Dubai South Properties develops and sells residential communities in Dubai South, near Al Maktoum International Airport, including apartments, townhouses, villas and mixed-use master-planned districts. Its customers are homebuyers, investors and residents seeking integrated communities with amenities, infrastructure and regional connectivity.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| The Pulse Beachfront 2Residential District, Dubai198 units | 8.2/ 10 | —/ 10 | 7.5/ 10 Property Finder 5/5, 4.4/5, 5/5, 5/5, 5/5, 5/5 · 2 reviews · propertyfinder.ae Nestopa 4/5 · 1 review · nestopa.com Combined from 7 published figures on 2 platforms, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.5. |
Google Reviews/Maps provides the largest published review base, 4.4/5 from 89 reviews, which converts to 8.2/10 under the specified curve. The written reviews are mixed: several praise the quiet, spacious and landscaped setting, while three report sewage odour and one reports very slow management. No separate structure score is supported by the reported rows. | Not found in sources: No published structural score | ||
Published reviews contain a recurring infrastructure-related complaint rather than an engineering inspection: three reviewers describe sewage odour entering or affecting homes. One wrote that it was “often making it not possible to sit outside or have your aircon on as it comes through the vents,” while another said the smell “seeps in to your townhouse.” No published review-based rating for structural condition, plumbing, HVAC, lifts or finishing was found. | Residents and visitors praise the quiet setting, large homes, greenery and amenities; one review called it “very quiet and peaceful,” and another described “wide, clean roads and lush greenery.” Daily-life criticism is substantial in the recent reviews: sewage odour is described as entering homes, while another reviewer says management does not answer calls and app requests take many days; an earlier review also said the gym, children’s play area and pool still needed to open. | ||
| The Pulse Boulevard Apartments C3Dubai South Residential District, Dubai157 units | 7.7/ 10 | —/ 10 | 7.0/ 10 |
The Google Reviews/Maps building aggregate of 3.9/5 from 22 reviews sets the anchor and converts to 6.7/10. Recurring positive themes about the setting, convenience, security and parking move the result modestly upward; the lone older materials complaint is not recurring and the evidence is too thin for a structure score. | Not found in sources: No reported leaks in one review | Not found in sources: Limited review detail · No verified current management rating | |
Structural and systems evidence is sparse and mixed. One 2024 reviewer reported that the apartment had “zero leaks or damage” after severe storms and that electricity and internet were uninterrupted, while a 2022 reviewer alleged “very poor building materials” and said the building was “falling apart inside and outside”; the older complaint is a single report, so current physical-condition conclusions remain uncertain. | Published feedback is generally positive about day-to-day living: reviewers describe the area as “calm and family friendly,” with “minimal traffic,” nearby basics, security and parking; one resident also reported a 24-hour maintenance team. The main operational caution is that the material-quality complaint was published in 2022, while the more favorable operational comments are from 2023–2024, so the evidence does not establish that the complaint reflects conditions on 2026-10-07. | ||
| The Pulse Beachfront — Phase 1Residential District, Dubai251 units | 7.2/ 10 | 6.8/ 10 | 7.5/ 10 Nestopa 4/5 · 1 review · nestopa.com Property Finder 4.9/5 · 2 reviews · propertyfinder.ae Combined from 2 published figures on 2 platforms, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.5. |
Google Reviews/Maps provides the largest published review base, 4.4/5 from 89 reviews, which converts to 8.2/10 on the specified curve. The score is reduced for multiple resident reports of persistent sewage odour and repeated management delays, while positive comments about the facilities, quiet setting and community quality prevent a larger downward adjustment. Structural scoring is kept lower than the overall score because the written evidence contains an infrastructure-related odour complaint but no independent structural rating. | Not found in sources: No published engineering score · No published waterproofing score | ||
