Eagle Hills develops mixed-use, master-planned waterfront communities, residences, hotels, retail, marinas, and urban destinations across Europe, Africa, the Middle East, and emerging markets, serving residents, investors, visitors, governments, and institutional partners.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| Marassi ParkMarassi Al Bahrain, Manama249 units | 9.1/ 10 | —/ 10 | 9.1/ 10 |
The largest applicable published review base found is the building-specific Google aggregate reproduced by Top-Rated.Online: 4.70/5 from 33 reviews, which sets the level and converts to 9.1/10 on the stated market-style curve. No recurring complaint or praise theme could be established because individual review texts were not available, and no physical-condition evidence was published in the pages read; the score therefore receives no commentary adjustment. | |||
no notes returned no links returned | The published Google aggregate is 4.70/5 from 33 reviews, but the page read did not expose individual review comments, so there is no raw resident feedback to quote about management, staff or upkeep. Independent project reporting describes residents’ access to an adult pool, children’s pool and play area, gym, communal gardens, barbecue/seating areas, and nearby Marassi Beach and Marassi Galleria; those are published amenity/location descriptions rather than resident-review findings. | ||
| Mandarin Oriental, Muscat (hotel)Shatti Al-Qurum, Muscat | 8.9/ 10 | —/ 10 | 8.6/ 10 Tripadvisor 4.8/5, 4.9/5, 5/5, 4.8/5, 4.6/5, 5/5 · 145 reviews · tripadvisor.com.sg Combined from 6 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 8.6. |
The largest published review base is Google Reviews/Maps at 4.6/5 from 823 reviews, which converts to 8.8/10 under the requested curve. Tripadvisor, momondo, Expedia and Telegraph are directionally consistent, while the written feedback is strongly positive about service, rooms, beachfront setting and dining; the limited operational criticisms do not justify a material reduction. | |||
no notes returned no links returned | Guest reviews repeatedly praise warm, attentive service: one says the team was “always attentive and available,” while another calls the staff “a real asset” and says requests were handled “promptly and efficiently.” The main cautions are occasional slow responses, limited breakfast or Omani-menu choices, and some music disturbance; these are commentary-level issues rather than reported building failures. | ||
| The Bristol BelgradeBelgrade Waterfront, Belgrade | 8.9/ 10 | 8.5/ 10 | 8.7/ 10 |
The largest published review base located was Google Reviews/Maps at 4.5/5 from 848 reviews, which converts to 8.5/10 under the specified curve. Booking.com is directionally consistent at 9.4/10 from 723 reviews, while the detailed reviews add strong praise for staff, service and restoration but identify one room-temperature/air-conditioning problem; the resulting overall score remains 8.5. | |||
Published reviews describe an extensively restored heritage building with “quality furnishings, finishes and materials,” bright rooms, “impeccable soundproofing,” heated bathroom flooring and modern spa facilities. The principal systems complaint found was a chilly room: one reviewer said the air conditioning should “function flawlessly”; this is a reported operational failure, not evidence of a broader structural defect. | The available guest-facing reviews portray a polished hospitality experience: staff were described as “professional, discreet and effective,” while another review called service “attentive, genuine, efficient and highly personalised.” The main negative was comfort-related rather than management-related: a reviewer found the room chilly and said the air-conditioning controls should work more intuitively. | ||
| Marassi GalleriaDiyar Al Muharraq | 8.8/ 10 | —/ 10 | 8.8/ 10 |
Mindtrip’s 4.7/5 aggregate from 3.9k reviews is the largest published review base and converts to approximately 9.1/10 under the supplied curve. The score is adjusted down modestly because the written evidence includes a serious single security/dress-code complaint and several minor operational criticisms, partly offset by repeated praise for cleanliness, atmosphere, activities, parking and staff. | |||
no notes returned no links returned | Visitors commonly describe Marassi Galleria as “clean and modern,” “elegant, clean, and fun,” with organized parking, family activities and a pleasant atmosphere. A July 2026 reviewer alleged that a security guard enforced a new dress policy in a way that left her “humiliated and embarrassed”; other published summaries also mention some unoccupied stores, limited restaurant variety and the mall’s distance from the city centre. | ||
