Dilmunia (Ithmaar Development Company)Manama, Bahrain · founded 2007-07-18 · 1 active markets
SUBSIDIARY

Ithmaar Development Company develops master-planned, mixed-use destinations in Bahrain, combining residences, commercial and retail facilities, hotels, leisure, infrastructure, and health-and-wellness amenities for residents, visitors, investors, and surrounding communities.

Years in business
19
founded 2007-07-18
Portfolio value
USD 1.6 billion development value
13 March 2013
Projects last researched October 13, 2026
Every figure on this card was read out of a document.

Overview

Investor tear sheet

a summary of the tabs that follow · no rating of our own

Company dossier

Legal name
Ithmaar Development Company Limited1
Headquarters
Manama1, Bahrain
Founded
2007-07-181
Entity type
SUBSIDIARY1
Business model
offplan for sale1, commercial1, mixed use1, masterplan1
Markets
1 market listed
What they build
Other (3 of 4) · Residential, for sale (1 of 4)
Full dossier in About →

Delivery record

2 date-assessed of 4 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
4
within the rolling ten-year window
Median delay
+27.5 mo
the middle of 2 scored projects
Average delay
+27.5 mo
the same projects, pulled by the worst
Average time to deliver
—
2 delivered projects with a dated start — needs 3
Worst slip
+52.5 mo
Dilmunia Grand Canal and Marina Phase III and part of Phase II · +51.0 to +54.0
1
early or less than 6 months late
6 to 12 months late
0
yellow rows below
Over 12 months late
1
red rows below

Against other developers

2 date-assessed projects here
Not enough info yet.
Projects and timelines in Track Record →

Resident experience

2 of 4 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
8.8/ 10
Weighted judgment across build and operations · from 2 of 2 rated buildings
Little structure evidence (0 of 2 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
—/ 10
Fabric, services, waterproofing, envelope · from 0 of 2 rated buildings
Management & living
8.2/ 10
Upkeep, response times, amenities, community · from 2 of 2 rated buildings

Against other developers

not enough rated buildings yet
Not enough rated buildings in Bahrain yet to compare against.
Ratings by building →

Awards & recognition

  • PROJECT AWARD Winner 24 October 2013
    2013 Arabian Property Award — Best Developer Website, Bahrain · Dilmunia at Bahrain website
    The developer reports that Ithmaar Development Company received the 2013 Arabian Property Award for the Dilmunia at Bahrain website, which was named Best Developer Website – Bahrain; the report also describes it as a 5-star International Property Award in that category.
All awards →

Risks & source coverage

  • PROJECT CANCELLED Reported March 11, 2010; status described as indefinite hold at publication. Ithmaar Development Company’s proposed $185 million, 44-storey Al-Seef tower in Bahrain was put on hold indefinitely after the developer could not obtain the required government approval; discussions about relocating it had not produced an agreement at the time of reporting.
  • DELIVERY DELAY Commitment reported 8 October 2019; continued fit-outs/opening activity reported 30 November 2020; subsequent launch reported 7 August 2024. Mall of Dilmunia, developed by Dilmunia Mall Development Company within the Dilmunia development managed by Ithmaar Development Company (IDC), was projected for completion by the end of 2019 but was still undergoing tenant fit-outs and further opening activity in November 2020; it was subsequently operating and relaunched as an outlet mall in August 2024, so the delay is historical rather than an active non-delivery finding.
  • DELIVERY DELAY Original Q4 2020 target published on the project page; July 2024 construction milestone and phase completion recorded by the contractor; research date 13 October 2026. The Dilmunia Grand Canal and Marina, commissioned by Ithmaar Development Company and constructed by Cebarco Bahrain WLL, had an original first-phase completion target of Q4 2020 but remained under construction in July 2024; the contractor records completion of a later canal/marina phase in July 2024, while a contemporaneous update said the marina still required a further connection phase, making this a documented historical delay with incomplete evidence of full overall completion by the research date.
Record status
active
Company sources
54 source entries across 54 fields
Projects tracked
4 · 4 completed in assessment
All flags and sources →

