Dubai Properties develops residential communities, master-planned destinations, commercial spaces, and mixed-use projects across Dubai. It serves residents, homeowners, and local and international investors through freehold sales and rental offerings, combining lifestyle design, infrastructure, and community amenities for living and investment.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| La Rosa 5Villanova, Dubai | 9.9/ 10 | —/ 10 | 6.7/ 10 Google Reviews/Maps 4/5 · 2 reviews · exa.ai Google Reviews/Maps publishes 4/5 from 2 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 6.7. |
The 4.9/5 Google Reviews/Maps aggregate from 14 reviews sets the level; under the requested conversion curve it converts to approximately 9.7/10. The available written reviews are strongly positive, especially about community amenities and walkability, but the evidence is limited and provides no published structural or management-systems assessment. | Not found in sources: No reported structural complaints · No published systems detail · No published plumbing feedback · No published HVAC feedback · No published electrical feedback · No published leak or waterproofing feedback | Not found in sources: No management feedback published · No security feedback published · No staff feedback published · No upkeep complaints published · Limited operational review detail | |
no notes returned no links returned | The six written reviews available on the Google-linked place page were uniformly positive: one calls it “Best place to live in dubai,” another says “Great community,” and another praises “lots of kids play areas and swimming pools” plus approximately 5 km of walking paths. The separate La Rosa 5 swimming-pool listing is rated 4.0/5 from 2 reviews, but no written pool complaints were available. | ||
| La Violeta 1Villanova, Dubai245 units | 9.6/ 10 | —/ 10 | 9.6/ 10 |
The building-specific aggregate of 4.8/5 from 12 reviews is the qualifying anchor and converts to 9.4/10 on the specified curve. The two displayed written reviews are positive and support a small upward commentary adjustment; no physical-condition review evidence was published, so structure remains unscored. | |||
no notes returned no links returned | The published building record shows an overall 4.8/5 from 12 reviews. The displayed resident feedback is positive: one reviewer calls the homes “very modern” and highlights the playground, swimming pool, shopping, restaurants and events; another describes the community as “growing.” | ||
| Mudon Al Ranim 2Mudon, Dubai176 units | 8.3/ 10 | 7.4/ 10 Property Finder 4.7/5 · 2 reviews · propertyfinder.ae Property Finder publishes 4.7/5 from 2 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.4. | 7.4/ 10 Property Finder 4.3/5, 4.7/5, 4.5/5, 5/5, 4.7/5, 4.7/5 · 2 reviews · propertyfinder.ae Combined from 6 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.4. |
Property Finder’s building page publishes a 4.7/5 overall rating from two reviews, which converts to 8.5/10 under the requested curve and therefore sets the anchor. Both written reviews are positive and the only negative evidence is a minor observation that facilities and retail are still developing; the small review base means the result is indicative rather than robust. | Not found in sources: No recurring structural complaint found · No leak complaint found · No plumbing complaint found · No HVAC failure complaint found · No electrical complaint found | Not found in sources: No management-speed feedback · No staff-attitude feedback | |
The only published physical-asset-related score located was Property Finder’s Maintenance score of 4.7/5 from the same two-review community aggregate; no reviewer reported leaks, plumbing, HVAC, electrical, lift or framework failures. Property Finder describes the homes as having “high-quality interiors” and lists central A/C and covered parking, but these are descriptions rather than independent engineering findings. | The two published reviews describe a calm, family-oriented experience: “Very peaceful community” and “amazed at how family-friendly this community is.” The second reviewer said the area was “very easy to reach and exit” via major roads and mentioned proximity to Global Village and Hamdan Sports Center; independent area guidance also notes that some facilities are still expanding, with retail and dining less established than in mature Dubai neighbourhoods. | ||
| Mudon Al Ranim 3Al Hebiah Sixth, Dubai242 units | 8.2/ 10 | —/ 10 | 7.4/ 10 Property Finder 4.7/5 · 2 reviews · propertyfinder.ae Property Finder publishes 4.7/5 from 2 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.4. |
