Calgary Municipal Land Corporation is a City of Calgary-owned placemaking and development corporation. It master-plans and delivers public infrastructure, cultural venues, mixed-use districts, housing and commercial projects in Calgary, serving residents, visitors, civic partners, communities and private-sector developers and businesses.

Years in business
19
founded 2007
LinkedIn headcount
59
employees, as shown on LinkedIn · size band 11–50
Portfolio value
null 4 billion planned development
so far
Projects last researched October 11, 2026
Every figure on this card was read out of a document.

Overview

Investor tear sheet

a summary of the tabs that follow · no rating of our own

Company dossier

Legal name
CALGARY MUNICIPAL LAND CORPORATION1
Headquarters
430 - 8th Avenue SE1, Calgary1, Canada
Founded
20071
Entity type
SUBSIDIARY1
Business model
masterplan1, mixed use1, commercial1, other
Markets
1 market listed
What they build
Other (6 of 7) · Residential, for sale (1 of 7)
Full dossier in About →

Delivery record

3 date-assessed of 7 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
7
within the rolling ten-year window
Median delay
+3.0 mo
the middle of 3 scored projects
Average delay
+1.5 mo
the same projects, pulled by the worst
Average time to deliver
3.1 yrs
start to completion, over 3 delivered projects
Worst slip
+3.5 mo
Stampede Trail — Phase 1 · −3.0 to +10.0
3
early or less than 6 months late
6 to 12 months late
0
yellow rows below
Over 12 months late
0
red rows below

Against other developers

3 date-assessed here · 49 developers, 240 date-assessed projects in Canada
Median delay
CMLC·49 developers in Canada
+3.0 mo vs +8.0 mo
this developer 5.0 mo better
The typical project on each side.
Average delay
CMLC·49 developers in Canada
+1.5 mo vs +12.7 mo
this developer 11.2 mo better
Both pulled by their worst few.
On time
CMLC·49 developers in Canada
100% vs 44%
this developer 56 pts better
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Average time to deliver
CMLC·49 developers in Canada
3.1 yrs vs 4.1 yrs
this developer 1.0 yrs faster
Start to completion, over 3 delivered here and 182 in the market.
Projects and timelines in Track Record →

Resident experience

4 of 7 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
9.2/ 10
Weighted judgment across build and operations · from 4 of 4 rated buildings
Little structure evidence (1 of 4 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
8.6/ 10
Fabric, services, waterproofing, envelope · from 1 of 4 rated buildings
Management & living
9.2/ 10
Upkeep, response times, amenities, community · from 4 of 4 rated buildings

Against other developers

4 rated here · 50 developers, 247 rated buildings in Canada
Overall rating
CMLC · 50 other developers in Canada
9.2 vs 7.1
this developer 2.1 better
The weighted verdict on each side. From 4 of 4 rated buildings here and 247 in the market.
Structure & systems
CMLC · 50 other developers in Canada
— vs 5.7
Too few buildings with this score here to compare (1 of 4)
Fabric and engineering only — fixed at handover. From 1 of 4 rated buildings here and 105 in the market.
Management & living
CMLC · 50 other developers in Canada
9.2 vs 6.6
this developer 2.6 better
Upkeep and response — belongs to whoever runs the building now. From 4 of 4 rated buildings here and 226 in the market.
The market here is Canada: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.
Ratings by building →

Awards & recognition

  • PROJECT AWARD December 13, 2024
    ENR Global Best Projects Awards 2024 — Award of Merit, Cultural/Worship · BMO Centre Expansion
    The BMO Centre Expansion received an Award of Merit in ENR’s Cultural/Worship category; ENR identifies Calgary Municipal Land Corp. (CMLC) as the owner.
  • PROJECT AWARD Winner March 11, 2022
    2022 National Urban Design Award of Excellence · PARK PARK
    PARK PARK was selected for the Award of Excellence in the Urban Fragments category; CMLC’s project page documents CMLC’s partnership and delivery role for the project.
    Royal Architectural Institute of Canada, Canadian Institute of Planners and Canadian Society of Landscape Architects · https://raic.org/canadian-projects-selected-2022-national-urban-design-awards
  • PROJECT AWARD Winner 2017
    Mayor’s Urban Design Award — Civic Design Projects · C-SQUARE
    C-SQUARE won in the Civic Design Projects category, with Calgary Municipal Land Corporation identified as the owner.
  • 3 more in Awards
All awards →

Risks & source coverage

  • PROJECT CANCELLED Reported January 3, 2022; deal termination followed the December 21, 2021 decision not to proceed. The City of Calgary’s and Calgary Sports and Entertainment Corporation’s agreement for the new Victoria Park event centre—on which CMLC had been designated development manager—was officially terminated after unresolved issues; all work stopped. The matter was a project-partner failure, not a finding that CMLC itself defaulted, and CMLC later continued district work through other projects.
  • DELIVERY DELAY Reported December 6, 2022; the missed Alston start was summer 2022. CBC reported that East Village’s build-out was behind its original plan: two major parcels remained parking lots, there was no revised completion timetable, and Alston Properties had not started construction in the summer of 2022 as CMLC had previously announced; the article also reported that one developer forfeited a $1-million deposit after failing to start on time. CMLC and a neighbourhood representative attributed the slowdown largely to market and pandemic conditions, so this is documented delay rather than an allegation of misconduct.
  • DELIVERY DELAY Reported June 15, 2021; planned groundbreaking was August 1, 2021. The proposed Victoria Park event centre was placed on hold because of a difference between the budget estimate and program requirements; its planned August 2021 groundbreaking was considered unlikely, while CMLC was excluded from the City–CSEC cost negotiations despite being named project manager. The event-centre agreement was subsequently terminated, as described separately above.
  • 3 more in Risk & Sources
Record status
active
Company sources
136 source entries across 135 fields
Projects tracked
7 · 7 completed in assessment
All flags and sources →