The published resident feedback contains a serious infrastructure-related complaint: one reviewer said, "Most days the house smells like sewage," while another said the odour "seeps in to your townhouse." A separate review alleged that the floor traps were connected to the sewage outlet; these are resident reports, not an independent engineering finding. The older project reporting described Phase 1 as complete and its homes as having private gardens, covered parking and closed kitchens, but it did not publish structural or systems scores. | Day-to-day feedback is divided. Positive comments describe a "great community," good facilities and large gardens, while negative reviews report that management does not answer calls and that app requests take days; a July 2025 review also said the gym, kids’ area and pool still needed to open. Bayut independently characterises the area as peaceful but notes that public transport is limited and residents mainly rely on private vehicles. | ||
| The Pulse Boulevard GroveDubai South Residential District, Dubai108 units | 6.9/ 10 | —/ 10 | 6.5/ 10 |
Renfaze publishes a 3.9/5 aggregate for the named project, but does not state the review count; under the scoring rules it cannot establish an anchor. The five visible written reviews are mostly positive on amenities, convenience, security and maintenance, but one reports serious finish/material-quality problems, so the evidence-supported resident score is kept at 6.5 rather than pushed higher. | Not found in sources: No leaks reported by one reviewer | Not found in sources: No verified tenant reviews on Lived | |
The visible reviews contain mixed, building-specific infrastructure feedback: one reviewer reported “zero leaks or damage” after a major storm and uninterrupted electricity and internet, while another alleged “very poor building materials,” buildings “falling apart inside and outside,” and low-cost fittings and paint. These are individual reports rather than a repeated structural pattern, so no STRUCTURE rating or structural score is assigned. | The day-to-day picture is mostly favourable in the five visible reviews: residents mention “security 24,” basement parking, an on-site supermarket, “Maintenance team is available 24hr,” and pool, kids-area and gym facilities. The main negative is a single detailed complaint about low-cost finishes and alleged deterioration; Lived showed “0 reviews” and “No reviews yet,” so current resident-management evidence remains limited. | ||
| The Pulse Residence PlazaDubai South Residential District, Dubai193 units | 6.9/ 10 | —/ 10 | 6.9/ 10 |
The largest building-specific review set is Google’s B9 listing at 4.1/5 from 9 resident reviews. Because it has fewer than 10 reviews, the result is kept within one point of 6.5; the converted anchor is 7.3, then recurring management complaints and the sewage-odour report pull it down, while repeated quiet-community praise provides a small offset. Structure is left unscored because no structure-specific aggregate rating was published. | Not found in sources: No other physical defects reported · No published engineering assessment · No published plumbing resolution | ||
The available physical-condition feedback is limited and not an engineering inspection. One B8 reviewer reported “constant leaks on parking floor” but said they had otherwise seen no issues; a B9 reviewer reported a “very toxic” night-time sewage smell and said management took no action despite complaints. A DLD-derived project record describes the buildings as concrete-structure residential buildings and records completion on 15 March 2021, but that is project-record evidence rather than a condition score. | Day-to-day feedback is sharply mixed. Property Finder residents describe the place as “very quiet and peaceful” and “Quite and peacefully place to live,” while Google reviews report “the worst management,” unresolved complaints and a night-time sewage smell; the FazWaz review says, “I can’t imagine living in another location” and that necessities were within walking distance. | ||
| The Pulse Boulevard Apartments C1Dubai South Residential District, Dubai147 units | 6.1/ 10 | 5.5/ 10 | 5.9/ 10 |
The 3.7/5 building aggregate from 26 resident reviews sets the level and converts to 6.1/10 under the requested curve. Repeated complaints about AC, maintenance and construction quality pull the score down, while repeated praise for space, quietness and access/security partly offsets them; the resulting evidence-based resident score is 5.9/10. | |||
Published resident feedback raises repeated system and fabric concerns: one reviewer says the AC was confirmed by the maintenance company to be “poorly made,” while another reports “cheap materials” and mold. A separate February 2026 review alleges the swimming pool was leaking across the parking and lobby; these are resident reports, not an independent engineering inspection, and no current remediation evidence was located. | Day-to-day feedback is mixed but leans negative: residents praise the “very spacious” apartments, quiet setting and security staff, while complaints describe “unresponsive maintenance,” poor customer service and recurring AC problems. Another review reports no bus or metro access and only one supermarket, so the lifestyle is more car-dependent than the positive location comments suggest. | ||
| The Pulse Residence ParkDubai South Residential District, Dubai190 units | 5.4/ 10 | 4.7/ 10 | 4.7/ 10 |