The only published rating located for Mudon Al Ranim 3 is Property Finder’s 4.7/5 from 2 reviews, which converts to 8.2 on the resident-experience scale. Because that is the full available rating base and the written feedback is also positive, there is no basis for a downward or upward adjustment beyond the anchor conversion. | Not found in sources: no published structure feedback · no plumbing comments · no HVAC comments · no lift comments · no defect reports | Not found in sources: few written reviews · limited review base · no staff complaints published · no cleanliness complaints published | |
The published feedback is mostly about the setting rather than the fabric, but the project materials describe a new townhouse community with "premium imported flooring" and "modern modular kitchens". No reviewer mentioned leaks, plumbing, HVAC, or other building-system faults, so there is no published structural criticism to report. | The daily-living feedback is favorable but very thin: Hiba A. wrote, "Very peaceful community," while Andres R. said it is "very easy to reach and exit thanks to a couple of major roads nearby." The published score breakdown also points to strong livability, with "Family friendly 5.0" and "Amenities 4.7" alongside "Maintenance 4.7." | ||
| Mudon Al Ranim 5Mudon, Dubai182 units | 7.9/ 10 | —/ 10 | 7.4/ 10 Property Finder 4.3/5, 4.7/5, 4.5/5, 5/5, 4.7/5, 4.7/5 · 2 reviews · propertyfinder.ae Combined from 6 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.4. |
Property Finder has the largest applicable published review base, but it is only two reviews, so the score is kept at the required 6.5-centered level rather than using the unadjusted 4.7/5 conversion. The two written reviews are positive and no recurring negative or structural themes were published, but the evidence is too thin to justify a higher resident score. | Not found in sources: No management feedback · No staff feedback · No security feedback · No upkeep complaints published · No resident-service detail | ||
no notes returned no links returned | The two published Property Finder reviews were positive but mainly describe community-level experience rather than building operations: one says the community is “Very peaceful” and “family-friendly,” while the other says it is “very easy to reach and exit.” Property Finder also publishes 4.7/5 for the community overall, with 4.7/5 for peace and quiet, 5.0/5 for family friendliness, 4.7/5 for maintenance, and 4.7/5 for amenities; these are based on only two reviews. | ||
| La Rosa 6Villanova, Dubai | 7.8/ 10 | 6.2/ 10 Accommodation.info / Booking.com external reviews 7.5/10 · 1 review · accommodation.info Accommodation.info / Booking.com external reviews publishes 7.5/10 from 1 review. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 6.2. | 5.8/ 10 Accommodation.info / Booking.com external reviews 5/10, 7.5/10 · 1 review · accommodation.info Combined from 2 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 5.8. |
Google Reviews/Maps is the largest published building-specific aggregate located, at 5/5 from two reviews, which converts to 10 before the small-sample rule. Because no rating set reaches 10 reviews, the rules require keeping the score within one point of 6.5; the result is therefore 6.5, with no structural score because no published structural evidence was found. | Not found in sources: Limited resident evidence | ||
no notes returned no links returned | Published guest material describes a “quieter, residential experience” and praises “Comprehensive amenities,” including Wi‑Fi, a kitchen, washing machine and cable TV; the same listing reports a 10/10 score from three external reviews. A separate listing reports “Cleanliness 5.0/10,” while a resident petition says “Security here is getting really sloppy lately”; these are limited, mixed signals and do not establish a current building-wide pattern. | ||
| La Violeta 2Villanova, Dubai226 units | 7.7/ 10 | —/ 10 | —/ 10 |
Published building-specific review material was found, including two positive written entries on DubaiPicks, but no rating has a base of at least 10 reviews and fewer than three written reviews are available for a prose-only score. The result is therefore unscored under the supplied rules; completion evidence is also mixed in timing, with Property Finder publishing a March 2026 delivery date while FazWaz describes the project as completed in January 2026. | Not found in sources: No recurring structural complaint published · No recurring plumbing complaint published · No recurring HVAC complaint published · No recurring electrical complaint published · No recurring leak or waterproofing complaint published | Not found in sources: No recurring management complaint published · No recurring security complaint published · No recurring amenity complaint published · No recurring cleanliness complaint published · No recurring noise complaint published | |