Track Record

Delivery record

3 date-assessed of 7 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
7
within the rolling ten-year window
Median delay
+3.0 mo
the middle of 3 scored projects
Average delay
+1.5 mo
the same projects, pulled by the worst
Average time to deliver
3.1 yrs
start to completion, over 3 delivered projects
Worst slip
+3.5 mo
Stampede Trail — Phase 1 · −3.0 to +10.0
3
early or less than 6 months late
6 to 12 months late
0
yellow rows below
Over 12 months late
0
red rows below

Against other developers

3 date-assessed here · 49 developers, 240 date-assessed projects in Canada
Median delay
CMLC·49 developers in Canada
+3.0 mo vs +8.0 mo
this developer 5.0 mo better
The typical project on each side.
Average delay
CMLC·49 developers in Canada
+1.5 mo vs +12.7 mo
this developer 11.2 mo better
Both pulled by their worst few.
On time
CMLC·49 developers in Canada
100% vs 44%
this developer 56 pts better
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Average time to deliver
CMLC·49 developers in Canada
3.1 yrs vs 4.1 yrs
this developer 1.0 yrs faster
Start to completion, over 3 delivered here and 182 in the market.
The market here is Canada: every other developer whose head office is in the same country, because planning regimes and reporting norms move together within one. It is not a city, a sector or a size band. Read the two delay figures together. A median close to the market with a much better average means no single disaster; the reverse means one project is carrying the record. Time to deliver runs from the earliest start we hold to the completion itself — a construction start where a source gave one, otherwise a sales launch, otherwise the launch year read as its January. A handover the sources place only inside a year is read as that December, so a duration is the widest the record allows rather than the flattering end of it. Only delivered projects dated at both ends count, so it is taken over fewer projects than the delay figures, and a long build is not a fault: a tower is not a villa run. Sourced figures only, both sides, and values taken from documents held on file are excluded here — a developer who shares their records should not score better than one who does not.

Construction start to handover

7 of 7 projects dated · 1 place
Based on covered projects with documented construction or launch dates and available handover dates. Timelines vary by project and may not represent the developer’s full portfolio.
Construction start, or the launchTarget completion (window)Completion or handover, as reportedCurrently statedLaunch year only, no date publishedEarly or ≤6 mo lateOver 6–12 mo lateOver 12 mo lateStalled
Calgary, Canada
201320142015201620172018201920202021202220232024202520262027todayCALGARY, CANADA+2 moestimated+3 moverifiedcompleted, no target published+3.5 moverifiedcompleted, no target publishedcompleted, no target published−2 moverified
Click a row in the chart to open a project, or a table row below to see its sources. The chart runs wider than the page where the record spans many years — scroll it sideways to follow a project to its handover. Every date we have is drawn. A hollow marker is only a launch year, not a date anyone published. No dates published means we looked and found none; dates not yet checked means we have not looked yet. Handing over is not finished — rows say which. A delay is shown when one source gives the promised date and another gives the real one, however rough: "2019" still counts, and the row shows how wide that is. Projects missing one of the two dates, or with sources that disagree, are left out of the figures.

Building & Livability Ratings

Resident experience

4 of 7 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
9.2/ 10
Weighted judgment across build and operations · from 4 of 4 rated buildings
Little structure evidence (1 of 4 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
8.6/ 10
Fabric, services, waterproofing, envelope · from 1 of 4 rated buildings
Management & living
9.2/ 10
Upkeep, response times, amenities, community · from 4 of 4 rated buildings

Against other developers

4 rated here · 50 developers, 247 rated buildings in Canada
Overall rating
CMLC · 50 other developers in Canada
9.2 vs 7.1
this developer 2.1 better
The weighted verdict on each side. From 4 of 4 rated buildings here and 247 in the market.
Structure & systems
CMLC · 50 other developers in Canada
— vs 5.7
Too few buildings with this score here to compare (1 of 4)
Fabric and engineering only — fixed at handover. From 1 of 4 rated buildings here and 105 in the market.
Management & living
CMLC · 50 other developers in Canada
9.2 vs 6.6
this developer 2.6 better
Upkeep and response — belongs to whoever runs the building now. From 4 of 4 rated buildings here and 226 in the market.
The market here is Canada: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.

By building

4 rated · 3 not rated · scale 1–10
ProjectOverallStructure & systemsManagement & living
The Bounce Games ParkEast Village, Calgary
9.7/ 10
—/ 10
9.7/ 10

The largest located rating base is the Google-derived 4.8/5 from 39 reviews, which converts to 9.4/10 under the stated curve. Repeated praise for the art, design, activity and community atmosphere supports a modest upward commentary adjustment, while no structural evidence was published.

+ Vibrant public art+ Well-designed court+ Active community atmosphere+ Good pickup-game setting
− No drinking fountain− No restroom− Limited greenery

no notes returned

no links returned

Reviews describe The Bounce as “well-designed” and “well-utilized,” praising the art’s vibrancy and reporting “friendly strangers” and “good vibes.” The main operational criticism is the absence of basic amenities: reviewers mention that a “water fountain and restroom” would improve the site, while another says it “Needs some plants.”