| Rabat Square Phase II (ORA and OPAL)Domaine Dar Es Salam, Rabat | 8.5/ 10 | —/ 10 | 8.5/ 10 |
The ORA-specific Google aggregate reported by Wanderlog is 4.5/5 from exactly 10 reviews, making it eligible to set the anchor and converting to 8.5 under the requested curve. No second qualifying platform rating or recurring review theme was found to move that anchor; the 2022 delivery commitments are historical forecasts, not evidence of actual completion as of 2026-10-13. | |||
A project-forum commenter wrote that the developers were doing an “excellent job when it comes to project quality, good materials, and strong architectural design.” This is a single forum comment rather than a published engineering assessment, and no specific ORA/OPAL defect report was located in the material read. | The ORA page reports a 4.5/5 Google rating from 10 reviews and describes the complex as supporting a “peaceful and balanced family lifestyle.” Its listing also describes amenities, but no individual review text was exposed there, so there is no review-level evidence to substantiate particular staff, security, maintenance or upkeep themes. | ||
| The St. Regis Belgrade hotelBelgrade Waterfront, Belgrade | 8.1/ 10 | 8.0/ 10 | 7.7/ 10 Booking.com 8.3/10, 9.2/10, 9.2/10, 9.1/10, 9.9/10, 9.5/10, 9.1/10, 8.4/10 · 349 reviews · besthotel.net Combined from 8 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.7. |
The largest published review base is Booking.com’s 8.9/10 from 349 guest reviews, which sets a 7.8 converted anchor under the guest-rating curve. The score moves modestly upward for repeated praise of staff, dining and the setting; the evidence is hotel-guest evidence rather than a resident-year dataset, and no structural failure is reported. | |||
The written material describes a newly built, modern property with spacious rooms, expansive marble bathrooms and a “very modern well designed hotel”; one room review found the shower pressure “decent.” No published review evidence located here reports leaks, flooding, structural failure, HVAC, electrical or plumbing breakdowns, so no structural complaint is recorded. | Daily-service feedback is mostly favorable: reviewers describe “wonderful and friendly staff,” “friendly and attentive” service, and staff who “went above and beyond”; the hotel review also says the team is “young, energetic and highly motivated.” Counterpoints include “Odlicna hrana al je usluga jako spora,” a 20-minute limousine wait, and a separate stay review calling the pool “nothing special” and the room design somewhat bland. | ||
| BW Riviera and PerlaBelgrade | 6.4/ 10 | 5.8/ 10 | 5.8/ 10 |
The largest building-linked review base located was the 6.4/10 VacationRenter aggregate from 99 guest ratings for BW Premium Apartments, which sets the level under the supplied rules and converts to 5.8/10. A separate Riviera listing scored 9.2/10 from 93 guests, while Perla’s independently listed 5.0/5 had only one review and therefore cannot be the anchor; the evidence is short-stay-heavy and does not establish a robust long-term resident score. | |||
The available physical-condition feedback is mixed and concerns individual short-stay units rather than an engineering inspection. One guest reported the apartment was “poorly maintained,” with windows that did not close, air-conditioning problems and a garage/elevator key that did not work; another reported that the bathroom “smrdi na kanalizaciju” (smelled of sewage). Positive feedback described the building as “exceptionally modern and luxurious” with “pristine common areas.” | Guests consistently praised the riverfront setting, views and proximity to Galerija and the promenade; one review said the location was “unbeatable,” while another simply said, “Everything was absolutely perfect.” The negative side is concentrated in short-stay operations: guests reported ignored messages, missing basics, an unavailable paid room and an owner who was “a little unpleasant,” so these comments should not be treated as a definitive measure of long-term resident management. |
The ministry and Eagle Hills signed a term sheet for Tbilisi Waterfront and Gonio Yachts & Marina, with over USD 6.5 billion in planned investment.
Eagle Hills Muscat is a joint venture between Eagle Hills Abu Dhabi and Izz International for the Mandarin Oriental Muscat residential project.
Mandarin Oriental Hotel Group manages the Mandarin Oriental Muscat project developed by Eagle Hills Muscat.