The accessible written feedback is positive but very limited: one review describes “excellent execution,” quality finishing and “good sound insulation,” and says the work was completed on time. No reviewer-reported failure involving plumbing, HVAC, electrical systems, leaks or waterproofing was found; that is an evidence gap, not a finding of defect-free performance. | The small set of accessible reviews is favorable: one simply calls it a “Very nice community,” while another praises “friendly staff” who are ready to help and answer questions. Dubai Properties’ original project description promises parks, running tracks, playgrounds, pools and a community centre, but that is a developer description rather than resident feedback and should not be treated as a current completion confirmation. | ||
| Mudon Al Ranim 6Al Hebiah Sixth, Dubai242 units | 7.5/ 10 | —/ 10 | 7.5/ 10 |
Property Finder’s 4.7/5 community aggregate is the only published review-based aggregate located, but it rests on only two reviews, so the scoring rule keeps the result within one point of 6.5 despite an 8.5 curve conversion. Both written reviews are positive, but neither establishes recurring Phase-6-specific operational or structural conditions; therefore the overall score remains conservative at 7.5 and structure is unevidenced. | Not found in sources: Limited review base · No resident management evidence · No maintenance evidence specific to Phase 6 · No security feedback · No long-term occupancy evidence | ||
no notes returned no links returned | The two available written reviews are positive but describe the wider Mudon community rather than verified long-term operations inside Phase 6: one says it is “Very peaceful” and “family-friendly,” while the other highlights easy access and nearby Global Village and Hamdan Sports Center. Property Finder publishes community sub-scores including 4.7/5 for maintenance, 4.7/5 for amenities and 5.0/5 for family friendliness, but the review base is only two reviews and the project is newly completed/handed over around July 2026. | ||
| Mudon Al Ranim 4Dubailand, Dubai134 units | 7.3/ 10 | —/ 10 | —/ 10 |
The building-specific Google Reviews/Maps aggregate of 4.3/5 from 10 reviews sets the anchor at 7.0/10 under the specified conversion curve. No recurring complaint or praise theme met the reporting threshold, and the only negative construction comment is dated July 2024; later progress evidence records the project as 100% complete, so no commentary adjustment was applied. | Not found in sources: limited resident-review evidence | ||
no notes returned no links returned | The available comments are sparse but generally favourable: reviewers called it a “superb Place for Luxury apartments,” “Very Good Location,” and “Good 👍.” The one negative review, published July 1, 2024, said the project was still under construction and not finished; that dated observation should not be treated as current because later DLD-linked progress reporting records 100% completion before the October 7, 2026 research date. |
Dubai Properties evolved in 2005 to become a company of Dubai Holding.
Dubai Properties signed contracts worth AED 1.1 billion with Metac to build 850 townhouses in Villanova, Dubailand.
Dubai Land Department announced a strategic partnership with Dubai Properties to promote Dubai's real-estate sector.
Dubai Properties appointed ART Marine as the exclusive operator for Jaddaf Waterfront's marina.
du teamed up with Dubai Properties to provide smart ICT infrastructure for upcoming developments.
Etisalat teamed up with Dubai Properties to provide smart ICT infrastructure for upcoming developments.
Dubai Holding Real Estate and Commercial Bank of Dubai launched a home-financing programme for Dubai Properties customers.
Dubai Holding Real Estate partnered with Huspy to enhance the home-financing journey for Dubai Properties customers.
Dubai Holding Real Estate and Abu Dhabi Islamic Bank launched integrated Sharia-compliant home-financing solutions for Dubai Properties customers.
Dubai Holding Real Estate and Emirates NBD partnered to introduce integrated off-plan mortgage financing across Dubai Properties.
Dubai Properties evolved in 2005 to become a company of Dubai Holding
Dubai Properties evolved in 2005 to become a company of Dubai Holding
Dubai Properties evolved in 2005 to become a company of Dubai Holding
Dubai Properties, a subsidiary of Dubai Holding Real Estate, has signed contracts worth AED 1.1 billion with Metac General Contracting Co. LLC to build 850 townhouses in Villanova, Dubailand, supporting the next phase of the community’s expansion.