Track Record

Delivery record

2 date-assessed of 4 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
4
within the rolling ten-year window
Median delay
+27.5 mo
the middle of 2 scored projects
Average delay
+27.5 mo
the same projects, pulled by the worst
Average time to deliver
—
2 delivered projects with a dated start — needs 3
Worst slip
+52.5 mo
Dilmunia Grand Canal and Marina Phase III and part of Phase II · +51.0 to +54.0
1
early or less than 6 months late
6 to 12 months late
0
yellow rows below
Over 12 months late
1
red rows below

Against other developers

2 date-assessed projects here
Not enough info yet.

Construction start to handover

4 of 4 projects dated · 1 place
Based on covered projects with documented construction or launch dates and available handover dates. Timelines vary by project and may not represent the developer’s full portfolio.
Construction start, or the launchTarget completion (window)Completion or handover, as reportedCurrently statedLaunch year only, no date publishedEarly or ≤6 mo lateOver 6–12 mo lateOver 12 mo lateStalled
Muharraq, Bahrain
201320142015201620172018201920202021202220232024202520262027todayMUHARRAQ, BAHRAIN+52.5 moverified+2.5 moverified+46.5 moestimatedcompleted, no target published
Click a row in the chart to open a project, or a table row below to see its sources. The chart runs wider than the page where the record spans many years — scroll it sideways to follow a project to its handover. Every date we have is drawn. A hollow marker is only a launch year, not a date anyone published. No dates published means we looked and found none; dates not yet checked means we have not looked yet. Handing over is not finished — rows say which. A delay is shown when one source gives the promised date and another gives the real one, however rough: "2019" still counts, and the row shows how wide that is. Projects missing one of the two dates, or with sources that disagree, are left out of the figures. 2 turned out to be about something else — a phase, a neighbour, the wider masterplan — and are marked off-subject.

Building & Livability Ratings

Resident experience

2 of 4 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
8.8/ 10
Weighted judgment across build and operations · from 2 of 2 rated buildings
Little structure evidence (0 of 2 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
—/ 10
Fabric, services, waterproofing, envelope · from 0 of 2 rated buildings
Management & living
8.2/ 10
Upkeep, response times, amenities, community · from 2 of 2 rated buildings

Against other developers

not enough rated buildings yet
Not enough rated buildings in Bahrain yet to compare against.

By building

2 rated · 2 not rated · scale 1–10
ProjectOverallStructure & systemsManagement & living
Dilmunia Infrastructure — Phase IIDilmunia Island, Muharraq
10.0/ 10
—/ 10
8.8/ 10
Airbnb 5/5 · 47 reviews · hichee.com
Airbnb publishes 5/5 from 47 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 8.8.

The largest published review base located was the Airbnb aggregate for a Dilmunia short-stay apartment: 5/5 from 47 reviews, which converts to 10/10 under the supplied curve. This is weak evidence for a resident’s year and does not directly rate Phase II infrastructure; the score should therefore be treated as highly uncertain and indicative only, while structure remains unscored because no review-based structural rating was found.

+ Phase II infrastructure reported complete+ Electricity and utility networks+ Road and bridge infrastructure+ Sewer and surface-water systems
+ Peaceful setting+ Extensive leisure facilities+ 24/7 security+ Covered parking+ Central air conditioning
− Limited shopping and retail− Very limited nightlife and dining− Car-dependent access

no notes returned

The accessible short-stay material calls the setting “a quite Peaceful island” and lists pools, gyms, a water park, cinema, children’s areas and a mall walkway. A separate area profile reports 24/7 security, covered parking and central A/C, while its lifestyle indicators show shopping/retail at 4/10, nightlife/dining at 1/10 and access at 6/10; these are area-level indicators, not resident-management review comments.