Eagle Hills and The Ministry of Economy and Sustainable Development of Georgia sign a term sheet for the development of two visionary masterplans: Tbilisi Waterfront and Gonio Yachts & Marina.
Eagle Hills and The Ministry of Economy and Sustainable Development of Georgia sign a term sheet for the development of two visionary masterplans: Tbilisi Waterfront and Gonio Yachts & Marina.
With over USD 6.5 billion in investment, the Georgia portfolio sets a new benchmark in scale and quality.
Mandarin Oriental in Muscat is an exquisite residential project that is being developed by Eagle Hills Muscat, a joint venture between Eagle Hills Abu Dhabi and Izz International.
Mandarin Oriental in Muscat is an exquisite residential project that is being developed by Eagle Hills Muscat, a joint venture between Eagle Hills Abu Dhabi and Izz International.
Mandarin Oriental in Muscat is an exquisite residential project that is being developed by Eagle Hills Muscat, a joint venture between Eagle Hills Abu Dhabi and Izz International.
This project is managed by Mandarin Oriental Hotel Group.
This project is managed by Mandarin Oriental Hotel Group.
This project is managed by Mandarin Oriental Hotel Group.
| none found |
| United Arab Emirates | active 1 project tracked |
| Serbia | active 0 projects tracked |
| Jordan | active 0 projects tracked |
| Morocco | active 1 project tracked |
| Albania | active 0 projects tracked |
| Croatia | active 0 projects tracked |
| Italy | active 0 projects tracked |
| Latvia | active 0 projects tracked |
| Ethiopia | active 0 projects tracked |
| Bahrain | active 2 projects tracked |
| Egypt | active 0 projects tracked |
| Oman | active 1 project tracked |
| Georgia | announced_only 0 projects tracked |
| Maldives | announced_only 0 projects tracked |
| Residential, for sale | 4 of 8 |
| Hotel | 3 of 8 |
| Mixed use | 2 of 8 |
| Retail | 1 of 8 |
The response to Tbilisi Waterfront has been truly remarkable and speaks to the strength of Georgia’s market and the confidence of its people.Eagle Hills Properties LLC February 2, 2026https://eaglehills.com/tbilisi-waterfront-achieves-day-one-sell-out-as-georgian-buyers-lead-demand-for-a-new-landmark-destination/
At Eagle Hills, we believe in the importance of supporting national initiatives that invest in people and create lasting impact within society.Eagle Hills Properties LLC March 20, 2026https://eaglehills.com/eagle-hills-signs-agreement-with-awqaf-abu-dhabi-to-develop-aed-1-billion-mother-of-the-nation-city-project-in-support-of-the-mother-of-the-nation-endowment-for-orphans/
A graduate in Finance and Business Administration from Seattle University in the United States
A graduate in Finance and Business Administration from Seattle University in the United States
The founder and chairman of Eagle Hills Properties is Mohamed Alabbar
Founder & Chairman - Eagle Hills UAE (Current)
Founder and Chairman, Emaar Properties PJSC
The response to Tbilisi Waterfront has been truly remarkable and speaks to the strength of Georgia’s market and the confidence of its people.
At Eagle Hills, we believe in the importance of supporting national initiatives that invest in people and create lasting impact within society.
The founder and chairman of Eagle Hills Properties is Mohamed Alabbar
The founder and chairman of Eagle Hills Properties is Mohamed Alabbar
The founder and chairman of Eagle Hills Properties is Mohamed Alabbar
With over 30 years of experience in the real estate sector, Alabbar is also the founder of Emaar Properties
Founder and Chairman, Emaar Properties PJSC
A graduate in Finance and Business Administration from Seattle University in the United States
H.E. Mohamed Alabbar, Chairman of Eagle Hills; and Hesham Ibrahim, Group Chief Executive Officer of Eagle Hills;
We are proud to partner with DMT on an initiative that goes beyond traditional development and focuses on creating memorable experiences and vibrant destinations for residents and visitors.Abu Dhabi Media Office 16 May 2026https://www.mediaoffice.abudhabi/en/infrastructure/department-of-municipalities-and-transport-partners-with-eagle-hills-to-develop-community-destinations-across-abu-dhabi/
Hisham Ibrahim, Group Chief Executive Officer of Eagle Hills, said:
We are proud to partner with DMT on an initiative that goes beyond traditional development and focuses on creating memorable experiences and vibrant destinations for residents and visitors.