The Open: East Village Public Washroom and Pickleball CourtEast Village, Calgary
9.4/ 10
—/ 10
9.4/ 10

Google Reviews/Maps is the only located published review aggregate for the specific facility and reports 4.8/5 from 11 reviews, which converts to 9.4/10 under the supplied curve. The separate CMLC operational survey reports 98% positive feedback, but it is not treated as a second review-platform rating; no recurring negative theme was located.

+ 98% positive in-facility survey+ On-site washroom attendants+ Clean and well-maintained operations+ Safety-focused staffing+ Accessible public amenity

no notes returned

no links returned

The strongest published operational evidence is CMLC’s report that The Open “maintained a 98% positive rating through in-facility surveys” after welcoming 40,330 visitors. Published operating material says two attendants provide custodial and facility-maintenance services so the space remains “safe, clean and well-maintained,” while attendant Greg described the role as helping him “feel connected again.”

Central LibraryEast Village, Calgary
9.2/ 10
—/ 10
9.2/ 10

Google’s building-specific aggregate of 4.7/5 from 3,227 reviews sets the level and converts to 9.3/10 under the requested curve. Yelp’s 4.0/5 is a smaller dissenting sample, while the written evidence adds substantial praise but also recurring accessibility concerns; those themes produce a modest net reduction to 9.2. Physical systems are not separately scored because the published material does not provide a systems or maintenance rating.

+ Striking curved architecture+ Natural light+ Warm wood interior+ Accessible exterior elevator+ Interior elevators and tactile indicators
− Raised or poorly placed ground-level fixtures− Hard-to-reach access controls− Long sloped walkway without handrails reported− Exterior stairs difficult to distinguish from seating− Elevator access route inconvenient
+ Helpful staff+ Welcoming atmosphere+ Spacious study and reading areas+ Children’s and meeting spaces+ Café, recording studio and free Wi-Fi reported
− Printer availability complaint− Crowding during busy periods− Accessibility-related self-checkout difficulty− Inconvenient accessible route− Cold and unwelcoming exterior streetscape reported

Reviews and reporting praise the building’s “stunning architecture,” curved design, warm wood and natural light. Early operational feedback identified physical-access problems: a wheelchair user reported getting stuck on raised fixtures and being unable to reach the elevator security button, while another said, “I can't reach the touchscreen”; a later review described the exterior stairs as “dangerous.” The library’s current accessibility page states that a 24/7 east-side exterior elevator, interior elevators and tactile indicators are available, but the available evidence does not establish when every reported issue was remedied.

Published reviews generally describe a welcoming daily experience: visitors mention “lots of open space,” comfortable seating, children’s and meeting areas, and staff who are “great and very helpful.” A 2020 patron described the library as “a really supportive environment,” while the Google review summary includes the contrary experience, “Not a printer in sight Waste of time.” The strongest lifestyle caveat is that the building’s access and approach can be cumbersome for mobility-challenged visitors, based mainly on 2018–2019 reporting; later current information documents an exterior elevator but does not date the fixes.

East Village off-leash dog parkEast Village, Calgary
8.6/ 10
8.6/ 10
8.6/ 10

The Google aggregate of 4.6/5 from 222 reviews sets the level and converts to 8.8/10 under the specified curve. The score is reduced modestly for the reported gate problem and partly offset by recurring positive comments about the scenic setting and friendly community; no separate platform with a review count of at least 10 materially disagreed.

+ Artificial turf+ Fully fenced+ Double-gated entry+ Agility obstacles+ Well-maintained space reported
− Reported north-gate closure problem− No water fountain− Limited shade− Compact footprint
+ Scenic Bow River setting+ Friendly community+ Dog socialization+ Seating+ Agility features
− No dog/owner water fountain− Limited shade− Small footprint− Intermittent waste-bag availability

Published descriptions identify artificial turf, full fencing and double-gated access; one visitor called it a “very well kept” space, while another reported that “both gates on the north side require fixing, both don't stay closed.” Reviews also note no shade and no water fountain, but there is no published evidence here of broader structural, plumbing, HVAC or electrical failures.

Visitors praise the setting—“Can't beat the scenery on a nice day either!”—and one reviewer says, “We've met so many nice dogs and owners here,” including positive socialization for a hesitant rescue dog. The main operational reservations are that the park is small, has no water fountain or shade, and bags may run out; a separate report says the north gates do not stay closed.

Only buildings that have reached handover are rated. 3 of 7 projects carry no rating: a building still under construction is never asked about, one that has just been handed over may not have been reached yet, and the rest were asked about and no published resident commentary was found. Structure is fixed at handover and stays the developer's; management and living belongs to whoever runs the building now. The overall verdict weights both rather than averaging them. None of this is checked: a rating is what people published about a building, aggregated — it is not evidence, it cannot move a delay figure, and it is not part of the delivery record above.

About

Company dossier

Legal name
CALGARY MUNICIPAL LAND CORPORATION
Headquarters
430 - 8th Avenue SE, Calgary, Canada
T2G 0L7
Founded
2007
Calgary, Canada
Entity type
SUBSIDIARY
Revenue
USD 9 million
Business model
masterplan, mixed use, commercial, other

Partners

10 partners
The City of Calgary
government partner

CMLC is currently collaborating with the City and our project partners in the delivery and oversight of the Arts Commons Transformation (ACT), Olympic Plaza Transformation (OPT), and other major projects underway.