SeavillaDilmunia Island, Muharraq32 units
7.5/ 10
—/ 10
7.5/ 10

The only building-specific published rating located is 4.3/5 on a page that does not state a review count, so it is treated as a very small evidence base and kept within one point of 6.5 under the stated rule. No structural review evidence was found, so structure remains unevidenced; the living score follows the constrained anchor without additional commentary adjustment.

+ covered parking+ 24/7 security+ central air conditioning+ maintenance service+ backup generator
− car-dependent location− limited nearby retail and dining

no notes returned

no links returned

The independent building listing reports a 4.3 Google rating and lists covered parking, 24/7 security, central A/C, backup generation and maintenance service. It also describes the surrounding area as “Very Car-Dependent,” with limited walkable amenities, and gives the wider 269 area 4/10 for shopping and retail and 1/10 for nightlife and dining; these are area indicators rather than Seavilla resident review comments.

Only buildings that have reached handover are rated. 2 of 4 projects carry no rating: a building still under construction is never asked about, one that has just been handed over may not have been reached yet, and the rest were asked about and no published resident commentary was found. Structure is fixed at handover and stays the developer's; management and living belongs to whoever runs the building now. The overall verdict weights both rather than averaging them. None of this is checked: a rating is what people published about a building, aggregated — it is not evidence, it cannot move a delay figure, and it is not part of the delivery record above.

About

Company dossier

Legal name
Ithmaar Development Company Limited
Headquarters
Manama, Bahrain
Bahrain Financial Harbour
Founded
2007-07-18
Bahrain
Entity type
SUBSIDIARY
Revenue
not published
Business model
offplan for sale, commercial, mixed use, masterplan

Partners

10 partners
Cebarco Bahrain
contractor

IDC awarded Cebarco Bahrain the first infrastructure phase, covering island roads, bridge, landscaping and utility networks.

Mott MacDonald Limited
partner

Mott MacDonald worked as the infrastructure designer alongside Cebarco Bahrain.

DG Jones & Partners
partner

DG Jones & Partners worked as cost consultants for the first infrastructure phase.

Naseej B.S.C. (c)
joint venture

The Nadeen School development joint venture was owned equally by IDC and Naseej.

Nadeen School
operator

IDC and its joint-venture partners developed and handed over Nadeen School’s new Dilmunia campus.

MSCEB Architects & Engineers
partner

MSCEB was awarded the design and supervision contract for the Dilmunia Mosque.

Al Ghanah Group
contractor

Al Ghanah Group was the contractor for the Nadeen School project.

Bin Faqeeh Real Estate Investment Company
joint venture

IDC sold strategically located Dilmunia plots to Bin Faqeeh for a USD45 million residential apartment project.

Cyprus Cybarco Tabet JV W.L.L.
contractor

Cyprus Cybarco Tabet JV W.L.L. was the main contractor for Mall of Dilmunia.

DP Architects
partner

DP Architects provided the international architectural design for Mall of Dilmunia.

Sources: partners

CONTRACTOR2013-03-13

Ithmaar Development Company awards Dilmunia Infrastructure Contract

Ithmaar Development Company · carried by dilmunia.com
We are proud to partner with Cebarco Bahrain, one of the largest and most reputable construction companies in the Kingdom.
value seen: Cebarco Bahrain
https://dilmunia.com/2013/03/ithmaar-development-company-awards-dilmunia-infrastructure-contract/

Sources: partners

CONTRACTOR2013-03-13

Ithmaar Development Company awards Dilmunia Infrastructure Contract

Ithmaar Development Company · carried by dilmunia.com
The contractor will be working closely with infrastructure designers Mott MacDonald Limited
value seen: Mott MacDonald Limited
https://dilmunia.com/2013/03/ithmaar-development-company-awards-dilmunia-infrastructure-contract/

Sources: partners

CONTRACTOR2013-03-13

Ithmaar Development Company awards Dilmunia Infrastructure Contract

Ithmaar Development Company · carried by dilmunia.com
and cost consultants DG Jones & Partners to deliver the services for the landmark project.
value seen: DG Jones & Partners
https://dilmunia.com/2013/03/ithmaar-development-company-awards-dilmunia-infrastructure-contract/