Dubai Properties, a subsidiary of Dubai Holding Real Estate, has signed contracts worth AED 1.1 billion with Metac General Contracting Co. LLC to build 850 townhouses in Villanova, Dubailand, supporting the next phase of the community’s expansion.
Dubai Properties, a subsidiary of Dubai Holding Real Estate, has signed contracts worth AED 1.1 billion with Metac General Contracting Co. LLC to build 850 townhouses in Villanova, Dubailand, supporting the next phase of the community’s expansion.
Dubai Land Department (DLD) has announced a strategic partnership with Dubai Properties (DP), a member of Dubai Holding, to promote Dubai’s ...
Dubai Land Department (DLD) has announced a strategic partnership with Dubai Properties (DP)
Dubai Land Department (DLD) has announced a strategic partnership with Dubai Properties (DP), a member of Dubai Holding, to promote Dubai’s ...
Dubai Properties has appointed ART Marine, the region’s largest and best-known 360-degree leisure marine enterprise, as the exclusive operat...
Dubai Properties has appointed ART Marine, the region’s largest and best-known 360-degree leisure marine enterprise, as the exclusive operat...
Dubai Properties has appointed ART Marine, the region’s largest and best-known 360-degree leisure marine enterprise, as the exclusive operat...
Telecom operators du and Etisalat have announced that they teamed up with Dubai Properties to provide smart ICT infrastructure for its upcom...
Telecom operators du and Etisalat have announced that they teamed up with Dubai Properties to provide smart ICT infrastructure for its upcom...
Telecom operators du and Etisalat have announced that they teamed up with Dubai Properties to provide smart ICT infrastructure for its upcom...
Telecom operators du and Etisalat have announced that they teamed up with Dubai Properties to provide smart ICT infrastructure for its upcom...
Telecom operators du and Etisalat have announced that they teamed up with Dubai Properties to provide smart ICT infrastructure for its upcom...
Telecom operators du and Etisalat have announced that they teamed up with Dubai Properties to provide smart ICT infrastructure for its upcom...
Dubai Holding Real Estate and Commercial Bank of Dubai launch home financing programme for Nakheel, Meraas and Dubai Properties customers
Dubai Holding Real Estate and Commercial Bank of Dubai launch home financing programme for Nakheel, Meraas and Dubai Properties customers
Dubai Holding Real Estate and Commercial Bank of Dubai launch home financing programme for Nakheel, Meraas and Dubai Properties customers
Dubai Holding Real Estate partners with Huspy to enhance home financing journey for Nakheel, Meraas and Dubai Properties customers
Dubai Holding Real Estate partners with Huspy to enhance home financing journey for Nakheel, Meraas and Dubai Properties customers
Dubai Holding Real Estate partners with Huspy to enhance home financing journey for Nakheel, Meraas and Dubai Properties customers
Dubai Holding Real Estate and Abu Dhabi Islamic Bank launch integrated Sharia-compliant home financing solutions for customers across Nakheel, Meraas and Dubai Properties
Dubai Holding Real Estate and Abu Dhabi Islamic Bank launch integrated Sharia-compliant home financing solutions for customers across Nakheel, Meraas and Dubai Properties
Dubai Holding Real Estate and Abu Dhabi Islamic Bank launch integrated Sharia-compliant home financing solutions for customers across Nakheel, Meraas and Dubai Properties
Dubai Holding Real Estate and Emirates NBD Partner to Introduce Integrated Off-Plan Mortgage Financing Across Meraas, Nakheel and Dubai Properties
Dubai Holding Real Estate and Emirates NBD Partner to Introduce Integrated Off-Plan Mortgage Financing Across Meraas, Nakheel and Dubai Properties
Dubai Holding Real Estate and Emirates NBD Partner to Introduce Integrated Off-Plan Mortgage Financing Across Meraas, Nakheel and Dubai Properties
| none found |
| United Arab Emirates | active 9 projects tracked |
| Residential, for sale | 10 of 10 |
Khalid holds a bachelor’s degree from the University of Arizona, USA, with a double major in Management Information Systems and Production and Operations Management. He also has a Master of Business Administration (MBA) from Zayed University, UAE.
