GiarratanaNashville, United States · founded 1990 · 1 active markets
PRIVATE

Giarratana develops high-rise residential apartments, condominiums, and mixed-use towers in Nashville’s downtown core and SoBro. Its projects target renters, condominium buyers, investors, and commercial users, combining ground-up development, adaptive preservation, urban retail, office space, parking, and related property-management operations locally.

Years in business
36
founded 1990
LinkedIn headcount
17
employees, as shown on LinkedIn · size band 11–50
Portfolio value
USD 1 billion worth of towers
by 2026
Units delivered
over 3,000 new residential units
as the company states it
Projects last researched October 11, 2026
Every figure on this card was read out of a document.

Overview

Investor tear sheet

a summary of the tabs that follow · no rating of our own

Company dossier

Legal name
GIARRATANA, LLC1
Headquarters
424 Church Street, Suite 29001, Nashville1, United States
Founded
19901
Entity type
PRIVATE1
Business model
offplan for sale1, build to rent1, commercial1, mixed use1, other1
Markets
1 market listed
What they build
Residential, for rent (5 of 7) · Retail (2 of 7) · Other (1 of 7)
Full dossier in About →

Delivery record

5 date-assessed of 7 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
7
within the rolling ten-year window
Median delay
+1.5 mo
the middle of 5 scored projects
Average delay
+1.6 mo
the same projects, pulled by the worst
Average time to deliver
—
2 delivered projects with a dated start — needs 3
Worst slip
+10.0 mo
Elliston Place Soda Shop relocation and renovation · +9.0 to +11.0
4
early or less than 6 months late
6 to 12 months late
1
yellow rows below
Over 12 months late
0
red rows below

Against other developers

5 date-assessed here · 249 developers, 928 date-assessed projects in United States
Median delay
Giarratana·249 developers in United States
+1.5 mo vs +4.5 mo
this developer 3.0 mo better
The typical project on each side.
Average delay
Giarratana·249 developers in United States
+1.6 mo vs +7.5 mo
this developer 5.9 mo better
Both pulled by their worst few.
On time
Giarratana·249 developers in United States
80% vs 55%
this developer 25 pts better
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Projects and timelines in Track Record →

Resident experience

7 of 7 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
8.3/ 10
Weighted judgment across build and operations · from 7 of 7 rated buildings
Little structure evidence (2 of 7 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
8.3/ 10
Fabric, services, waterproofing, envelope · from 2 of 7 rated buildings
Management & living
8.4/ 10
Upkeep, response times, amenities, community · from 7 of 7 rated buildings

Against other developers

7 rated here · 270 developers, 1381 rated buildings in United States
Overall rating
Giarratana · 270 other developers in United States
8.3 vs 7.7
this developer 0.6 better
The weighted verdict on each side. From 7 of 7 rated buildings here and 1381 in the market.
Structure & systems
Giarratana · 270 other developers in United States
— vs 6.9
Too few buildings with this score here to compare (2 of 7)
Fabric and engineering only — fixed at handover. From 2 of 7 rated buildings here and 586 in the market.
Management & living
Giarratana · 270 other developers in United States
8.4 vs 7.4
this developer 1.0 better
Upkeep and response — belongs to whoever runs the building now. From 7 of 7 rated buildings here and 1326 in the market.
The market here is United States: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.
Ratings by building →

Awards & recognition

All awards →

Risks & source coverage

  • DELIVERY DELAY June 6, 2025; updated August 11, 2025 As reported on June 6, 2025, Giarratana terminated the previously arranged $232 million construction loans for the proposed Paramount tower, leaving the project without construction financing; in August 2025, it was still seeking to close a replacement $360 million loan after an expected July closing did not occur. Giarratana said new financing was being pursued, so this documents delay and financing uncertainty rather than cancellation or completed abandonment.
  • FINANCIAL DISTRESS July 13, 2009 (reporting on defaults beginning in 2008 and 2009) A July 2009 report documented that the project entity Signature Holdings, owned by Giarratana, had a development loan for the proposed Signature Tower in default for nonpayment, including an unpaid scheduled $1.4 million payment, and that the project remained in pre-construction; the report also stated that no property had yet entered foreclosure. Giarratana disputed the characterization of its relationship with the lender and said it was negotiating an extension and continuing to service the debt.
  • DELIVERY DELAY 6 June 2025; financing resolution reported 19 August 2025 Paramount — Giarratana had terminated the project’s prior $232 million construction-loan package, leaving the 60-story tower without construction financing in June 2025; this was subsequently resolved when Giarratana closed a $340 million loan in August 2025 and reported full-scale work expected to begin September 15, 2025.
  • 4 more in Risk & Sources
Record status
active
Company sources
95 source entries across 92 fields
Projects tracked
7 · 7 completed in assessment
All flags and sources →