Sources: partners

PRESS2023-08-13

Ithmaar announces the completion of the new Nadeen School at Dilmunia

Zawya
The development JV is owned equally by IDC and Naseej.
value seen: Naseej B.S.C. (c)
held out of the figures · the quote does not carry this value
https://www.zawya.com/en/press-release/companies-news/ithmaar-announces-the-completion-of-the-new-nadeen-school-at-dilmunia-vu7hkz0r

Sources: partners

PRESS2023-08-13

Ithmaar announces the completion of the new Nadeen School at Dilmunia

Zawya
In partnership with our JV partners, we are proud to deliver on our vision to build a self-sustaining, balanced community in Dilmunia, with a school that caters to the needs of residents and citizens in and around Muharraq.
value seen: Nadeen School
held out of the figures · the quote does not carry this value
https://www.zawya.com/en/press-release/companies-news/ithmaar-announces-the-completion-of-the-new-nadeen-school-at-dilmunia-vu7hkz0r

Sources: partners

COMPANY2020-09-06

The Developer | Dilmunia Bahrain

Dilmunia
Ithmaar Development Company (IDC) has awarded the design and supervision contract of the Dilmunia Mosque to MSCEB Architects & Engineers.
value seen: MSCEB Architects & Engineers
https://dilmunia.com/dilmunia/the-developer/

Sources: partners

PRESS2023-08-13

Ithmaar announces the completion of the new Nadeen School at Dilmunia

Zawya
Al Ghanah Group, the project contractor made a final joint site visit to Nadeen School building at Dilmunia
value seen: Al Ghanah Group
https://www.zawya.com/en/press-release/companies-news/ithmaar-announces-the-completion-of-the-new-nadeen-school-at-dilmunia-vu7hkz0r

Sources: partners

COMPANY2014-05-03

Ithmaar Development Company, Bin Faqeeh announce USD45 million residential project at Dilmunia

Ithmaar Bank
The sale agreement ... covers the sale of strategically located plots
value seen: Bin Faqeeh Real Estate Investment Company
held out of the figures · the quote does not carry this value
https://www.ithmaarbank.com/media-center/ithmaar-development-company-bin-faqeeh-announce-usd45-million-residential-project-at-dilmunia

Sources: partners

COMPANY2017-04-23

Mall of Dilmunia Development Announced

Dilmunia
The main contractor for the project is Cyprus Cybarco Tabet JV W.L.L.
value seen: Cyprus Cybarco Tabet JV W.L.L.
https://dilmunia.com/2017/04/mall-of-dilmunia-development-announced/

Sources: partners

COMPANY2017-04-23

Mall of Dilmunia Development Announced

Dilmunia
the international architectural design is by DP Architects.
value seen: DP Architects
https://dilmunia.com/2017/04/mall-of-dilmunia-development-announced/

Registrations & licences

none found
Jurisdiction-agnostic: a DLD number, a Companies House number and a state RERA registration all land in the same table.

Contact

Markets

1 countries
Bahrainactive 4 projects tracked

What they build

2 types
Other3 of 4
Residential, for sale1 of 4
A project counts once under each type it carries, so the shares add to more than the project count.

Management

Principals & executives

6 names found
MF
Maysan Faisal Almaskati
Almaskati is identified by IDC as its Chairman and by Ithmaar as the chief executive of the parent holding company and its two wholly owned subsidiaries. His documented background includes senior investment and banking roles and representation of Ithmaar on several boards.
Current title
Chairman of IDC; Chief Executive Officer of Ithmaar Holding, Ithmaar Bank and IB Capital
Experience
26+ years banking
Companies before
Dux CapitalASMA Capital PartnersGulf One Investment Bank
Education
Kansas State UniversityBachelor of Science in Industrial Engineering
Other boards
Naseej B.S.C. (Closed)Family Microfinance House B.S.C. (Closed)Cityview Real Estate Development Company B.S.C. (Closed)Ithmaar-Dilmunia General Partner Company Limited
Known for
Chairman of IDCIthmaar Group CEOIndustrial Engineering degree
https://linkedin.com/in/maysan-almaskati-6166866
Despite the challenges in the real estate sector and the market conditions, our new corporate identity comes as part of the company’s strategic plans to enhance its performance and deliver innovative solutions that meet the requirements of this phase. Ithmaar Development Company 13 September 2026https://www.zawya.com/en/press-release/companies-news/idc-unveils-its-new-corporate-identity-561294