Hisham Ibrahim, Group Chief Executive Officer of Eagle Hills, said: “We are proud to partner with DMT on an initiative that goes beyond traditional development and focuses on creating memorable experiences and vibrant destinations for residents and visitors.”
Hisham Ibrahim, Group Chief Executive Officer of Eagle Hills, said:
This collaboration reflects a shared vision to activate communities and contribute to Abu Dhabi’s growing position as a leading global destination.
We are proud to partner with DMT on an initiative that goes beyond traditional development and focuses on creating memorable experiences and vibrant destinations for residents and visitors.
Hisham Ibrahim, Group Chief Executive Officer of Eagle Hills, said:
### Executive MBA Finance at Cass Business School
### Executive MBA Finance at Cass Business School
### Bachelor Double Major Finance & Marketing and Minor Economics at Binghamton University School of Management
### Bachelor Double Major Finance & Marketing and Minor Economics at Binghamton University School of Management
# Ammar AlBarzanji
### Senior Vice President Treasury & Corporate Finance and Commercial - Expo 2020 Dubai
### Group Treasurer and CFO - Drake & Scull International PJSC
### Group Treasurer - Group AMANA
### Head of Treasury and Corporate Finance - SENAAT - General Holding Corporation pjsc
### Director, Dubai & Northern Emirates - Financial Institutions - Standard Chartered
### Senior Relationship Manager - Financial Institutions - Abu Dhabi Commercial Bank
### Credit Analyst Officer - Corporate Banking Division - Invest Bank
Apr 2025 - Present (1 year and 5 months) in United Arab Emirates
Group CFO, Treasury, Corporate Finance, Financial Strategy, Risk Management, Funding, Debt & Equity Markets, FX, Commodities, Interest Rates, Derivatives
#### Group Chief Financial Officer (Current)
Group CFO, Treasury, Corporate Finance, Financial Strategy, Risk Management, Funding, Debt & Equity Markets
Group CFO, Treasury, Corporate Finance, Financial Strategy, Risk Management, Funding, Debt & Equity Markets
### Executive MBA Finance at Cass Business School
#### Group Chief Financial Officer (Current)
### PRMG - professional program in project management, Project Management at The American University in Cairo
### PRMG - professional program in project management, Project Management at The American University in Cairo
# Mostafa Fayed
### Executive Director Of Development - SODIC
### Senior Development Manager - Emaar Misr
### Business Development Manager - PACER Consultants
### Job Captain - rmc raafat miller consulting
### Architect - ECG Engineering Consultants Group S.A.
Mar 2024 - Present (2 years and 6 months) in United Arab Emirates
Experienced Development Director with a demonstrated history of working in the real estate industry. Skilled in Construction, Comprehensive Planning, Sustainable Design, Urban Planning, and Real Estate Development.
Head of Development at Eagle Hills Properties
Experienced Development Director with a demonstrated history of working in the real estate industry.
### Executive Director Of Development - SODIC
### Senior Development Manager - Emaar Misr
### PRMG - professional program in project management, Project Management at The American University in Cairo
Head of Development at Eagle Hills Properties
Working in line with the vision of His Majesty King Abdullah II and collaborating with ASEZA, our pursuit started and continues to elevate Jordan’s status as a leading tourism and investment destination at the regional and global scenes.Jordan News https://www.jordannews.jo/Section-114/All/Eagle-Hills-Jordan-shares-plans-at-World-Tourism-Day-celebration-7955
# Abdallah Al Fraihat
“Working in line with the vision of His Majesty King Abdullah II and collaborating with ASEZA, our pursuit started and continues to elevate Jordan’s status as a leading tourism and investment destination at the regional and global scenes.”
Jul 2014 - Present (12 years and 3 months) in Jordan
CEO- Eagle Hills International Properties/Jordan
### Eagle Hills Jordan CEO - Eagle Hills Jordan (Current)
### Eagle Hills Jordan CEO - Eagle Hills Jordan (Current)
Saraya Aqaba hosted a World Tourism Day event that highlighted the future plans of Eagle Hills Jordan to promote growth in the Kingdom.
