its equity proposal was ambiguous and created a potential $33.7 million pre-completion funding shortfall; the source records the allegation and requested administrative relief, not a final finding that Ambar3 or the project was ineligible, and later Miami-Dade financing approval indicates the project proceeded.
LEGAL Final order adopted June 11, 2020.
Ambar Trail, Ltd., associated with Ambar3, challenged Florida Housing’s selection process in an administrative proceeding; after a hearing, the administrative law judge recommended dismissal with prejudice for lack of standing, and Florida Housing’s board adopted that dismissal in a final order.
DELIVERY DELAY Fall 2023 expected completion; 2025 completion
The Ambar, developed by Ambar3 (part of Vestcor Companies), was reported in fall 2022 as expected to be complete in fall 2023, but Vestcor’s current portfolio records completion in 2025; the documented delay appears resolved rather than ongoing as of 2026-10-15.

Record status

active
Coverageactive
Tracked sinceOctober 10, 2026
Last checkedOctober 15, 2026 this month
Profile last researchedOctober 15, 2026
Claim