The B4 Google aggregate is the largest qualifying review base and sets the level at 3.4/5, converted to 5.2/10. Repeated leaks and slow maintenance, together with serious reported flooding/fire-alarm issues, pull the score down, while repeated praise for quiet surroundings and modern facilities provides a limited offset. Evidence is still review-sparse and largely from 2021–2025, so it should not be read as a fully current engineering or management audit as of 2026-10-07. | |||
Physical-condition feedback is materially mixed and includes repeated water problems: one reviewer reported “Lots of leaks,” while another said kitchen leaks had occurred three times and were still unresolved. A separate B4 review reported that the parking entrance “gets flooded every month due to water leakage,” alongside a daily fire-alarm complaint and a gym air-conditioning failure; these are reviewer reports, not independently verified engineering findings. | Day-to-day feedback praises the quiet community and facilities—one review calls it “Very modern and clean,” and another describes a “Quiet neighbourhood adjoining E611.” Operations are less consistent: reviewers report maintenance taking too long, unresolved damage, sewage odour, and a pool shower that had not worked “since months”; Property Finder itself shows no building review aggregate, so its resident comments are not used as a scored rating. |
Dubai South and Majid Al Futtaim signed an agreement to develop a landmark AED 62 billion mixed-use master community within Dubai South, comprising retail, entertainment, hospitality and residential experiences.
Dubai South and Aldar entered a joint venture to develop Grade A logistics facilities, including build-to-lease and build-to-suit assets for logistics, e-commerce and retail tenants.
Dubai South Properties appointed the company under an AED 2 billion contract to develop several phases of HAYAT.
Dubai South Properties appointed the company to build South Bay phases 3, 4 and 5 under an AED 1.5 billion contract.
Dubai South Properties previously appointed GINCO to construct South Bay’s first two phases and infrastructure facilities.
Dubai South signed an agreement with BT Holding LLC for a gated master community in Dubai South’s Golf District.
A build-to-suit facility for Kuehne+Nagel is being developed at EZDubai as part of the Dubai South–Aldar logistics joint venture.
The official 2024 review states that GEMS Founders School opened in Dubai South and welcomed over 500 students.
Dubai South ... has signed an agreement with Majid Al Futtaim ... to develop a landmark AED 62 billion mixed-use master community within Dubai South
to develop a landmark AED 62 billion mixed-use master community within Dubai South
Dubai South ... and Aldar Properties ... have entered into a joint venture to develop Grade A logistics facilities in Dubai South’s Logistics District
have entered into a joint venture to develop Grade A logistics facilities in Dubai South’s Logistics District
Dubai South Properties ... announced the appointment of Mohammed Abdulmohsin Al Kharafi & Sons LLC for an AED 2 billion contract to develop several phases of HAYAT by Dubai South
announced the appointment of Mohammed Abdulmohsin Al Kharafi & Sons LLC for an AED 2 billion contract to develop several phases of HAYAT by Dubai South
The company also announced the appointment of Al Kharafi Construction Company to build phases 3,4 and 5 of the project in a AED 1.5 billion contract
appointment of Al Kharafi Construction Company to build phases 3,4 and 5 of the project
Last year, Dubai South Properties appointed GINCO General Contracting LLC to construct the project’s first two phases and the infrastructure facilities for the project
Dubai South Properties appointed GINCO General Contracting LLC to construct the project’s first two phases and the infrastructure facilities for the project
Dubai South ... announced the signing of an agreement with BT Holding LLC ... The agreement entails the development of a gated-master community within Dubai South’s Golf District
The agreement entails the development of a gated-master community within Dubai South’s Golf District
will develop a build to suit facility for Kuehne+Nagel ... at EZDubai
will develop a build to suit facility for Kuehne+Nagel, ... at EZDubai
GEMS Founders School officially opened its doors last year, welcoming over 500 students
GEMS Founders School officially opened its doors last year, welcoming over 500 students
| DEVELOPER LICENCE | 1142 Dubai Land Department · AE |
| United Arab Emirates | active 10 projects tracked |
| Residential, for sale | 10 of 10 |
We are working to become the manifestation of Dubai Vision 2021, to establish a city of happy, empowered, and creative people.The Business Year July 13, 2016https://thebusinessyear.com/interview/built-around-happiness/
Zaffin is a graduate of Arizona State University and holds a bachelor’s degree in chemical engineering.