Sources: full name

PRESS2026-09-13

IDC unveils its new corporate identity

Ithmaar Development Company · carried by zawya.com
said the Chairman of IDC, Maysan Faisal Almaskati.
value seen: Maysan Faisal Almaskati
https://www.zawya.com/en/press-release/companies-news/idc-unveils-its-new-corporate-identity-561294

Sources: previous companies

COMPANYdate not shown in source

Emerging Stronger

Ithmaar Bank
Prior to joining Ithmaar Bank, he was Chief Investment Officer of Dux Capital (UAE) from 2017 to 2018
value seen: Dux Capital
https://www.ithmaarbank.com/media/ou2lmaty/ithmaar-bank-ar-2025-full-eng-p5.pdf

Sources: summary

COMPANY2024-06-11

Maysan Almaskati Named Ithmaar Chief Executive Officer

Ithmaar Bank
the appointment of Maysan Almaskati as the Chief Executive Officer of Ithmaar Holding and the Company’s two wholly-owned subsidiaries, Ithmaar Bank and IB Capital.
value seen: Chief Executive Officer of Ithmaar Holding, Ithmaar Bank and IB Capital
held out of the figures · the quote does not carry this value
https://www.ithmaarbank.com/media-center/maysan-almaskati-named-ithmaar-chief-executive-officer

Sources: tags

COMPANYdate not shown in source

Emerging Stronger

Ithmaar Bank
Mr. Almaskati holds a Bachelor of Science in Industrial Engineering from Kansas State University, USA
value seen: Bachelor of Science in Industrial Engineering
https://www.ithmaarbank.com/media/ou2lmaty/ithmaar-bank-ar-2025-full-eng-p5.pdf

Sources: title

PRESS2026-09-13

IDC unveils its new corporate identity

Ithmaar Development Company · carried by zawya.com
said the Chairman of IDC, Maysan Faisal Almaskati.
value seen: Chairman of IDC
https://www.zawya.com/en/press-release/companies-news/idc-unveils-its-new-corporate-identity-561294
NN
Nayef Nasser Alnasser
Alnasser became IDC’s Managing Director in January 2026, succeeding Mohammed Khalil Alsayed, and is responsible for day-to-day operations, key-project execution and new initiatives. He concurrently leads asset and remedial management at Ithmaar Bank and has a documented banking, restructuring and recovery track record.
Current title
Managing Director, Ithmaar Development Company; Head of Assets and Remedial Management, Ithmaar Bank
since 20 January 2026
Experience
27+ years banking
Companies before
Bahrain Islamic Bank B.S.C.
Education
University College of BahrainMBA with Distinction
Other boards
Nadeen School Dilmunia W.L.L.Ithmaar-Dilmunia General Partner Company LimitedBarbar Real Estate Development W.L.L.Health Island W.L.L.
Known for
Managing DirectorCBB-approved personMBA with DistinctionAsset and remedial management
https://linkedin.com/in/nayef-al-nasser-928a4421
The new marina represents a strategic step in elevating Bahrain’s maritime profile. Ithmaar Bank 24 February 2026https://www.ithmaarbank.com/media-center/ithmaar-development-company-announces-the-completion-of-pontoons-and-floating-facility-construction-in-dilmunia-marina/