Track Record

Delivery record

5 date-assessed of 7 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
7
within the rolling ten-year window
Median delay
+1.5 mo
the middle of 5 scored projects
Average delay
+1.6 mo
the same projects, pulled by the worst
Average time to deliver
—
2 delivered projects with a dated start — needs 3
Worst slip
+10.0 mo
Elliston Place Soda Shop relocation and renovation · +9.0 to +11.0
4
early or less than 6 months late
6 to 12 months late
1
yellow rows below
Over 12 months late
0
red rows below

Against other developers

5 date-assessed here · 249 developers, 928 date-assessed projects in United States
Median delay
Giarratana·249 developers in United States
+1.5 mo vs +4.5 mo
this developer 3.0 mo better
The typical project on each side.
Average delay
Giarratana·249 developers in United States
+1.6 mo vs +7.5 mo
this developer 5.9 mo better
Both pulled by their worst few.
On time
Giarratana·249 developers in United States
80% vs 55%
this developer 25 pts better
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
The market here is United States: every other developer whose head office is in the same country, because planning regimes and reporting norms move together within one. It is not a city, a sector or a size band. Read the two delay figures together. A median close to the market with a much better average means no single disaster; the reverse means one project is carrying the record. Time to deliver runs from the earliest start we hold to the completion itself — a construction start where a source gave one, otherwise a sales launch, otherwise the launch year read as its January. A handover the sources place only inside a year is read as that December, so a duration is the widest the record allows rather than the flattering end of it. Only delivered projects dated at both ends count, so it is taken over fewer projects than the delay figures, and a long build is not a fault: a tower is not a villa run. Sourced figures only, both sides, and values taken from documents held on file are excluded here — a developer who shares their records should not score better than one who does not.

Construction start to handover

7 of 7 projects dated · 1 place
Based on covered projects with documented construction or launch dates and available handover dates. Timelines vary by project and may not represent the developer’s full portfolio.
Construction start, or the launchTarget completion (window)Completion or handover, as reportedCurrently statedLaunch year only, no date publishedEarly or ≤6 mo lateOver 6–12 mo lateOver 12 mo lateStalled
Nashville, United States
2015201620172018201920202021202220232024202520262027todayNASHVILLE, UNITED STATEScompleted, no target published−0.5 moverified+8.5 moestimated+1.5 moverified+10 moverified+1.5 moverified−4.5 moverified
Click a row in the chart to open a project, or a table row below to see its sources. The chart runs wider than the page where the record spans many years — scroll it sideways to follow a project to its handover. Every date we have is drawn. A hollow marker is only a launch year, not a date anyone published. No dates published means we looked and found none; dates not yet checked means we have not looked yet. Handing over is not finished — rows say which. A delay is shown when one source gives the promised date and another gives the real one, however rough: "2019" still counts, and the row shows how wide that is. Projects missing one of the two dates, or with sources that disagree, are left out of the figures. 2 dated statements are held back: a broker listing with no date on it, or a page with no year, cannot fix a date. 3 turned out to be about something else — a phase, a neighbour, the wider masterplan — and are marked off-subject.

