Eagle Hills Bahrain develops master-planned waterfront communities in Bahrain, combining residential apartments, serviced residences, hotels, retail, dining, entertainment, public spaces, and beaches. Its model serves homebuyers, residents, visitors, retailers, hospitality guests, and investors through off-plan sales and mixed-use development projects.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| Marassi Shores ResidencesMarassi Al Bahrain, Diyar Al Muharraq289 units | 9.7/ 10 | —/ 10 | 9.7/ 10 |
Airbnb supplies the largest applicable review base found for this building, with a published 4.89/5 from 64 guest reviews; converted on the stated 1–10 curve, that sets a 9.7 anchor. The other Airbnb aggregates are directionally consistent, while no recurring complaint or structural review evidence was found to move the result. | |||
no notes returned no links returned | The available short-stay evidence is strongly positive: Airbnb listings in Marassi Shores show 4.52/5 to 4.89/5, including 4.76/5 from 59 reviews and 4.89/5 from 64 reviews. The listings describe beach access, pools, a gym, children’s play areas and 24-hour security, but no individual review text or recurring operational complaint was available for this building. | ||
| Address Beach Resort BahrainMarassi Al Bahrain117 units | 9.4/ 10 | 8.9/ 10 Tripadvisor 4.9/5 · 937 reviews · tripadvisor.ie Tripadvisor publishes 4.9/5 from 937 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 8.9. | 8.8/ 10 Tripadvisor 4.9/5, 4.8/5, 4.9/5 · 937 reviews · tripadvisor.ie Combined from 3 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 8.8. |
Google’s building-level aggregate of 4.8/5 from 2,829 guest reviews is the largest review base and converts to 9.4/10 under the specified curve. Tripadvisor’s 4.9/5 from 937 reviews and Hotwire’s 9.4/10 from 54 reviews broadly corroborate that level; recurring praise and limited moderate/minor criticism do not justify a material change. Structure is left unscored because the published evidence contains observations about condition but no independent structural rating. | |||
Published guest feedback describes the property as new, clean and well maintained; one Hotwire review specifically called the “facilities new and well maintained,” while another praised the quality of the furnishings as “immaculate.” No reviewed source located here reports flooding, leaks, lift failures, plumbing problems, HVAC faults or other serious building-system failures. | Daily-life feedback is strongly positive: guests repeatedly praise “super nice staff,” clean rooms, the beach and pool, and the children’s club, with Tripadvisor describing staff as “very accommodating.” The main operational reservations are occasional delays—one review says requests took “a long time” to fulfil—and value and dining choice concerns; Google’s review themes also show substantial discussion of service, property, cleanliness and amenities. | ||
| Marassi GalleriaMarassi Al Bahrain, Diyar Al Muharraq450 units | 9.2/ 10 | —/ 10 | 9.2/ 10 |
The largest review base is the 4.7/5 Google Reviews/Maps aggregate, which converts to approximately 9.1/10 and sets the level. Positive themes around cleanliness, design, family amenities and parking support an upward adjustment, while one serious operational complaint about dress-code enforcement warrants a limited downward offset; no physical-structure evidence supports a structure score. | |||
no notes returned no links returned | Published reviews repeatedly describe Marassi Galleria as “modern, clean, well-organized,” with an “amazing” atmosphere, family activities and organized parking. A separate reviewer reported that a security guard refused entry over clothing and said the experience was “humiliating and embarrassing”; aggregated commentary also notes some unopened stores, limited restaurant variety and no information desk. | ||
| Marassi ParkDiyar Al Muharraq249 units | 9.1/ 10 | —/ 10 | 9.1/ 10 |
The largest applicable published review set located is the building-specific Google Maps aggregate of 4.7/5 from 33 reviews, which converts to approximately 9.1/10 on the stated curve. No recurring complaint or praise theme was established from individually read reviews, and no physical-condition evidence was published in the material reviewed; the completion announcement is dated September 13, 2023, while the rating page is marked updated October 2026. | |||