BOSA Development
joint venture

A valued partner in CMLC’s redevelopment pursuits since 2010, BOSA Development is a fully integrated real estate construction, development and asset management company.

Slokker Homes
joint venture

Today, the company continues that tradition in Alberta by delivering carefully designed residential communities that emphasize liveability, light-filled spaces, and enduring value for homeowners and the neighborhoods they become part of.

RioCan Real Estate Investment Trust
joint venture

RioCan develops, owns and manages a variety of urban and suburban shopping centres across Canada.

Calgary Stampede
operator

The Calgary Stampede is a not-for-profit community organization that preserves and celebrates Calgary’s western heritage, cultures and community spirit.

The Confluence Historic Site & Parkland
operator

The land at the confluence of the Bow and Elbow rivers has been a place of Indigenous significance for thousands of years.

Werklund Centre
operator

Through WCT and OPT, this vital cultural institution will be a major catalyst to downtown Calgary’s revitalization.

Alston Properties
joint venture

Alston Properties is known for bringing creative and unique developments to urban settings throughout Western Canada.

Calgary Transit
government partner

CMLC and Calgary Transit have been working hand in hand since 2021 in the delivery of the 17th Avenue SE Extension & Victoria Park/Stampede Station Rebuild.

Attainable Homes
government partner

The two wholly owned subsidiaries of The City of Calgary formed a partnership for the site in 2023.

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
CMLC is currently collaborating with the City and our project partners in the delivery and oversight of the Arts Commons Transformation (ACT), Olympic Plaza Transformation (OPT), and other major projects underway.
value seen: The City of Calgary
held out of the figures · the quote does not carry this value
https://www.calgarymlc.ca/partners

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
A valued partner in CMLC’s redevelopment pursuits since 2010, BOSA Development is a fully integrated real estate construction, development and asset management company.
value seen: BOSA Development
https://www.calgarymlc.ca/partners

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
Today, the company continues that tradition in Alberta by delivering carefully designed residential communities that emphasize liveability, light-filled spaces, and enduring value for homeowners and the neighborhoods they become part of.
value seen: Slokker Homes
held out of the figures · the quote does not carry this value
https://www.calgarymlc.ca/partners

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
RioCan develops, owns and manages a variety of urban and suburban shopping centres across Canada.
value seen: RioCan Real Estate Investment Trust
held out of the figures · the quote does not carry this value
https://www.calgarymlc.ca/partners

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
The Calgary Stampede is a not-for-profit community organization that preserves and celebrates Calgary’s western heritage, cultures and community spirit.
value seen: Calgary Stampede
https://www.calgarymlc.ca/partners

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
The land at the confluence of the Bow and Elbow rivers has been a place of Indigenous significance for thousands of years.
value seen: The Confluence Historic Site & Parkland
held out of the figures · the quote does not carry this value
https://www.calgarymlc.ca/partners

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
Through WCT and OPT, this vital cultural institution will be a major catalyst to downtown Calgary’s revitalization.
value seen: Werklund Centre
held out of the figures · the quote does not carry this value
https://www.calgarymlc.ca/partners

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
Alston Properties is known for bringing creative and unique developments to urban settings throughout Western Canada.
value seen: Alston Properties
https://www.calgarymlc.ca/partners

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
CMLC and Calgary Transit have been working hand in hand since 2021 in the delivery of the 17th Avenue SE Extension & Victoria Park/Stampede Station Rebuild.
value seen: Calgary Transit
https://www.calgarymlc.ca/partners

Sources: partners

COMPANYdate not shown in source

Partners | Calgary Municipal Land Corporation

Calgary Municipal Land Corporation
The two wholly owned subsidiaries of The City of Calgary formed a partnership for the site in 2023.
value seen: Attainable Homes
held out of the figures · the quote does not carry this value
https://www.calgarymlc.ca/partners

Registrations & licences

COMPANY NUMBER2013025339
Corporate Registry of Service Alberta · CA · incorporated
Jurisdiction-agnostic: a DLD number, a Companies House number and a state RERA registration all land in the same table.

Contact

Markets

1 countries
Canadaactive 7 projects tracked

What they build

2 types
Other6 of 7
Residential, for sale1 of 7
A project counts once under each type it carries, so the shares add to more than the project count.

Management

Principals & executives

6 names found
AN
Alan Norris
Alan Norris is CMLC’s Board Chair and a veteran real-estate executive. He led Carma Developers and Brookfield Residential, and contributes senior housing and development experience to CMLC’s governance.
Current title
Chair, Board of Directors
Experience
no career length stated
Companies before
Brookfield PropertiesBrookfield ResidentialCarma DevelopersDeloitte
Education
Haskayne School of Business and Calgary Chamber2013 Distinguished Business Leader Award
SAITHonorary Bachelor Degree
Scotland and CanadaChartered Accountant designations
Other boards
Resolve Fundraising campaign (chair)Calgary Homeless Foundation (past Chairman)
Known for
Chairreal-estate executiveex-Carma Developersex-Brookfield Residentialaffordable-housing leader
since joined the CMLC Board of Directors in 2024

Sources: education

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan holds a bachelor’s degree in accounting and economics and chartered accountant designations in Scotland and Canada.
value seen: Haskayne School of Business and Calgary Chamber — 2013 Distinguished Business Leader Award
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: education