Building & Livability Ratings

Resident experience

7 of 7 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
8.3/ 10
Weighted judgment across build and operations · from 7 of 7 rated buildings
Little structure evidence (2 of 7 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
8.3/ 10
Fabric, services, waterproofing, envelope · from 2 of 7 rated buildings
Management & living
8.4/ 10
Upkeep, response times, amenities, community · from 7 of 7 rated buildings

Against other developers

7 rated here · 270 developers, 1381 rated buildings in United States
Overall rating
Giarratana · 270 other developers in United States
8.3 vs 7.7
this developer 0.6 better
The weighted verdict on each side. From 7 of 7 rated buildings here and 1381 in the market.
Structure & systems
Giarratana · 270 other developers in United States
— vs 6.9
Too few buildings with this score here to compare (2 of 7)
Fabric and engineering only — fixed at handover. From 2 of 7 rated buildings here and 586 in the market.
Management & living
Giarratana · 270 other developers in United States
8.4 vs 7.4
this developer 1.0 better
Upkeep and response — belongs to whoever runs the building now. From 7 of 7 rated buildings here and 1326 in the market.
The market here is United States: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.

By building

7 rated · 0 not rated · scale 1–10
ProjectOverallStructure & systemsManagement & living
Pearl FlatsNorth Nashville, Nashville107 units
9.4/ 10
—/ 10
9.4/ 10

Google Reviews/Maps supplies the anchor at 4.7/5 from 45 reviews, converted to 9.1/10 under the stated curve. The written evidence is strongly positive on management, maintenance, amenities and location, with only minor noise and early-operation reservations, producing a small positive commentary adjustment to 9.4; no structure score is assigned because no published structural rating was found.

+ Well-maintained facilities+ New build+ Responsive maintenance team
− Early completion issues with elevator and parking gate− Paint finish scuffs easily
+ Responsive management+ Friendly staff+ Well-maintained gym and pool+ Controlled/gated parking and patrol+ Convenient downtown and Vanderbilt location
− Train noise− Neighbor impact noise− Occasional construction noise− Small apartment layouts− Early-operation amenity delays

Published resident feedback describes the property as a “new build and very nice,” and another reviewer calls the building “well maintained” with a responsive maintenance team. The main physical-condition reservations were cosmetic or completion-related: a “chalk type finish on the paint” that scuffs easily and opening-period items including the “parking gate, mailboxes, pool, elevator” not being ready as expected; no flooding, major systems failure or structural failure was reported.

Residents repeatedly praise the staff: one calls them “the friendliest, most helpful and supportive staff,” while others say management addressed concerns “in a timely and polite manner” and maintenance was responsive. Daily-life drawbacks were mostly minor—train, stomping and occasional construction noise, plus an early review saying the parking gate, mailboxes, pool and elevator were not initially ready—while the same reviews describe the building as calm, clean and well maintained.

The PearlNashville50 units
9.0/ 10
—/ 10
9.0/ 10

Google Reviews/Maps provides the largest published review base, at 4.7/5 from 45 reviews, which converts to 9.1 before commentary. The score is set at 9.0 after modest downward adjustment for recurring noise and small-unit concerns, partly offset by repeated praise for staff, maintenance, amenities and location; no structural score is assigned because the evidence does not support a separate fabric/systems rating.

+ Well-maintained facilities+ Responsive maintenance+ New construction+ In-unit laundry+ Pool and gym
− Train noise− Small units− Paint scuffs easily− Initial elevator/access readiness issues
+ Responsive management+ Helpful staff+ Convenient location+ Well-maintained amenities+ Affordable relative to Midtown
− Train and city noise− Small units− Initial amenity/access delays− Immediate-area safety concern

Residents generally describe the property as new, well maintained and supported by responsive maintenance; one review says the facilities were “great and well-maintained,” while another calls the maintenance manager “very kind and friendly.” The available physical-condition complaints are limited: paint “causes it to scuff easily,” and one early resident said the parking gate, mailboxes, pool and elevator were not initially ready; no flooding, major structural failure or prolonged lift outage was reported.

Residents repeatedly praise management and staff: one called the team “incredibly kind, helpful, and competent,” while another said management addressed concerns “in a timely and polite manner.” The main lifestyle drawbacks are recurring train/city noise and compact units; reviews also mention that some features were initially unfinished and that walking outside after dark was not preferred.