# Abdallah Al Fraihat CEO- Eagle Hills International Properties/Jordan
Doctor of Philosophy - PhD (Sustainable construction management)
American University of Sharjah Doctor of Philosophy - PhD (Sustainable construction management)
American University of Sharjah Master of Science - MS (Engineering Systems Management)
American University of Sharjah Master of Science - MS (Engineering Systems Management)
Bachelor of Science - BS (Civil Engineering)
American University of Sharjah Bachelor of Science - BS (Civil Engineering)
### Chief Executive Officer ### Khalid Alsuwaidi Location - Sharjah, United Arab Emirates
Chief Executive Officer - Eagle Hills Sharjah @ Sharjah Investment and Development Authority (Shurooq) (September 2023 - Present)
Internship Trainee @ Halcrow (January 2013 - June 2013)
Site Engineer @ Arabtec Construction LLC (January 2012 - December 2012)
Chief Executive Officer @ Eagle Hills Sharjah (September 2023 - Present)
Khalid Alsuwaidi, based in Sharjah, United Arab Emirates, is currently a Chief Executive Officer at Eagle Hills Sharjah.
Chief Executive Officer @ Eagle Hills Sharjah (September 2023 - Present)
Chief Executive Officer @ Eagle Hills Sharjah (September 2023 - Present)
Bachelor of Science - BS (Civil Engineering)
Doctor of Philosophy - PhD (Sustainable construction management) 2023-2027
- Chief Executive Officer @ Eagle Hills Sharjah (September 2023 - Present)
0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Aysha Residences 1 and 2 | Sharjah, United Arab Emirates Maryam Island | residential for sale | — | — | — | — | 30/701 | 2024 | January 17th to 20th | Jan 2026 – Dec 2026 | Jan 2026 – Mar 2026 | −4.5 mo (−11.0 to +2.0) | sourced | completed |
| The Bristol Belgrade | Belgrade Belgrade Waterfront | hotel | — | — | — | — | — | 2022 | February 2022 | — | Feb 2025 | — | not scorable | completed |
| BW Riviera and Perla | Belgrade | residential for sale | — | — | 100,000 m² | — | 7 installments during construction with 0% INTEREST RATE.1 | 2022 | September 9 | Dec 2025 | Jan 2025 – Dec 2025 | −5.5 mo (−11.0 to 0.0) | sourced | completed |
| Mandarin Oriental, Muscat (hotel) | Muscat, Oman Shatti Al-Qurum | hotel | — | — | — | — | 30/701 | 2024 | 3 June 2024 | Jul 2024 – Sep 2024 | Jun 2024 | −2.0 mo (−3.0 to −1.0) | sourced | completed |
| Marassi Galleria | Bahrain Diyar Al Muharraq | retail, mixed use | — | three levels | 114,000 m² | — | — | 2024 | 2024 | Oct 2023 – Dec 2023 | Feb 2024 | +3.0 mo (+2.0 to +4.0) | sourced | completed |
| Rabat Square Phase II (ORA and OPAL) | Rabat, Morocco Domaine Dar Es Salam | residential for sale, mixed use | — | — | — | MAD 320m estimated cost | — | 2020 | 05 Mars 2020 | Jan 2023 – Dec 2023 | Jan 2024 – Dec 2024 | +12.0 mo (+1.0 to +23.0) | sourced | completed |
| The St. Regis Belgrade hotel | Belgrade Belgrade Waterfront | hotel | — | — | — | — | 50% now, the remaining amount after move-in1 | — | — | — | Jan 2024 – Dec 2024 | — | not scorable | completed |
| Marassi Park | Manama, Bahrain Marassi Al Bahrain | residential for sale | 2491 | 10 storeys | 25,500 m² | — | — | 2021 | February 21, 2021 | Jul 2023 – Sep 2023 | Sep 2023 | +1.0 mo (0.0 to +2.0) | estimated | completed |
| Coverage | active |
| Tracked since | October 6, 2026 |
| Last checked | October 13, 2026 this month |
| Profile last researched | October 13, 2026 |
| Claim |