H.E. Khalifa Al Zaffin, Executive Chairman of Dubai Aviation City Corporation and Dubai South
In addition to his role at DACC, he is also the Executive Chairman of Dubai Aviation Engineering Projects
Currently, he serves as a board member of the Executive Council for Infrastructure Affairs, Dubai World Trade Center, Cleveland Bridge, and Deyaar.
Currently, he serves as a board member of the Executive Council for Infrastructure Affairs, Dubai World Trade Center, Cleveland Bridge, and Deyaar.
Currently, he serves as a board member of the Executive Council for Infrastructure Affairs, Dubai World Trade Center, Cleveland Bridge, and Deyaar.
Prior to his two decades of experience in aviation, Zaffin was Senior Project Engineer at Dubai Aluminum Company Ltd. (DUBAL).
Published July 13, 2016
We are working to become the manifestation of Dubai Vision 2021, to establish a city of happy, empowered, and creative people.
HE Khalifa Zaffin is the Executive Chairman at Dubai Aviation City Corporation, the parent organization of Dubai South. Zaffin is a graduate of Arizona State University and holds a bachelor’s degree in chemical engineering. ... Prior to his two decades of experience in aviation, Zaffin was Senior Project Engineer at Dubai Aluminum Company Ltd. (DUBAL).
HE Khalifa Zaffin is the Executive Chairman at Dubai Aviation City Corporation, the parent organization of Dubai South.
HE Khalifa Zaffin is the Executive Chairman at Dubai Aviation City Corporation, the parent organization of Dubai South.
Prior to his two decades of experience in aviation, Zaffin was Senior Project Engineer at Dubai Aluminum Company Ltd. (DUBAL).
Prior to his two decades of experience in aviation, Zaffin was Senior Project Engineer at Dubai Aluminum Company Ltd. (DUBAL).
Zaffin is a graduate of Arizona State University and holds a bachelor’s degree in chemical engineering.
H.E. Khalifa Al Zaffin, Executive Chairman of Dubai Aviation City Corporation and Dubai South
We are pleased to see the progress of construction as per our set timelines.Dubai South https://www.dubaisouth.ae/en/newsroom/dubai-south-properties-completes-90percent-of-the-pulse-beachfront-plans-future-projects
Real estate investments constitute 70 per cent of the overall investments at Dubai South, and we take pride in launching strategic and well-studied projects that cater to the needs and preferences of investors and end users.Gulf Business July 30, 2024https://mot-backup.gulfbusiness.com/interview-with-dubai-south-prop-ceo-nabil-alkindi/
Dubai South Properties’ Nabil Al Kindi on supporting the emirate’s grand vision
He also serves as CEO of Duserve Facilities Management and South Energy.
He also serves as CEO of Duserve Facilities Management and South Energy.
Al Kindi previously held leadership roles at DIFC, Arabtec Holding, TDIC, and Zabeel Investments.
Al Kindi previously held leadership roles at DIFC, Arabtec Holding, TDIC, and Zabeel Investments.
Al Kindi previously held leadership roles at DIFC, Arabtec Holding, TDIC, and Zabeel Investments.
Al Kindi previously held leadership roles at DIFC, Arabtec Holding, TDIC, and Zabeel Investments.
We are pleased to see the progress of construction as per our set timelines.
Real estate investments constitute 70 per cent of the overall investments at Dubai South, and we take pride in launching strategic and well-studied projects that cater to the needs and preferences of investors and end users.
Al Kindi assumed his current role in 2019.
Al Kindi assumed his current role in 2019. ... Al Kindi previously held leadership roles at DIFC, Arabtec Holding, TDIC, and Zabeel Investments. He also serves as CEO of Duserve Facilities Management and South Energy.
In his comments, Nabil Al Kindi, Group CEO of Dubai South, said:
Al Kindi assumed his current role in 2019.
Al Kindi previously held leadership roles at DIFC, Arabtec Holding, TDIC, and Zabeel Investments.