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan holds a bachelor’s degree in accounting and economics and chartered accountant designations in Scotland and Canada.
value seen: SAIT — Honorary Bachelor Degree
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: education

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan holds a bachelor’s degree in accounting and economics and chartered accountant designations in Scotland and Canada.
value seen: Scotland and Canada — Chartered Accountant designations
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: full name

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris (Chair): Alan Norris joined the CMLC Board of Directors in 2024.
value seen: Alan Norris
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris (Chair): Alan Norris joined the CMLC Board of Directors in 2024.
value seen: Resolve Fundraising campaign (chair)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris (Chair): Alan Norris joined the CMLC Board of Directors in 2024.
value seen: Calgary Homeless Foundation (past Chairman)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris most recently served as Managing Partner in Brookfield’s Real Estate Group and was Executive Chair of Brookfield Properties’ development group in North America until 2021.
value seen: Brookfield Properties
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
He joined Carma Developers in 1983 and became Chief Executive Officer in 1994.
value seen: Brookfield Residential
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
He joined Carma Developers in 1983 and became Chief Executive Officer in 1994.
value seen: Carma Developers
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
He joined Carma Developers in 1983 and became Chief Executive Officer in 1994.
value seen: Deloitte
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: since

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris (Chair): Alan Norris joined the CMLC Board of Directors in 2024.
value seen: joined the CMLC Board of Directors in 2024
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: summary

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris most recently served as Managing Partner in Brookfield’s Real Estate Group and was Executive Chair of Brookfield Properties’ development group in North America until 2021.
value seen: Alan Norris is CMLC’s Board Chair and a veteran real-estate executive. He led Carma Developers and Brookfield Residential, and contributes senior housing and development experience to CMLC’s governance.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris most recently served as Managing Partner in Brookfield’s Real Estate Group and was Executive Chair of Brookfield Properties’ development group in North America until 2021.
value seen: Chair
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris most recently served as Managing Partner in Brookfield’s Real Estate Group and was Executive Chair of Brookfield Properties’ development group in North America until 2021.
value seen: real-estate executive
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris most recently served as Managing Partner in Brookfield’s Real Estate Group and was Executive Chair of Brookfield Properties’ development group in North America until 2021.
value seen: ex-Carma Developers
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris most recently served as Managing Partner in Brookfield’s Real Estate Group and was Executive Chair of Brookfield Properties’ development group in North America until 2021.
value seen: ex-Brookfield Residential
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris most recently served as Managing Partner in Brookfield’s Real Estate Group and was Executive Chair of Brookfield Properties’ development group in North America until 2021.
value seen: affordable-housing leader
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: title

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Alan Norris (Chair): Alan Norris joined the CMLC Board of Directors in 2024.
value seen: Chair, Board of Directors
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330
KT
Kate Thompson
Kate Thompson is CMLC’s President & CEO, overseeing the East Village and Culture + Entertainment District master plans and Transit-Oriented Communities. Her architecture and development career includes leadership of major Calgary city-building projects, including the Central Library and BMO Centre Expansion.
Current title
President & CEO
Experience
no career length stated
Companies before
none sourced
Education
University of CalgaryMaster’s in Architecture
Other boards
none sourced
Known for
President & CEOArchitectAAAFRAICMaster’s in Architecture
since joined CMLC in 2013; President & CEO early in 2020

Sources: education

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Holding a Master’s in Architecture, Kate is a registered member of the Alberta Association of Architects (AAA) and a Fellow of the Royal Architectural Institute of Canada (FRAIC).
value seen: University of Calgary — Master’s in Architecture
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: full name

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kate Thompson, Architect, AAA, FRAIC (CMLC President & CEO): Kate Thompson is the President & CEO of Calgary Municipal Land Corporation (CMLC).
value seen: Kate Thompson
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: since

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kate has held numerous positions of leadership since she joined CMLC in 2013, including Director of Development, Vice President of Projects, and Vice President of Development.
value seen: joined CMLC in 2013; President & CEO early in 2020
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: summary

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kate has held numerous positions of leadership since she joined CMLC in 2013, including Director of Development, Vice President of Projects, and Vice President of Development.
value seen: Kate Thompson is CMLC’s President & CEO, overseeing the East Village and Culture + Entertainment District master plans and Transit-Oriented Communities. Her architecture and development career includes leadership of major Calgary city-building projects, including the Central Library and BMO Centre Expansion.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kate has held numerous positions of leadership since she joined CMLC in 2013, including Director of Development, Vice President of Projects, and Vice President of Development.
value seen: President & CEO
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kate has held numerous positions of leadership since she joined CMLC in 2013, including Director of Development, Vice President of Projects, and Vice President of Development.
value seen: Architect
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kate has held numerous positions of leadership since she joined CMLC in 2013, including Director of Development, Vice President of Projects, and Vice President of Development.
value seen: AAA
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kate has held numerous positions of leadership since she joined CMLC in 2013, including Director of Development, Vice President of Projects, and Vice President of Development.
value seen: FRAIC
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kate has held numerous positions of leadership since she joined CMLC in 2013, including Director of Development, Vice President of Projects, and Vice President of Development.
value seen: Master’s in Architecture
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: title