no notes returned no links returned | The published project material describes an adult pool, children’s pool and play area, gym, and communal outdoor gardens with barbecue and seating areas. No individual resident comments about management speed, staff attitude, security, cleanliness, or upkeep were available in the reviewed material, so those day-to-day aspects remain uncertain. | ||
| Marassi ResidencesMarassi Al Bahrain, Diyar Al Muharraq250 units | 8.1/ 10 | —/ 10 | 7.9/ 10 |
Google Reviews/Maps provides the largest and only clearly published building-specific aggregate located here: 4.5/5 from 205 reviews, which converts to 8.5 under the specified curve. The sampled written material is broadly positive about the modern building and amenities, but operational complaints about beach access, drilling/noise, customer-service response and wayfinding support a downward adjustment to 7.9. No building-fabric or systems rating was published in the material reviewed, so structure remains unevidenced rather than marked down. | |||
no notes returned no links returned | The sampled Google material praises the property as modern, with an “impressive and well designed” lobby, and mentions its pool, gym, reception and car parks. Operational criticism is also present: one resident said beach-bed rules were not enforced, another reported “VERY LOUD DRILLING” for more than seven months and said customer service did not respond, and another found the route to the residences “like a maze.” | ||
| Vida Beach Resort Marassi Al BahrainMarassi Al Bahrain157 units | 8.0/ 10 | —/ 10 | 7.9/ 10 Booking.com 9/10, 9/10, 9/10, 9.1/10, 7.7/10, 8.9/10, 8.5/10 · 4,220 reviews · booking.com Tripadvisor 4.7/5, 4.7/5, 4.5/5, 4.8/5 · 1,577 reviews · tripadvisor.com Combined from 11 published figures on 2 platforms, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.9. |
Booking.com provides the largest review base and sets the level: its published 8.7/10 converts to 7.4 under the specified guest-rating curve. Tripadvisor is materially more favorable, while the written commentary supplies substantial praise but also reports noise, service-speed, housekeeping and one shower-flooding issue; after a proportionate disagreement adjustment and commentary movement, the resident-experience score is 7.8/10. Structural scoring remains null because the evidence is hospitality feedback rather than a building-engineering assessment. | |||
The available infrastructure-related feedback is mostly favorable: the independent review describes modern bathrooms that are “usually spotless” and says grout and drains are well-maintained. However, it also reports slow AC repairs and balcony-furniture wear, while a Booking.com guest wrote, “It’s so hard to take shower without flooding the sink floor”; no engineering report or broader structural failure pattern was found. | Guests consistently praised the staff and setting: Booking.com reviews call the staff “kind and professional,” and Tripadvisor guests described the beach as “clean and big” with helpful staff. The main operational reservations are slower check-in/valet, construction and weekend noise, and occasional housekeeping shortcomings; the independent review says valet is free but slow and that construction can affect sea views. | ||
| Marassi BoulevardMarassi Al Bahrain, Diyar Al Muharraq243 units | 7.5/ 10 | —/ 10 | 7.5/ 10 |
The only building-specific published review rating located is Google 4.4/5, reported by a current property directory without a stated review count, so its curve-equivalent is approximately 8.2 but the limited-review rule constrains the result to within one point of 6.5. The resulting resident-experience score is 7.5; structure remains unevidenced because no structural review rating or defect reports were found. | |||
The available building-specific material describes four residential buildings completed and handed over in 2020, with central air conditioning, swimming pools, gym facilities and covered/basement parking. No building-specific resident review reporting leaks, plumbing, HVAC failures, electrical problems or other structural defects was located; the 4.4/5 Google figure is published without a review count and does not provide a structural sub-score. | Published building material consistently highlights access to Marassi Beach, the promenade and Marassi Galleria, together with a gym, adult and children’s pools and play areas. A current property directory publishes “Rated 4.4 on Google,” but gives no review count or written feedback, so there is insufficient resident commentary to establish recurring management or staff problems as of 2026-10-13. |
Headquartered in Bahrain, with offices in Al-Muharrak, Diyar Al Muharraq, Manama, and Marassi Beach.
