no description sourced
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
No evidenced risk flags in the sources reviewed. An absence of flags is not evidence that there is no risk.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| Saraya Tower 1Saraya, Abu Dhabi Corniche, Abu Dhabi74 units | 8.1/ 10 | —/ 10 | 8.1/ 10 |
The largest located review aggregate is 4.3/5 from 11 reviews, converted to 7.9/10 under the requested curve. A recurring cleanliness/upkeep positive theme adds about 0.15, producing 8.1 overall; the evidence is better for living quality than for structure. The review listing is labelled generically “Saraya Tower,” so it is treated as cluster-level rather than conclusively Tower 1-specific; the result should therefore be read with that identification uncertainty. | |||
The published reviews provide only limited systems-related evidence. One reviewer said “the service elevator is very small for furniture,” while the available building record identifies Saraya Tower 1 as completed in 2017; no published evidence located here establishes a structural defect, leak, HVAC failure or plumbing failure. | The strongest positive feedback says the building is “well-maintained and tidy,” staff are “very friendly and helpful,” and “maintenance is quick and efficient.” Offsetting comments describe a “very poor gym,” a very small pool, and terrace trash “still not resolved despite all the complaints filed to the management.” |
Emirates Developments signed an agreement with Jumeirah to develop Jumeirah Residences Al Maryah Island.
The company states that it works through branded residential partnerships with Hilton.
Emirates Developments collaborated with ELIE SAAB on STELLAR by ELIE SAAB.
announced the signing of a landmark agreement with Jumeirah
to develop Jumeirah Residences Al Maryah Island
branded residential partnerships with names such as Hilton and Elie Saab
in collaboration with ELIE SAAB, the global luxury fashion and lifestyle brand
| TAX ID | 104053219200003 United Arab Emirates · AE · Registered |
| United Arab Emirates | active 2 projects tracked |
| no project types recorded |
This partnership with Jumeirah marks a defining milestone for Emirates Developments as an iconic residential address that sets new benchmarks in architectural excellence and premium urban living.Jumeirah Media Hub 19 January 2026https://mediahub.jumeirah.com/emirates-developments-enters-agreement-with-jumeirah-to-develop-jumeirah-branded-residences-on-al-maryah-island-abu-dhabi/?lang=eng
Credibility is proven after the transaction, not at the point of sale.The Hotel Show 23 July 2026https://www.thehotelshow.com/governance-not-glamour-is-powering-the-next-chapter-of-branded-residences-in-the-uae/
Eng. Tareq Siam, Managing Director of Emirates Developments, will speak on the conference panel
Tareq Siam, Managing Director at Emirates Developments, said:
“Credibility is proven after the transaction, not at the point of sale,” Siam says.
Eng. Tareq Siam, Managing Director of Emirates Developments, will speak on the conference panel
Over the past year, Mr. Siam has led four branded partnerships across Abu Dhabi and Dubai, working with names including Jumeirah, Hilton and ELIE SAAB to bring new residential experiences to the UAE.
Eng. Tareq Siam, Managing Director of Emirates Developments, will speak on the conference panel
Over the past year, Mr. Siam has led four branded partnerships across Abu Dhabi and Dubai, working with names including Jumeirah, Hilton and ELIE SAAB to bring new residential experiences to the UAE.
Over the past year, Mr. Siam has led four branded partnerships across Abu Dhabi and Dubai, working with names including Jumeirah, Hilton and ELIE SAAB to bring new residential experiences to the UAE.
Eng. Tareq Siam, Managing Director of Emirates Developments, will speak on the conference panel
#### BE, MECHANICAL ENGINEERING
### Tishreen University
# Ahmed Raai
# Ahmed Raai
Projects Director at Ecotherm Contracting LLC
MEP Construction Manager at JACOBS International Holding
Sr. Mech Engineer Deputy Project Manager at Reliance Electromechanical co. LLC
# Ahmed Raai
Chief Operating Officer (Current) Feb 2026 - Present (7 months) in United Arab Emirates
MEP Projects Manager. PMP, BS.C. in Mechanical Engineering. 24 Years Experience in Projects Management and Developments in UAE.
MEP Projects Manager. PMP, BS.C. in Mechanical Engineering. 24 Years Experience in Projects Management and Developments in UAE.
Chief Operating Officer (Current) Feb 2026 - Present (7 months) in United Arab Emirates
#### Engineer's Degree Civil Engineering
### Jami't Al-Ba'ath
# Nameer Al Wafai
# Nameer Al Wafai
Project Director - Taraf Real Estate Development
Project Manager - WEBRIDGE PROPERTIES L.L.C.
Projects Manager - Granada Architecturals & Consulting Engineers L.L.C.
# Nameer Al Wafai
Projects Director with 20+ years of experience across the UAE and GCC, leading the development and delivery of luxury residential, branded residences, hospitality and complex mixed-use developments.
Projects Director with 20+ years of experience across the UAE and GCC, leading the development and delivery of luxury residential, branded residences, hospitality and complex mixed-use developments.
Leading the development and delivery of Emirates Developments’ portfolio of luxury residential, branded residences, hospitality and complex real estate developments across Abu Dhabi and Dubai.
#### Masters ( MBA Hons) in Business Administration
### Canadian University College
# Mai Al Hameli
# Mai Al Hameli
Assistant Vice President - Wealth Management - ALDAR
Senior Contract Manager - First Abu Dhabi Bank (FAB)
Senior Manager Marketing Analysis - Meraas
# Mai Al Hameli
A credible and client-focused Senior Vice President of Global Private Office with over 16 years of experience.
A credible and client-focused Senior Vice President of Global Private Office with over 16 years of experience.
Senior Vice President - [Emirates Developments] (Current)
#### Bachelor of Science (BSc) Real Estate
### Oxford Brookes University
# Jack Gillingham MRICS
# Jack Gillingham MRICS
Vice President - ALDAR
Business Development Manager MEA & India - Berkeley Group Plc - Berkeley International
Asset Manager - St George PLC
# Jack Gillingham MRICS
Senior Vice President - [Emirates Developments] (Current) Sep 2026 - Present (1 month) in Abu Dhabi, Abu Dhabi, United Arab Emirates
I’m delighted to share that I’ve joined Emirates Developments as Senior Vice President, Global Private Office.
I’m delighted to share that I’ve joined Emirates Developments as Senior Vice President, Global Private Office.
Senior Vice President - [Emirates Developments] (Current) Sep 2026 - Present (1 month) in Abu Dhabi, Abu Dhabi, United Arab Emirates
#### Master's degree
### University of Wolverhampton
# Firas Shurbaji , MBA
# Firas Shurbaji , MBA
Senior Sales Manager - RAK Properties
Senior Sales Manager - Royal Development Company
Marketing Manager - Royal Development Company
# Firas Shurbaji , MBA
Total Experience: 17 years and 1 month
Total Experience: 17 years and 1 month
Director of Sales and Marketing - [Emirates Developments] (Current)
0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Saraya Tower 1 | Abu Dhabi, United Arab Emirates Saraya, Abu Dhabi Corniche | 741 | 46 | 45,619 m² | — | — | 2011 | 2011 | — | Jan 2017 – Dec 2017 | — | not scorable | completed | |
| Saraya Tower 2 | Abu Dhabi, United Arab Emirates Saraya, Abu Dhabi Corniche | 481 | 41 | 38,889 m² | — | — | 2011 | 2011 | — | Jan 2017 – Dec 2017 | — | not scorable | completed |
| Coverage | active |
| Tracked since | October 6, 2026 |
| Last checked | October 14, 2026 this month |
| Profile last researched | October 14, 2026 |
| Claim |