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kate Thompson, Architect, AAA, FRAIC (CMLC President & CEO): Kate Thompson is the President & CEO of Calgary Municipal Land Corporation (CMLC).
value seen: President & CEO
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330
GG
Greg Guatto
Greg Guatto is a CMLC director and the President & CEO of Aspen Properties. His real-estate track record includes acquiring and selling commercial properties, arranging mortgage financings, and leading the repositioning of One Palliser Square for residential use.
Current title
Board Director; Environmental, Health & Safety Committee member
Experience
no career length stated
Companies before
Aspen PropertiesTrizecHahn Properties Ltd.Knowlton Realty Ltd.
Education
Ivey Business School, University of Western OntarioHBA in Business Administration with Honours, 1990
Other boards
RESAC Downtown Vibrancy Sub-Committee (past chair)Provincial CORE Working Group (member)
Known for
Board memberPresident & CEO, Aspen Propertiescommercial real estateex-TrizecHahnHBA

Sources: education

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
He received his HBA in Business Administration with Honours from the Ivey Business School at University of Western Ontario in 1990.
value seen: Ivey Business School, University of Western Ontario — HBA in Business Administration with Honours, 1990
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: full name

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: Greg Guatto
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: RESAC Downtown Vibrancy Sub-Committee (past chair)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: Provincial CORE Working Group (member)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg previously worked with TrizecHahn Properties Ltd. and Knowlton Realty Ltd.
value seen: Aspen Properties
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
He received his HBA in Business Administration with Honours from the Ivey Business School at University of Western Ontario in 1990.
value seen: TrizecHahn Properties Ltd.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
He received his HBA in Business Administration with Honours from the Ivey Business School at University of Western Ontario in 1990.
value seen: Knowlton Realty Ltd.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: summary

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: Greg Guatto is a CMLC director and the President & CEO of Aspen Properties. His real-estate track record includes acquiring and selling commercial properties, arranging mortgage financings, and leading the repositioning of One Palliser Square for residential use.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: Board member
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: President & CEO, Aspen Properties
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: commercial real estate
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: ex-TrizecHahn
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: HBA
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: title

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Greg Guatto (Environmental, Health, & Safety Committee): Greg Guatto is the President & Chief Executive Officer of Aspen Properties, a privately held real estate company
value seen: Board Director; Environmental, Health & Safety Committee member
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330
MB
Muni Boga
Muni Boga is a CMLC director and the founder, President & CEO, and a director of Kudos. He brings experience across architecture, urban design, product development, marketing, branding, and strategy, with an innovation and culture-building track record.
Current title
Board Director; HR & Compensation Committee member
Experience
no career length stated
Companies before
Kudos
Education
University of CalgaryUrban Design Studies
Carleton UniversityArchitecture
Other boards
Kudos (director of the board)The C100 (alumni member)
Known for
Board memberFounderPresident & CEO, Kudostechnologyurban design
since joined the CMLC Board in 2023

Sources: education

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni studied Urban Design Studies at University of Calgary and Architecture at Carleton University
value seen: University of Calgary — Urban Design Studies
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: education

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni studied Urban Design Studies at University of Calgary and Architecture at Carleton University
value seen: Carleton University — Architecture
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: full name

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: Muni Boga
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: Kudos (director of the board)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: The C100 (alumni member)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni founded Kudos in 2010, a technology company specializing in corporate culture-building and today serves as its president & CEO and a director of the board.
value seen: Kudos
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: since

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: joined the CMLC Board in 2023
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: summary

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: Muni Boga is a CMLC director and the founder, President & CEO, and a director of Kudos. He brings experience across architecture, urban design, product development, marketing, branding, and strategy, with an innovation and culture-building track record.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: Board member
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: Founder
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: President & CEO, Kudos
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: technology
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: urban design
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: title

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Muni Boga (HR & Compensation Committee): Muni Boga joined the CMLC Board in 2023.
value seen: Board Director; HR & Compensation Committee member
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330
KB
Kent Brown
Kent Brown is a CMLC director and a climate-tech entrepreneur. He founded and led BluEarth Renewables and previously served as CEO of Canadian Hydro Developers, building renewable-energy platforms before their sales.
Current title
Board Director; Finance & Audit Committee and HR & Compensation Committee member
Experience
no career length stated
Companies before
BluEarth RenewablesCanadian Hydro Developers
Education
not published
Other boards
Creative Destruction Lab (mentor)Government of Alberta Climate Change Advisory Panel (appointed member)
Known for
Board memberFounder & CEOclimate techrenewable energyex-Canadian Hydro Developers
since joined the CMLC Board in 2021

Sources: full name

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: Kent Brown
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: Creative Destruction Lab (mentor)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: Government of Alberta Climate Change Advisory Panel (appointed member)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
He is the also the former CEO of Canadian Hydro Developers which was the largest Canadian renewable energy company when it sold in 2009.
value seen: BluEarth Renewables
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
He is the also the former CEO of Canadian Hydro Developers which was the largest Canadian renewable energy company when it sold in 2009.
value seen: Canadian Hydro Developers
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: since

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: joined the CMLC Board in 2021
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: summary

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: Kent Brown is a CMLC director and a climate-tech entrepreneur. He founded and led BluEarth Renewables and previously served as CEO of Canadian Hydro Developers, building renewable-energy platforms before their sales.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: Board member
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: Founder & CEO
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: climate tech
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: renewable energy
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: ex-Canadian Hydro Developers
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: title