Al Kindi previously held leadership roles at DIFC, Arabtec Holding, TDIC, and Zabeel Investments.
Al Kindi previously held leadership roles at DIFC, Arabtec Holding, TDIC, and Zabeel Investments.
Al Kindi previously held leadership roles at DIFC, Arabtec Holding, TDIC, and Zabeel Investments.
The CEO of Dubai South Properties says the developer is on track to complete and deliver approximately 2,500 units by 2025
Murray State University, Master of Science (M.S.), January 2010 to January 2012
University of Dubai, Bachelor's degree, January 2004 to January 2008
# Abdulbaset AlMarzooqi
Deputy Chief Executive Officer atDubai Southin September 2024 to Present
Sep 2024 - Present (2 years)
#### Deputy Chief Executive Officer (Current) Sep 2024 - Present (2 years) ... Total Experience: 19 years and 6 months
#### Deputy Chief Executive Officer (Current)
Total Experience: 19 years and 6 months
#### Director logistics operations Development
### Master of Science (M.S.) Management of Technology at Murray State University
#### Deputy Chief Executive Officer (Current)
Our goal is to empower young Emiratis with future-oriented skills in critical fields such as aviation, supply chain management, safety and quality, and digital transformation, accelerating their transition from training to impactful professional roles.Dubai South November 20, 2025https://www.dubaisouth.ae/en/newsroom/dubai-south-signs-mou-with-emirati-human-resources-development-council-in-dubai-to-enhance-emiratisation-across-strategic-sectors
### Bacholer Business Siences - Human Resources Managment at Zayed University
# Hafsa Algargawi
### Board Member - [duservefm] (Current)
20 November 2025
Our goal is to empower young Emiratis with future-oriented skills in critical fields such as aviation, supply chain management, safety and quality, and digital transformation, accelerating their transition from training to impactful professional roles.
Jun 2020 - Present (5 years and 4 months)
### Board Member - Dubai South Properties (Current) ... Chief People Management Officer - [Dubai South] (Current) ... Currently leading human capital transformation at Dubai South with a focus on innovation, governance, and long-term sustainability.
### Board Member - Dubai South Properties (Current)
Hafsa Algargawi, Chief People Management Officer at Dubai South
Currently leading human capital transformation at Dubai South with a focus on innovation, governance, and long-term sustainability.
### Bacholer Business Siences - Human Resources Managment at Zayed University
### Board Member - Dubai South Properties (Current) ... ### Chief People Management Officer - [Dubai South] (Current)
### B.S. Architectural Studies at University of Illinois Chicago
### Master’s Degree MBA - Project Management at London School of Business and Finance LSBF
# Andrew Freese
### Assistant Vice President - Projects - [DIFC]
### Portfolio Lead - Head of Projects - [Meraas]
### Senior Owner's Representative - Museums - [TDIC]
### Senior Project Manager - [Lendlease]
Jul 2025 - Present (1 year and 2 months)
20+ years’ experience in project construction management, property development and architecture in both mature and emerging markets. ... ### Director - Design & Development (Current)
#### Director - Design & Development (Current)
20+ years’ experience in project construction management, property development and architecture
### Assistant Vice President - Projects - [DIFC]
### Portfolio Lead - Head of Projects - [Meraas]
### Senior Owner's Representative - Museums - [TDIC]
### Master’s Degree MBA - Project Management at London School of Business and Finance LSBF
#### Director - Design & Development (Current)
# Ahmed Zayed
### Senior Director-Head the Projects Development & Construction DarGlobal-Dar Al Arkan Properties
### Director - Projects Development & Construction - [Dar Al Arkan]
### Senior Manager Projects Development & Construction - [Emaar]
### Senior Manager Projects Development & Construction - [DAMAC Properties]
Feb 2024 - Present (1 year and 9 months)