Elliston Place Soda Shop relocation and renovationNashville
8.9/ 10
—/ 10
8.9/ 10

Google’s 4.5/5 aggregate, based on 2,401 reviews, sets the level and converts to 8.5/10 under the specified curve. Tripadvisor’s 4.3/5 from 65 reviews is directionally consistent, while the sampled written feedback is strongly positive on service, atmosphere and food; recurring praise supports a modest upward adjustment.

+ Remodeled and expanded space+ Clean and comfortable+ Refurbished historic soda fountain+ Booths with outlets and USB ports
+ Friendly servers+ Fast service+ Classic atmosphere+ Good food and shakes+ Free parking and family-friendly setting
− Occasional menu-item disappointment− Limited sense of regular-customer community

Published renovation coverage describes a 1907 building remodeled over 18 months, with the historic red tile, retro furniture, restored 1947 soda fountain and refurbished jukeboxes retained. Review excerpts describe the remodeled diner as “clean” and note “plug ins at each booth and great wi-fi”; no published review located for this report alleges leaks, HVAC, plumbing, electrical or other serious system failure.

The strongest published feedback is operational: reviewers call staff “super friendly,” “extremely helpful,” and “fast,” while praising the classic atmosphere and food. The main negative evidence is limited and minor: one reviewer said the hot chicken was “disappointing” and that there was not much feeling of employees and customers greeting one another “like old friends.”

Downtown YMCA redevelopmentNashville
8.5/ 10
—/ 10
8.5/ 10

The Google/Maps aggregate of 4.3/5 from 333 reviews sets the level, converting to 7.9/10 under the specified curve. The reviewed member commentary is overwhelmingly favorable on cleanliness, staff, equipment and amenities, with only minor convenience complaints, producing an overall 8.5/10 living assessment; no physical-systems score is assigned because the written evidence does not evaluate those systems.

+ New indoor aquatics center+ Rooftop fitness lawn+ Upgraded locker rooms+ Expanded wellness and strength-training space+ Refreshed original wing
+ Clean facilities+ Friendly staff+ Helpful front desk+ Good equipment+ Community atmosphere
− Parking cost− Limited evening cycle programming− Sunday-hours preference

Published project reporting says the redevelopment was complete by September 2025, with the new five-story addition, basement lap pool, rooftop turf workout space and refreshed original wing finished. The published member reviews read here do not report leaks, flooding, HVAC, plumbing, electrical or lift failures; therefore no negative structural tag or structure score is assigned.

Member feedback is strongly favorable: reviewers describe a “Fantastic environment,” “cleanliness of facilities,” equipment “in great shape,” and “super nice” front-desk staff. The reservations actually reported are comparatively minor—one reviewer disliked paying for parking, while others wanted an evening cycle class or longer Sunday hours.

PrimeNashville350 units
7.9/ 10
—/ 10
7.9/ 10

The largest published review base is the building-specific 4.2/5 from 11 reviews, which converts to 7.6/10 under the requested curve. The mostly positive written feedback on staff, views, community and amenities supports a modest upward adjustment, while the reported negative experiences are not recurring themes meeting the scoring rule.

+ Modern living spaces+ Appliances described as nice
− Appliances/Wi-Fi reported to break− Locked-off elevators− Parking garage reported to smell
+ Friendly staff+ Responsive leasing team+ Strong views+ Resident community+ Resort-style amenities
− Reported management non-response− Reported move-in delays− High fees/pricing complaints− Locked-off elevators− No grills reported

The published reviews provide limited physical-systems evidence rather than an engineering assessment. One resident said the apartments were "very clean" and that maintenance was "always quick and fixed everything," while another reported that "appliances/wifi/things around the building are always breaking" and that the parking garage smells.

Daily-life feedback is polarized but leans positive: residents describe "wonderful staff and community," "fantastic friendly service," unmatched views and a leasing team that works to make residents feel at home. Negative reviews report waiting hours because the building was not ready at move-in, unanswered management questions for more than a month, and price and fee concerns; a tour reviewer called the experience "highly DISAPPOINTED."