Sources: full name

PRESS2026-01-20

IDC appoints Nayef Nasser Alnasser as a Managing Director

Ithmaar Development Company · carried by zawya.com
announced the appointment of Nayef Nasser Alnasser as a Managing Director of IDC
value seen: Nayef Nasser Alnasser
https://www.zawya.com/en/press-release/people-in-the-news/idc-appoints-nayef-nasser-alnasser-as-a-managing-director-s935tze4

Sources: since

PRESS2026-01-20

IDC appoints Nayef Nasser Alnasser as a Managing Director

Ithmaar Development Company · carried by zawya.com
MANAMA, BAHRAIN – 20 January 2026 – Ithmaar Development Company (IDC) ... announced the appointment of Nayef Nasser Alnasser as a Managing Director of IDC
value seen: 20 January 2026
https://www.zawya.com/en/press-release/people-in-the-news/idc-appoints-nayef-nasser-alnasser-as-a-managing-director-s935tze4

Sources: title

PRESS2026-01-20

IDC appoints Nayef Nasser Alnasser as a Managing Director

Ithmaar Development Company · carried by zawya.com
announced the appointment of Nayef Nasser Alnasser as a Managing Director of IDC, succeeding Mohammed Khalil Alsayed.
value seen: Managing Director of IDC
https://www.zawya.com/en/press-release/people-in-the-news/idc-appoints-nayef-nasser-alnasser-as-a-managing-director-s935tze4
EE
Elham Ebrahim Abdulla Hassan
Hassan is an independent board member of Ithmaar Holding and is documented as a member of the board of the Ithmaar-Dilmunia General Partner Company Limited, placing her within the governance structure around the Dilmunia investment. She is also documented as Chairwoman of Taaheal Healthcare and a board member of Mumtalakat Bahrain and BNP Paribas Investment Company–Saudi Arabia.
Current title
Independent Board Member, Ithmaar Holding; member of the Ithmaar-Dilmunia General Partner Company Limited Board of Directors
Experience
30+ years financial services
Companies before
PricewaterhouseCoopers
Education
not published
Other boards
Taaheal HealthcareMumtalakat – BahrainBNP Paribas Investment Company – Saudi Arabia
Known for
Independent board memberTaaheal Healthcare chairwomanFormer PwC partner

Sources: full name

COMPANYdate not shown in source

Ithmaar | Board of Directors

Ithmaar Bank
Elham Ebrahim Abdulla Hassan
value seen: Elham Ebrahim Abdulla Hassan
https://ithmaarbank.com/board-of-directors/

Sources: summary

COMPANYdate not shown in source

Ithmaar | Board of Directors

Ithmaar Bank
She is a member of the Ithmaar Holding, Ithmaar Bank, IB Capital and Ithmaar-Dilmunia General Partner Company Limited Boards of Directors.
value seen: member of the Ithmaar-Dilmunia General Partner Company Limited Boards of Directors
held out of the figures · the quote does not carry this value
https://ithmaarbank.com/board-of-directors/

Sources: title

COMPANYdate not shown in source

Ithmaar | Board of Directors

Ithmaar Bank
#### Independent Board Member
value seen: Independent Board Member
https://ithmaarbank.com/board-of-directors/
HP
HRH Prince Amr Mohammed Al Faisal
Prince Amr is the non-executive chairman of the Ithmaar banking group, the parent group identified in IDC announcements as owning IDC. His documented background spans commercial and investment banking, executive management, architecture and engineering, and he is also a founder and director of Red Sea Design Consultants.
Current title
Non-Executive Chairman, Ithmaar Bank and Ithmaar Holding
Experience
30+ years experience
Companies before
Dar Al-Maal Al-Islami Trust
Education
King Abdulaziz UniversityBachelor of Arts in Architecture
Other boards
Dar Al-Maal Al-Islami TrustFaisal Islamic Bank (Sudan)Faisal Islamic Bank (Egypt)Al Daleel Company for Information SystemsAl Wadi Company for Trading Ltd.Amr Establishment for Marketing and Commerce
Known for
Non-Executive ChairmanParent-group controlFounder and director