With over 27 years of experience in project’s management, Development and construction, real estate, and business development. ... #### Head Of The Projects Development & Construction, Dubai South Properties (Current) ... Senior Director-Head the Projects Development & Construction DarGlobal-Dar Al Arkan Properties ... Director - Projects Development & Construction - Dar Al Arkan ... Senior Manager Projects Development & Construction - Emaar ... Senior Manager Projects Development & Construction - DAMAC Properties
#### Head Of The Projects Development & Construction, Dubai South Properties (Current)
#### Director Of The Projects and Delivery Department (Current)
Total Experience: 28 years and 1 month
### Senior Director-Head the Projects Development & Construction DarGlobal-Dar Al Arkan Properties
### Senior Manager Projects Development & Construction - [Emaar]
### Senior Manager Projects Development & Construction - [DAMAC Properties]
#### Director Of The Projects and Delivery Department (Current) ... #### Head Of The Projects Development & Construction, Dubai South Properties (Current)
0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| The Pulse Beachfront 3 | Dubai, United Arab Emirates Residential District | residential for sale | — | — | — | AED 364.1m estimated cost | 5/45/501 | 2021 | November 27, 2021 | Apr 2025 – Jun 2025 | Apr 2025 | −1.0 mo (−2.0 to 0.0) | sourced | completed |
| The Pulse Beachfront 2 | Dubai, United Arab Emirates Residential District | residential for sale | 1981 | G+1 | 70,251 m² | — | 50\501 | 2021 | November 27, 2021 | Jan 2024 – Dec 2024 | Dec 2024 | +5.5 mo (0.0 to +11.0) | sourced | completed |
| The Pulse Beachfront — Phase 1 | Dubai, United Arab Emirates Residential District | residential for sale | 2511 | — | — | — | 5% down payment; 50% during construction; 50% over two years post-completion1 | 2021 | November 27, 2021 | Jan 2024 – Dec 2024 | Dec 2024 | +5.5 mo (0.0 to +11.0) | estimated | completed |
| The Pulse Villas — Phase 2 | Dubai, United Arab Emirates Dubai South Residential District | residential for sale | — | 2 | — | AED 64m estimated cost | 5/45/501 | 2022 | January 31, 2022 | Jan 2024 | Jan 2024 | 0.0 mo (0.0 to 0.0) | sourced | completed |
| The Pulse Villas — Phase 1 | Dubai, United Arab Emirates Dubai South Residential District | residential for sale | 2681 | G+1 | — | — | 5% / 45% / 20% / 30%1 | 2021 | 24 February 2021 | Jan 2023 – Dec 2023 | Jun 2023 | −0.5 mo (−6.0 to +5.0) | sourced | completed |
| The Pulse Residence Plaza | Dubai, United Arab Emirates Dubai South Residential District | residential for sale | 1931 | B+G+11 | — | — | 10/40/501 | 2016 | 15/11/2016 | Apr 2020 | Mar 2021 | +11.0 mo (+11.0 to +11.0) | sourced | completed |
| The Pulse Boulevard Apartments C1 | Dubai, United Arab Emirates Dubai South Residential District | residential for sale | 1471 | B+G+11 | — | — | 5/45/501 | 2016 | 2016 | Jan 2020 – Dec 2020 | Jan 2021 | +6.5 mo (+1.0 to +12.0) | sourced | completed |
| The Pulse Boulevard Apartments C3 | Dubai, United Arab Emirates Dubai South Residential District | residential for sale | 1571 | 11 floors | — | AED 84m estimated cost | 10/40/501 | — | — | Mar 2020 | Mar 2020 | 0.0 mo (0.0 to 0.0) | sourced | completed |
| The Pulse Residence Park | Dubai, United Arab Emirates Dubai South Residential District | residential for sale | 1901 | (B+G+10)X 2 residential buildings and town houses | — | — | 5/45/501 | 2016 | 14 November 2016 | Mar 2020 | Mar 2020 | 0.0 mo (0.0 to 0.0) | sourced | completed |
| The Pulse Boulevard Grove | Dubai, United Arab Emirates Dubai South Residential District | residential for sale | 1081 | 13 storeys | — | AED 150.3m estimated cost | 5% / 45% / 50%1 | 2017 | July 2017 | Sep 2019 | Sep 2019 | 0.0 mo (0.0 to 0.0) | sourced | completed |
| Coverage | active |
| Tracked since | October 6, 2026 |
| Last checked | October 7, 2026 this month |
| Profile last researched | October 7, 2026 |
| Claim |