### Khalid Al Malik
He is currently on the boards of several organisations, including SmartCity Malta, SmartCity Kochi, Warsan Waste Management Company, Tunisie Telecom and the Dubai Hills Estate group.
In the past, Khalid held several key positions within the Dubai government and private sector, including Director of Operations at the Dubai Development and Investment Authority, Chief Executive Officer of Dubai Industrial City and Chief Executive Officer of Tatweer.
Khalid Al Malik is the Chief Executive Officer of Dubai Properties, where he spearheads the company’s strategy of developing and shaping Dubai’s landscape through large-scale mixed-use developments and residential communities.
Khalid Al Malik, Executive Director Khalid Al Malik is the Group Chief Executive Officer of Dubai Properties Group (DPG) since July 2009.
Khalid Al Malik is the Managing Director of Dubai Holding, where he leads the real estate portfolio, including urban planning and infrastructure strategy and development. He is also responsible for the Group’s international real estate investments in places such as Malta and Kochi as well as managing its strategic relations with local and international investors, and its government affairs. Khalid lends his expertise to key real estate projects within Dubai Holding’s subsidiaries and also serves as the Chief Executive Officer of Dubai Holding Real Estate.
##### Chief Executive Officer Dubai Properties
### Bachelor of Science, ENGINEERING at Marquette University ... ### Master of International Business, International Business at University of Wollongong
# AbdulRahman Alhashmi
### Director of Engineering Department - Ministry of Health and Prevention - UAE ... ### Projects Head (Healthcare Seconded) - Abu Dhabi Works Department
May 2016 - Present (10 years and 4 months) in Dubai, Dubai, United Arab Emirates
Strategically drive the seamless execution of diverse development projects, from initial concept and design through on-site supervision to completion and handover, ensuring alignment with budgetary, quality, and timeline objectives across various sectors
Having 35 years of experience ... maintaining quality standards and upholding budgetary constraints ... hold a Bachelor of Science in Engineering from Marquette University, Milwaukee, in the USA, and a Masters in International Business from the University of Wollongong
#### Chief Officer Project Execution (Current)
#### Doctor of Philosophy (PhD) Architecture and Urban Design ... #### Master of Architecture (M.Arch.) Architecture and Urban Design ... #### Town Planning
# Nasreldain Mahamoud
### Head of Development & Operations Board Member - Al Hanoo Real Estate
### Head of Development & Operations Board Member - Al Hanoo Real Estate ... ### Managing Director - Al Bask Consultancy ... ### Project Director - Limitless ... ### Senior Development Manager - Emaar ... ### Design Architect - PIP Engineering Design Office ... ### Junior Architect - SHS Architectural Engineering Office
Jun 2015 - Present (11 years and 3 months) in Dubai, Dubai, United Arab Emirates
Architect (PhD)/Real Estate Development Specialist. Over 23 years of experience in Real Estate Development and Consulting in leading companies in Europe, Africa and Middle East. ... Proven record of effectively managing Large Scale (Multi Billion US$) Master Planned Residential Communities and Mixed Use Developments
### Senior Development Manager - Emaar ... ### Project Director - Limitless ... #### Doctor of Philosophy (PhD) Architecture and Urban Design
### Executive Director, Developemnt - Dubai Properties (DP) (Current)
### Graduate Deploma, Real Estate Management at KTH Royal Institute of Technology ... ### Bachelor of Applied Science (B.A.Sc.), Civil Engineering at Northeastern University
# Abdulrahman Al Baghash
### Project Coordinator - Government of Dubai, Department of Civil Aviation - Eng'g Projects Division
Oct 2016 - Present (9 years) ... Jun 2018 - Present (8 years and 2 months) in United Arab Emirates