The parties established Binaa Al Bahrain through a joint-venture agreement to develop mixed-use projects across Bahrain.
Marassi Al Bahrain is described as an Eagle Hills project formed under a joint-venture agreement with Diyar Al Muharraq.
Appointed as a joint-venture contractor for construction of Marassi Galleria Mall, VIDA Hotel and Serviced Apartments.
Appointed as a joint-venture contractor for construction of Marassi Galleria Mall, VIDA Hotel and Serviced Apartments.
Appointed contractor responsible for construction of Address Marassi Al Bahrain.
Awarded construction contracts for Marassi Bay and Marassi Terraces.
Signed an MoU to extend Sharia-compliant residential mortgage financing for three Marassi Al Bahrain projects.
Eagle Hills International's newly set up real estate joint venture - Binaa Al Bahrain - will focus on creating expansive mixed-use projects across the kingdom.
Marassi Al Bahrain is a distinguished urban project by Eagle Hills, a private real estate investment and development company, headquartered in Abu Dhabi, as part of a joint venture agreement with Diyar Al Muharraq, the developer of mega-project Diyar Al Muharraq.
Eagle Hills Diyar, the pioneers behind the distinguished Marassi Al Bahrain development, appointed Joint Venture contractors “Shapoorji Pallonji Mideast LLC” and “Cebarco Bahrain SPC” for the construction of Marassi Galleria Mall, VIDA Hotel and Serviced Apartments.
Eagle Hills Diyar, the pioneers behind the distinguished Marassi Al Bahrain development, appointed Joint Venture contractors “Shapoorji Pallonji Mideast LLC” and “Cebarco Bahrain SPC” for the construction of Marassi Galleria Mall, VIDA Hotel and Serviced Apartments.
Dadabhai Construction had been appointed as the contractor responsible for the construction of Address Marassi Al Bahrain.
Eagle Hills Diyar (EHD), a pioneering developer that is behind the Marassi Al Bahrain project, has awarded the construction contract for the building and development of the Marassi Bay and Marassi Terraces to leading Bahraini construction company, Kooheji Contractors.
The memorandum ... is set to extend Islamic Sharia compliant residential real estate mortgage financing facilities for three of Marassi Al Bahrain projects: Marassi Residences, Marassi Shores Residences and Marassi Boulevard.
| COMPANY NUMBER | 94355 Ministry of Labor, Kingdom of Bahrain · Bahrain · Current employer listing observed for 2025 |
| Bahrain | active 8 projects tracked |
| Residential, for sale | 4 of 8 |
| Hotel | 2 of 8 |
| Retail | 1 of 8 |
| Mixed use | 1 of 8 |
If you mix this right – with entertainment, residential, tourism and hospitality and shopping, you should look at 2-2.5 per cent addition by the time it’s moved to almost 60 per cent completion2016-01-14 2016-01-14https://www.thenationalnews.com/business/property/eagle-hills-project-could-boost-bahrain-gdp-by-4-1.187065
A finance and business administration graduate from Seattle University in the US
A finance and business administration graduate from Seattle University in the US
Mohamed Al Abbar, Chairman of Binaa Al Bahrain, expressed his pride in the opening of the sales center
If you mix this right – with entertainment, residential, tourism and hospitality and shopping, you should look at 2-2.5 per cent addition by the time it’s moved to almost 60 per cent completion
If you mix this right – with entertainment, residential, tourism and hospitality and shopping, you should look at 2-2.5 per cent addition by the time it’s moved to almost 60 per cent completion
If you mix this right – with entertainment, residential, tourism and hospitality and shopping, you should look at 2-2.5 per cent addition by the time it’s moved to almost 60 per cent completion
If you mix this right – with entertainment, residential, tourism and hospitality and shopping, you should look at 2-2.5 per cent addition by the time it’s moved to almost 60 per cent completion
Chairman of Binaa Al Bahrain
He is the Founder and Managing Director of Emaar Properties — developer of the world’s tallest building and is Chairman of Eagle Hills — a leading emerging markets real estate developer. He has spearheaded the growth of Emaar Properties, attaining an unmatched track record of successfully developing iconic futuristic residential, retail, entertainment, hospitality, and leisure assets, transforming people’s lifestyles globally.