AlcoveNashville356 units
7.8/ 10
8.9/ 10
RentCafe 5/5 · 59 reviews · rentcafe.com
RentCafe publishes 5/5 from 59 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 8.9.
7.3/ 10
RentCafe 3.5/5, 4.5/5, 4.5/5, 4/5, 4.5/5, 3.5/5 · 59 reviews · rentcafe.com
VeryApt 10/10, 8.5/10, 9.5/10, 9/10, 8.5/10 · 2 reviews · veryapt.com
Combined from 11 published figures on 2 platforms, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.3.

RentCafe's 4.0/5 resident aggregate, based on 59 reviews, is the largest qualifying review base and converts to 7.0/10, setting the level. The score is slightly reduced for recurring construction noise and partly offset by repeated praise for staff, maintenance and amenities. The reported structural material supports a cautious 7.0/10 structure assessment, but no independent structural aggregate sets that component.

+ Fast maintenance+ High-quality finishes+ Fast elevators+ Clean common areas
+ Professional staff+ Responsive management+ Strong security+ High-quality amenities+ Walkable location
− Construction noise− Expensive parking− Valet cancellation− Expensive utilities and fees

Residents describe the building as “state-of-the-art,” with “fast elevators,” excellent finishes and maintenance that is “fast and effective.” RentCafe publishes a 5.0/5 maintenance sub-rating, while the reviewed complaints did not report flooding, leaks, lift failures or other serious structural or systems failures.

Day-to-day reviews are strongly favorable: residents call the staff “extremely professional and kind,” say maintenance is handled in a timely manner, and praise the pools, concierge, security and community events. The main recurring drawback is construction noise—one resident said it “regularly permeates my unit”—along with parking inconvenience and cost; another complained about expensive utilities and administrative fees.

505Nashville527 units
6.8/ 10
7.8/ 10
RentCafe 4.5/5 · 50 reviews · rentcafe.com
RentCafe publishes 4.5/5 from 50 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.8.
8.1/ 10
RentCafe 4/5, 4.5/5, 5/5, 4.5/5, 5/5, 5/5, 4.5/5 · 50 reviews · rentcafe.com
Combined from 7 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 8.1.

Google Reviews/Maps provides the largest review base and sets the initial level at 7.0/10 from 4.0/5. The smaller but higher RentCafe rating and lower Yelp rating create opposing platform disagreement; operational praise is substantial, but management/elevator complaints and the documented fire-related disruption support a modest net reduction to 6.8. The 2023 incident is historical evidence, not proof that the same condition remains unresolved on October 11, 2026.

+ Modern glass tower+ Controlled-access parking+ Dedicated passenger and service elevators+ Resort-style pool and rooftop amenities
− Fire and electrical event− Sprinkler-water intrusion− Temporary elevator outage− Temporary emergency-lighting outage
+ Concierge service+ Friendly management and leasing staff+ Strong amenity package+ Security and controlled access+ Walkable downtown location
− Management responsiveness complaints− Elevator communication complaints− High parking cost− Limited guest parking− Mediocre gym reported by one renter

RentCafe reports 4.5/5 for maintenance across 50 reviews, while one Apple Maps/Yelp review says only two of three elevators were working and residents received no communication. In September 2023, WSMV reported an electrical event after sprinkler water reached an electrical closet; the incident caused extensive damage to 51 units and minor damage to 63 units, with a stated return timeline of at least three weeks.

Published resident reviews are strongly positive about daily life: one calls 505 a “5star hotel,” while others praise the pool, community, concierge and walkability. The negative operational feedback is concentrated in management communication, elevator availability, parking cost and gym quality; one review says parking is “too expensive and nowhere for guests,” while another says management’s service requires “pulling teeth.”

Only buildings that have reached handover are rated. 0 of 7 projects carry no rating: a building still under construction is never asked about, one that has just been handed over may not have been reached yet, and the rest were asked about and no published resident commentary was found. Structure is fixed at handover and stays the developer's; management and living belongs to whoever runs the building now. The overall verdict weights both rather than averaging them. None of this is checked: a rating is what people published about a building, aggregated — it is not evidence, it cannot move a delay figure, and it is not part of the delivery record above.

About

Company dossier

Legal name
GIARRATANA, LLC
Headquarters
424 Church Street, Suite 2900, Nashville, United States
37219
Founded
1990
Nashville, US
Entity type
PRIVATE
Revenue
USD 13.66 million annual revenue
Business model
offplan for sale, build to rent, commercial, mixed use, other

Partners

5 partners
Benefit Street Partners
funder

Provided the whole $340 million construction loan for Paramount.