#### Head Of Projects & Contracts Department (Current) ... #### Executive Director (Current) ... #### Project Director ... #### Senior Project Manager ... #### Project Manager
### Graduate Deploma, Real Estate Management at KTH Royal Institute of Technology ... ### Bachelor of Applied Science (B.A.Sc.), Civil Engineering at Northeastern University
#### Head Of Projects & Contracts Department (Current) ... #### Executive Director (Current)
### Bachelor of Architecture (BArch), Architectural Engineering at United Arab Emirates University ... ### Master of Construction Management, Engineering and Real Estate at Sheffield Hallam University ... ### High Diploma, Real Estate and Properties Management at KTH Royal Institute of Technology
# Jassim AlAbdool
Dec 2005 - Present (20 years and 9 months)
Develop and manage the real estate portfolio of local and international investments
### Executive Director - Dubai Properties (DP) (Current)
### M.Sc., Mechatronics at American University of Sharjah ... ### B.Sc, Electrical Engineering with concentration in Computer Engineering at Northeastern University
# Juma Bindarwish
### Director Commercial - Imdaad Group ... ### Dubai World Trade Centre ... ### Engineer Security and AV - Dubai Airports
Feb 2014 - Present (12 years and 7 months)
### Director Commercial - Imdaad Group ... ### Dubai World Trade Centre ... ### Engineer Security and AV - Dubai Airports
### Executive Director - Dubai Properties (DP) (Current)
0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mudon Al Ranim 7 | Dubai, United Arab Emirates Dubailand | residential for sale | 2481 | — | — | — | 60/401 | 2023 | August 1, 2023 | Jul 2026 – Sep 2026 | Sep 2026 | +1.0 mo (0.0 to +2.0) | sourced | completed |
| Mudon Al Ranim 5 | Dubai Mudon | residential for sale | 1821 | — | — | — | 60/401 | 2023 | July 1, 2023 | Jul 2026 | Jul 2026 | 0.0 mo (0.0 to 0.0) | sourced | completed |
| Mudon Al Ranim 6 | Dubai, United Arab Emirates Al Hebiah Sixth | residential for sale | 2421 | — | — | — | 10/50/401 | 2023 | July 20, 2023 | Jul 2026 | Jul 2026 | 0.0 mo (0.0 to 0.0) | sourced | completed |
| Mudon Al Ranim 4 | Dubai, United Arab Emirates Dubailand | residential for sale | 1341 | — | — | AED 116.3m other | 10/50/401 | 2023 | 1 Mar 2023 | May 2026 | Jan 2026 | −4.0 mo (−4.0 to −4.0) | sourced | completed |
| Mudon Al Ranim 3 | Dubai, United Arab Emirates Al Hebiah Sixth | residential for sale | 2421 | — | — | AED 212.2m other | 10% / 50% / 40%1 | 2022 | August 1, 2022 | Sep 2025 | Sep 2025 | 0.0 mo (0.0 to 0.0) | sourced | completed |
| La Violeta 2 | Dubai, United Arab Emirates Villanova | residential for sale | 2261 | — | — | — | 60/401 | 2022 | February 1, 2022 | Jul 2024 – Sep 2024 | Jul 2025 | +11.0 mo (+10.0 to +12.0) | sourced | completed |
| Mudon Al Ranim 2 | Dubai, United Arab Emirates Mudon | residential for sale | 1761 | — | — | — | 10/40/501 | 2022 | July 1, 2022 | — | May 2025 | — | not scorable | completed |
| La Violeta 1 | Dubai, United Arab Emirates Villanova | residential for sale | 2451 | — | — | — | 10% / 40% / 50%1 | 2022 | May 15, 2022 | Jan 2025 – Mar 2025 | Feb 2025 | 0.0 mo (−1.0 to +1.0) | sourced | completed |
| La Rosa 6 | Dubai, United Arab Emirates Villanova | residential for sale | — | — | — | AED 189.9m other | 10/40/501 | 2021 | December 6, 2021 | Dec 2024 | Dec 2024 | 0.0 mo (0.0 to 0.0) | sourced | completed |
| La Rosa 5 | Dubai, United Arab Emirates Villanova | residential for sale | — | Not stated | — | AED 152.2m estimated cost | 10/40/501 | 2021 | September 15, 2021 | Sep 2024 | Aug 2024 | −1.0 mo (−1.0 to −1.0) | sourced | completed |
| Coverage | active |
| Tracked since | October 6, 2026 |
| Last checked | October 7, 2026 this month |
| Profile last researched | October 7, 2026 |
| Claim |