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Kent Brown CPA, CA (Finance & Audit Committee, HR & Compensation Committee): Kent Brown joined the CMLC Board in 2021.
value seen: Board Director; Finance & Audit Committee and HR & Compensation Committee member
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330
JM
Jacqueline Moore
Jacqueline Moore is a CMLC director and a senior corporate legal executive at Suncor Energy. She brings experience in complex strategic commercial transactions and governance, alongside board and committee service in education, resource innovation, and philanthropy.
Current title
Board Director; Corporate Governance Committee Chair and Environmental, Health & Safety Committee member
Experience
no career length stated
Companies before
Suncor Energy Inc.
Education
University of CalgaryBachelor of Commerce Degree
University of CalgaryLaw Degree (LLB)
Other boards
Edge School for Athletes Society (board member)Clean Resource Innovation Network (board member & committee member)Suncor Energy Foundation (Vice Chair and Director)
Known for
Board memberGeneral Counselcorporate governanceSuncor EnergyLLB
since joined the CMLC Board in 2021

Sources: education

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline holds both a Bachelor of Commerce Degree and a Law Degree (LLB) from the University of Calgary.
value seen: University of Calgary — Bachelor of Commerce Degree
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: education

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline holds both a Bachelor of Commerce Degree and a Law Degree (LLB) from the University of Calgary.
value seen: University of Calgary — Law Degree (LLB)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: full name

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline Moore (Corporate Governance Committee Chair, Environmental, Health, & Safety Committee): Jacqueline Moore joined the CMLC Board in 2021.
value seen: Jacqueline Moore
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline is the Chief Legal Office and General Counsel at Suncor Energy Inc.
value seen: Edge School for Athletes Society (board member)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline is the Chief Legal Office and General Counsel at Suncor Energy Inc.
value seen: Clean Resource Innovation Network (board member & committee member)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: other boards

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline is the Chief Legal Office and General Counsel at Suncor Energy Inc.
value seen: Suncor Energy Foundation (Vice Chair and Director)
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: previous companies

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline is the Chief Legal Office and General Counsel at Suncor Energy Inc.
value seen: Suncor Energy Inc.
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: since

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline Moore (Corporate Governance Committee Chair, Environmental, Health, & Safety Committee): Jacqueline Moore joined the CMLC Board in 2021.
value seen: joined the CMLC Board in 2021
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: summary

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline Moore (Corporate Governance Committee Chair, Environmental, Health, & Safety Committee): Jacqueline Moore joined the CMLC Board in 2021.
value seen: Jacqueline Moore is a CMLC director and a senior corporate legal executive at Suncor Energy. She brings experience in complex strategic commercial transactions and governance, alongside board and committee service in education, resource innovation, and philanthropy.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline Moore (Corporate Governance Committee Chair, Environmental, Health, & Safety Committee): Jacqueline Moore joined the CMLC Board in 2021.
value seen: Board member
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline Moore (Corporate Governance Committee Chair, Environmental, Health, & Safety Committee): Jacqueline Moore joined the CMLC Board in 2021.
value seen: General Counsel
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline Moore (Corporate Governance Committee Chair, Environmental, Health, & Safety Committee): Jacqueline Moore joined the CMLC Board in 2021.
value seen: corporate governance
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline Moore (Corporate Governance Committee Chair, Environmental, Health, & Safety Committee): Jacqueline Moore joined the CMLC Board in 2021.
value seen: Suncor Energy
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: tags

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline Moore (Corporate Governance Committee Chair, Environmental, Health, & Safety Committee): Jacqueline Moore joined the CMLC Board in 2021.
value seen: LLB
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Sources: title

FILING2026-12-31

Calgary Municipal Land Corporation 2025 Annual Report

Calgary Municipal Land Corporation
Jacqueline Moore (Corporate Governance Committee Chair, Environmental, Health, & Safety Committee): Jacqueline Moore joined the CMLC Board in 2021.
value seen: Board Director; Corporate Governance Committee Chair and Environmental, Health & Safety Committee member
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://pub-calgary.escribemeetings.com/filestream.ashx?DocumentId=374330

Projects

Assessment coverage

Completed projects: 2016-10-15 through 2026-10-15. Initial research is capped at 10 completed projects and a separate delivery-risk search capped at 7 findings. Risk findings are not project assessment counts. Absence is not proof of a complete portfolio or no failures. Month-level dates overlapping a boundary are excluded from figures.

0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.

Stalled, cancelled & overdue projects

0 evidenced cases
The capped delivery-risk search ran; no project-level exception cases are recorded here. Risk findings are listed under Risks and are separate from assessed projects. This does not establish that the developer has no delivery failures.