Sources: full name

COMPANYdate not shown in source

Ithmaar | Board of Directors

Ithmaar Bank
HRH Prince Amr Mohammed Al Faisal
value seen: HRH Prince Amr Mohammed Al Faisal
https://ithmaarbank.com/board-of-directors/

Sources: summary

COMPANYdate not shown in source

Ithmaar | Board of Directors

Ithmaar Bank
He is Chairman of the Board of Supervisors of Dar Al-Maal Al-Islami Trust (DMIT), and Chairman of Ithmaar Bank, Faisal Islamic Bank (Sudan) and Faisal Islamic Bank (Egypt).
value seen: Chairman of Ithmaar Bank
https://ithmaarbank.com/board-of-directors/

Sources: title

COMPANYdate not shown in source

Ithmaar | Board of Directors

Ithmaar Bank
#### Non-Executive Chairman
value seen: Non-Executive Chairman
https://ithmaarbank.com/board-of-directors/
EM
Einas Mohamed Fathalla Raheemi
Raheemi is documented as an IDC board member since January 2026 and as Ithmaar Bank’s executive senior manager responsible for enterprise support services and sustainability. Her documented experience is in human resources, corporate support, governance and sustainability within regulated banking.
Current title
Board Member, Ithmaar Development Company; Executive Senior Manager and Head of Enterprise Support Services & Sustainability, Ithmaar Bank
since since January 2026
Experience
21+ years banking
Companies before
none sourced
Education
AMA International UniversityMBA in Project Management
University of BahrainBSc Economics, Banking & Finance
Other boards
Waqf FundBIBF Islamic Finance Centre Advisory Committee
Known for
IDC board memberEnterprise support and sustainabilityMBA Project Management

Sources: full name

FILINGdate not shown in source

Profile of Candidates

Faysal Bank Limited
Ms. Einas Mohamed Fathalla Raheemi
value seen: Einas Mohamed Fathalla Raheemi
https://www.faysalbank.com/assets/documents/Profile-of-Candidates_1.pdf

Sources: since

FILINGdate not shown in source

Profile of Candidates

Faysal Bank Limited
Ithmaar Development Company Limited (IDC) Board Member (since January 2026)
value seen: since January 2026
https://www.faysalbank.com/assets/documents/Profile-of-Candidates_1.pdf

Sources: title

FILINGdate not shown in source

Profile of Candidates

Faysal Bank Limited
Ithmaar Development Company Limited (IDC) Board Member (since January 2026)
value seen: Ithmaar Development Company Limited (IDC) Board Member
https://www.faysalbank.com/assets/documents/Profile-of-Candidates_1.pdf
JH
Juma Hasan Abul
Abul is documented as an executive board member in the Ithmaar group governance structure, which controls IDC through the group’s wholly owned subsidiary. His profile records professional accounting qualifications, certification as a director and a career in banking and financial services.
Current title
Executive Board Member, Ithmaar Holding
Experience
no career length stated
Companies before
none sourced
Education
Cairo UniversityBachelor’s degree in Accounting
Other boards
none sourced
Known for
Executive board memberChartered accountantCertified director

Sources: education

COMPANYdate not shown in source

Ithmaar | Board of Directors

Ithmaar Bank
holds a bachelor’s degree in accounting from Cairo, (Egypt).
value seen: bachelor’s degree in accounting from Cairo
https://ithmaarbank.com/board-of-directors/

Sources: full name

COMPANYdate not shown in source

Ithmaar | Board of Directors

Ithmaar Bank
Juma Hasan Abul
value seen: Juma Hasan Abul
https://ithmaarbank.com/board-of-directors/

Sources: title

COMPANYdate not shown in source

Ithmaar | Board of Directors

Ithmaar Bank
#### Executive Board Member
value seen: Executive Board Member
https://ithmaarbank.com/board-of-directors/

Projects

Assessment coverage

Completed projects: 2016-10-15 through 2026-10-15. Initial research is capped at 10 completed projects and a separate delivery-risk search capped at 7 findings. Risk findings are not project assessment counts. Absence is not proof of a complete portfolio or no failures. Month-level dates overlapping a boundary are excluded from figures.