He is the Founder and Managing Director of Emaar Properties ... and is Chairman of Eagle Hills ... Over the years, he has developed world-class, mixed-use projects ... across 20+ markets
Mohamed Al Abbar, Chairman of Binaa Al Bahrain, expressed his pride in the opening of the sales center
This project represents yet another milestone in shaping Bahrain’s future as a destination of choice for residents, investors, and visitors.2025-09-22 2025-09-22https://binaaeaglehills.com/binaa-al-bahrain-unveils-marassi-views-a-new-benchmark-for-seaside-elegance-in-the-kingdom/
Maher Abdulaziz Yousif Al Shaer
“This project represents yet another milestone in shaping Bahrain’s future as a destination of choice for residents, investors, and visitors.”
“This project represents yet another milestone in shaping Bahrain’s future as a destination of choice for residents, investors, and visitors.”
“This project represents yet another milestone in shaping Bahrain’s future as a destination of choice for residents, investors, and visitors.”
“This project represents yet another milestone in shaping Bahrain’s future as a destination of choice for residents, investors, and visitors.”
Managing Director of Binaa Al Bahrain
Dr. Maher Al Shaer, Managing Director of Binaa Al Bahrain, stated that the opening of the sales center represents a pivotal moment in the trajectory of real estate investment in the Kingdom of Bahrain.
Dr. Maher Al Shaer, Managing Director of Binaa Al Bahrain, stated that the opening of the sales center represents a pivotal moment
These two highly anticipated developments will soon be a key part of Marassi Al Bahrain’s iconic skyline2023-09-25 2023-09-25https://www.zawya.com/en/business/real-estate/bahrain-eagle-hills-diyar-awards-two-key-marassi-projects-to-kooheji-contractors-or2xtcrx
Hayssam Youssef
https://linkedin.com/in/hayssam-youssef-a195b472
Previous roles include General Manager at Eagle Hills Bahrain and Engineering Manager at Nestlé S.A.
These two highly anticipated developments will soon be a key part of Marassi Al Bahrain’s iconic skyline
These two highly anticipated developments will soon be a key part of Marassi Al Bahrain’s iconic skyline
These two highly anticipated developments will soon be a key part of Marassi Al Bahrain’s iconic skyline
These two highly anticipated developments will soon be a key part of Marassi Al Bahrain’s iconic skyline
Chief Officer - Development & Projects Delivery
Chief Officer - Development & Projects Delivery - Binaa Al Bahrain (Current) May 2025 - Present
Previous roles include General Manager at Eagle Hills Bahrain and Engineering Manager at Nestlé S.A.
Chief Officer - Development & Projects Delivery - Binaa Al Bahrain (Current)
ACA, Finance at Institute of Chartered Accountants of Pakistan
ACA, Finance at Institute of Chartered Accountants of Pakistan
Farooq Bashir, FCA
https://linkedin.com/in/farooq-bashir-fca-54641516
Chief Financial Officer & Acting Chief Operating Officer - Arzul Musheer (Private) Limited
Chief Financial Officer - Binaa Al Bahrain
Chief Financial Officer - Binaa Al Bahrain (Current) Dec 2024 - Present
Chartered Accountant and finance executive with 20 years across real estate development
Farooq Bashir, FCA CFO | Real Estate Development & Mixed-Use | Board Reporting, Audit & Risk Committee | Project Finance & Refinancing | FCA
Chief Financial Officer - Binaa Al Bahrain (Current)
We see our real estate brokers as essential partners in connecting our development vision with our clients.2026-09-09 2026-09-09https://www.newsofbahrain.com/bahrain/140815.html
Eng. Tarik Nour, General Manager of Binaa Al Bahrain
We see our real estate brokers as essential partners in connecting our development vision with our clients.