Completed projects

7 projects
ProjectLocationTypeUnitsFloorsAreaCostPayment planLaunchedConstruction startOriginal targetHandoverDelayConfidenceStatus
The Heights — first phase (first two buildings)Calgary, Canada
Albert Park/Radisson Heights
residential for sale101————2025June 16, 2025Mar 2026 – May 2026Jun 2026+2.0 mo
(+1.0 to +3.0)
estimatedcompleted
The Open: East Village Public Washroom and Pickleball CourtCalgary, Canada
East Village
other——3,000 sq ft——2022August 2022Sep 2024 – Nov 2024Jan 2025+3.0 mo
(+2.0 to +4.0)
sourcedcompleted
Pixel ParkCalgary, Canada
The Culture + Entertainment District
other—————2023October 13, 2023—Oct 2023—not scorablecompleted
Stampede Trail — Phase 1Calgary, Canada
The Culture + Entertainment District
other—————2023Thu, Apr 6, 2023Jan 2023 – Dec 2023Sep 2023 – Nov 2023+3.5 mo
(−3.0 to +10.0)
sourcedcompleted
The Bounce Games ParkCalgary, Canada
East Village
other—————2019June 2019—Jun 2019—not scorablecompleted
East Village off-leash dog parkCalgary, Canada
East Village
other—————2018October 20, 2018—Oct 2018—not scorablecompleted
Central LibraryCalgary, Canada
East Village
other——240,000 sq ft245m
the amount has no currency or no basis
—201325 February 2013Nov 2018Sep 2018−2.0 mo
(−2.0 to −2.0)
sourcedcompleted
Click any row for the sources behind it. Cost basis matters: an estimated cost, a construction loan and a sale price are different numbers. Each row states which one it is, so they are never averaged together.

Awards

Awards & recognition

6 found
PROJECT AWARD December 13, 2024
ENR Global Best Projects Awards 2024 — Award of Merit, Cultural/Worship · BMO Centre Expansion
The BMO Centre Expansion received an Award of Merit in ENR’s Cultural/Worship category; ENR identifies Calgary Municipal Land Corp. (CMLC) as the owner.
PROJECT AWARD Winner March 11, 2022
2022 National Urban Design Award of Excellence · PARK PARK
PARK PARK was selected for the Award of Excellence in the Urban Fragments category; CMLC’s project page documents CMLC’s partnership and delivery role for the project.
Royal Architectural Institute of Canada, Canadian Institute of Planners and Canadian Society of Landscape Architects · https://raic.org/canadian-projects-selected-2022-national-urban-design-awards
PROJECT AWARD Winner 2017
Mayor’s Urban Design Award — Civic Design Projects · C-SQUARE
C-SQUARE won in the Civic Design Projects category, with Calgary Municipal Land Corporation identified as the owner.
PROJECT AWARD Winner 2017
Mayor’s Urban Design Award — Urban Fragments · Crossroads Garden Shed
Crossroads Garden Shed won in the Urban Fragments category, with Calgary Municipal Land Corporation identified as the owner.
PROJECT AWARD Winner 2017
Mayor’s Urban Design Award — Community Improvement Projects · East Village Junction
East Village Junction won in the Community Improvement Projects category, with Calgary Municipal Land Corporation identified as the owner.
PROJECT AWARD Highly commended 2019
Mayor’s Urban Design Award — Honourable Mention · East Village Dog Park
East Village Dog Park received an Honourable Mention in the Great City, Great Design category, with Calgary Municipal Land Corporation identified as the owner.

Risks

Risk flags

6 found
PROJECT CANCELLED Reported January 3, 2022; deal termination followed the December 21, 2021 decision not to proceed.
The City of Calgary’s and Calgary Sports and Entertainment Corporation’s agreement for the new Victoria Park event centre—on which CMLC had been designated development manager—was officially terminated after unresolved issues; all work stopped. The matter was a project-partner failure, not a finding that CMLC itself defaulted, and CMLC later continued district work through other projects.
DELIVERY DELAY Reported December 6, 2022; the missed Alston start was summer 2022.
CBC reported that East Village’s build-out was behind its original plan: two major parcels remained parking lots, there was no revised completion timetable, and Alston Properties had not started construction in the summer of 2022 as CMLC had previously announced; the article also reported that one developer forfeited a $1-million deposit after failing to start on time. CMLC and a neighbourhood representative attributed the slowdown largely to market and pandemic conditions, so this is documented delay rather than an allegation of misconduct.
DELIVERY DELAY Reported June 15, 2021; planned groundbreaking was August 1, 2021.
The proposed Victoria Park event centre was placed on hold because of a difference between the budget estimate and program requirements; its planned August 2021 groundbreaking was considered unlikely, while CMLC was excluded from the City–CSEC cost negotiations despite being named project manager. The event-centre agreement was subsequently terminated, as described separately above.
PROJECT CANCELLED Project paused April 2021; CSEC announced it would not proceed on 2021-12-21; agreement officially terminated in early January 2022.
Calgary’s Victoria Park Event Centre/arena project was cancelled after Calgary Sports and Entertainment Corporation (CSEC) said there was no viable path forward amid unresolved cost and scope issues; the City’s January 2022 memo said the agreement could not be resurrected and all work stopped, following CMLC’s earlier project-management role.
PROJECT CANCELLED 2016-04-20 city analysis; 2017-03-27 mayoral statement that the West Village project was dead.
The CalgaryNEXT West Village arena/stadium/fieldhouse proposal led by Calgary Sports and Entertainment Corporation was publicly described by Mayor Naheed Nenshi as “dead” in March 2017 after the City/CMLC analysis found the proposal infeasible in its then-current form and location; this was a separate proposal from the later Victoria Park event-centre deal.
DELIVERY DELAY CMLC target: summer 2022; missed as reported 2022-12-06; groundbreaking documented 2023-06-12.
Alston Properties’ East Village EV606 development missed CMLC’s announced summer-2022 construction target and remained unstarted in December 2022, but CMLC later documented a June 2023 groundbreaking, so the matter is reported as a delayed—subsequently restarted—project rather than an active abandonment.

Record status

active
Coverageactive
Tracked sinceOctober 11, 2026
Last checkedOctober 11, 2026 this month
Profile last researchedOctober 11, 2026