0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.

Stalled, cancelled & overdue projects

0 evidenced cases
The capped delivery-risk search ran; no project-level exception cases are recorded here. Risk findings are listed under Risks and are separate from assessed projects. This does not establish that the developer has no delivery failures.

Completed projects

4 projects
ProjectLocationTypeUnitsFloorsAreaCostPayment planLaunchedConstruction startOriginal targetHandoverDelayConfidenceStatus
Dilmunia Grand Canal and Marina Phase III and part of Phase IIMuharraq, Bahrain
Dilmunia Island
other———$ 8.95m
contract value
—2018mid-December 2018Jan 2020 – Apr 2020Jul 2024+52.5 mo
(+51.0 to +54.0)
sourcedcompleted
Dilmunia Infrastructure — Phase IIIMuharraq, Bahrain
Dilmunia Island
other—————2018early 2018Sep 2019 – Dec 2019Jan 2020+2.5 mo
(+1.0 to +4.0)
sourcedcompleted
SeavillaMuharraq, Bahrain
Dilmunia Island
residential for sale3213-storey———201311 June 2013May 2015 – Aug 2015May 2019+46.5 mo
(+45.0 to +48.0)
estimatedcompleted
Dilmunia Infrastructure — Phase IIMuharraq, Bahrain
Dilmunia Island
other————————Dec 2017—not scorablecompleted
Click any row for the sources behind it. Cost basis matters: an estimated cost, a construction loan and a sale price are different numbers. Each row states which one it is, so they are never averaged together.

Awards

Awards & recognition

1 found
PROJECT AWARD Winner 24 October 2013
2013 Arabian Property Award — Best Developer Website, Bahrain · Dilmunia at Bahrain website
The developer reports that Ithmaar Development Company received the 2013 Arabian Property Award for the Dilmunia at Bahrain website, which was named Best Developer Website – Bahrain; the report also describes it as a 5-star International Property Award in that category.

Risks

Auditor & credit ratings

audited accounts
AuditorKPMG

Risk flags

3 found
PROJECT CANCELLED Reported March 11, 2010; status described as indefinite hold at publication.
Ithmaar Development Company’s proposed $185 million, 44-storey Al-Seef tower in Bahrain was put on hold indefinitely after the developer could not obtain the required government approval; discussions about relocating it had not produced an agreement at the time of reporting.
DELIVERY DELAY Commitment reported 8 October 2019; continued fit-outs/opening activity reported 30 November 2020; subsequent launch reported 7 August 2024.
Mall of Dilmunia, developed by Dilmunia Mall Development Company within the Dilmunia development managed by Ithmaar Development Company (IDC), was projected for completion by the end of 2019 but was still undergoing tenant fit-outs and further opening activity in November 2020; it was subsequently operating and relaunched as an outlet mall in August 2024, so the delay is historical rather than an active non-delivery finding.
DELIVERY DELAY Original Q4 2020 target published on the project page; July 2024 construction milestone and phase completion recorded by the contractor; research date 13 October 2026.
The Dilmunia Grand Canal and Marina, commissioned by Ithmaar Development Company and constructed by Cebarco Bahrain WLL, had an original first-phase completion target of Q4 2020 but remained under construction in July 2024; the contractor records completion of a later canal/marina phase in July 2024, while a contemporaneous update said the marina still required a further connection phase, making this a documented historical delay with incomplete evidence of full overall completion by the research date.

Record status

active
Coverageactive
Tracked sinceOctober 12, 2026
Last checkedOctober 13, 2026 this month
Profile last researchedOctober 13, 2026
Claim
Work for this company? Claiming lets you correct the record with sources and get alerts when it changes.
For informational purposes only. This information is not investment, financial or credit advice and should not be relied on for investment, lending or credit decisions. Records may be incomplete or outdated. Verify information independently and seek qualified advice before making a decision.