We see our real estate brokers as essential partners in connecting our development vision with our clients.
We see our real estate brokers as essential partners in connecting our development vision with our clients.
We see our real estate brokers as essential partners in connecting our development vision with our clients.
General Manager of Binaa Al Bahrain
We see our real estate brokers as essential partners in connecting our development vision with our clients. Their role is integral to our continued success
Eng. Tarik Nour, General Manager of Binaa Al Bahrain, said
MSc (Real Estate) with 20 years experience.
University of East London
Abdulla Al Jowder
https://linkedin.com/in/abdulla-al-jowder-b3a06182
Senior Director Asset management & Operations - Binaa Powered by Eagle Hills
Leading Operations, Asset Management, Facility Management, Customer Service, Government Relations, and Community Management across all Binaa Al Bahrain, powered by Eagle Hills, master plans and developments in Bahrain, including Marassi Al Bahrain.
MSc (Real Estate) with 20 years experience. • Malls management, operations, Leasing, tenants relations and Customer satisfaction.
Mall GM, Senior Director Asset management & Operations - Binaa Powered by Eagle Hills (Current)
0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Marassi Terraces | Bahrain Diyar Al Muharraq | residential for sale | 3501 | 10 storeys | — | — | 25% Downpayment; 25% 2 months post downpayment; 6.25% per year; 2 years Payment plan post handover for terraces 21 | 2022 | June 22, 2022 | — | Aug 2026 | — | not scorable | completed |
| Marassi Galleria | Diyar Al Muharraq, Bahrain Marassi Al Bahrain | retail | 4501 | — | — | — | — | 2018 | November 27, 2018 | Jan 2019 – Dec 2019 | Feb 2024 | +55.5 mo (+50.0 to +61.0) | sourced | completed |
| Marassi Park | Bahrain Diyar Al Muharraq | residential for sale | 2491 | 6 to 10 stories | — | — | — | 2021 | February 21, 2021 | Sep 2023 | Sep 2023 | 0.0 mo (0.0 to 0.0) | estimated | completed |
| Address Beach Resort Bahrain | Bahrain Marassi Al Bahrain | hotel | 1171 | 10 storey | — | — | 50% Now and 50% within 2 years1 | 2017 | April 2017 | — | Nov 2022 | — | not scorable | completed |
| Vida Beach Resort Marassi Al Bahrain | Bahrain Marassi Al Bahrain | hotel | 1571 | — | — | — | — | 2018 | November 27, 2018 | — | Dec 2021 | — | not scorable | completed |
| Marassi Boulevard | Bahrain Marassi Al Bahrain, Diyar Al Muharraq | mixed use | 2431 | — | — | — | — | 2017 | February 4, 2017 | Jan 2020 – Mar 2020 | Jul 2020 | +5.0 mo (+4.0 to +6.0) | estimated | completed |
| Marassi Shores Residences | Bahrain Marassi Al Bahrain, Diyar Al Muharraq | residential for sale | 2891 | 9 floors; conflicting source states 11-storey | — | — | Installments are 15% of the total value of the unit except for the last installment which will be 25% to be paid upon handover.1 | 2016 | May 28, 2016 | May 2019 – Aug 2019 | Oct 2019 | +3.5 mo (+2.0 to +5.0) | estimated | completed |
| Marassi Residences | Bahrain Marassi Al Bahrain, Diyar Al Muharraq | residential for sale | 2501 | — | — | — | 30% during construction;30% on handover;40% over 2 years1 | 2016 | January 16, 2016 | Jul 2018 – Sep 2018 | Feb 2019 | +6.0 mo (+5.0 to +7.0) | estimated | completed |
| Coverage | active |
| Tracked since | October 12, 2026 |
| Last checked | October 13, 2026 this month |
| Profile last researched | October 13, 2026 |
| Claim |