BankOZK
funder

Previously provided construction financing for Paramount.

Related Fund Management
funder

Previously provided construction financing for Paramount with BankOZK.

Brasfield & Gorrie
contractor

Manages construction of Paramount and previously teamed with Giarratana on Encore and the Bridgestone headquarters.

Goettsch Partners
partner

Listed as architect on four tracked Giarratana Development projects.

Sources: partners

COMPANY2025-08-18

GIARRATANA Closes $340 Million Construction Loan for Paramount

Giarratana · carried by cdn.credaily.com
Nashville developer GIARRATANA has closed a $340 million construction loan for the $460 million Paramount today with Benefit Street Partners
value seen: Benefit Street Partners
https://cdn.credaily.com/uploads/2025/08/0f795-ParamountPressRelease.pdf

Sources: partners

COMPANY2025-08-18

GIARRATANA Closes $340 Million Construction Loan for Paramount

Giarratana · carried by cdn.credaily.com
GIARRATANA previously closed $232 million in construction financing for Paramount with BankOZK and Related Fund Management
value seen: BankOZK
https://cdn.credaily.com/uploads/2025/08/0f795-ParamountPressRelease.pdf

Sources: partners

COMPANY2025-08-18

GIARRATANA Closes $340 Million Construction Loan for Paramount

Giarratana · carried by cdn.credaily.com
GIARRATANA previously closed $232 million in construction financing for Paramount with BankOZK and Related Fund Management
value seen: Related Fund Management
https://cdn.credaily.com/uploads/2025/08/0f795-ParamountPressRelease.pdf

Sources: partners

COMPANY2025-08-18

GIARRATANA Closes $340 Million Construction Loan for Paramount

Giarratana · carried by cdn.credaily.com
Brasfield & Gorrie will manage construction of the 60-story mixed-use tower
value seen: Brasfield & Gorrie
https://cdn.credaily.com/uploads/2025/08/0f795-ParamountPressRelease.pdf

Sources: partners

OTHERdate not shown in source

Giarratana Development · Nashville Development Data

Groundbreak
Goettsch Partners architect · 4 projects
value seen: Goettsch Partners
https://pro.groundbreak.city/nashville/companies/a35d8d8f-d79e-42a4-83de-7e46b145051f

Registrations & licences

none found
Jurisdiction-agnostic: a DLD number, a Companies House number and a state RERA registration all land in the same table.

Contact

Markets

1 countries
United Statesactive 7 projects tracked

What they build

4 types
Residential, for rent5 of 7
Retail2 of 7
Other1 of 7
Residential, for sale1 of 7
A project counts once under each type it carries, so the shares add to more than the project count.

Management

Principals & executives

6 names found
TG
Tony Giarratana
Tony Giarratana is Giarratana’s President, owner and developer, with responsibility spanning the company’s high-rise apartment and condominium development, management, sales and leasing. His documented track record includes pioneering high-rise residential projects in Nashville’s urban core and founding Premier Parking.
Current title
President; owner and developer
since Jan 1986
Experience
40+ years real estate
Companies before
none sourced
Education
University of South FloridaBachelor's, Finance / Business Administration
Other boards
Nashville Downtown Partnership advisory boardLipscomb University College of Business advisory boardMonroe Carrel, Jr. Children’s Hospital advisory boardNashville Symphony advisory boardNashville Zoo advisory board
Known for
FounderOwner/developerHigh-rise developmentFounded Premier ParkingB.A. Finance/Business Administration
https://linkedin.com/in/tony-giarratana-4b99bb103
We are incredibly honored to receive this global recognition for Alcove. This award is a testament to the hard work and dedication of everyone involved in the project, from conception to completion. City Now Next October 7, 2024https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: degree

OTHER2024-09-30

Tony Giarratana, President GIARRATANA LLC

Urban Land Institute · carried by ulidigitalmarketing.blob.core.windows.net
Tony earned a degree in Business Administration from the University of South Florida.
value seen: degree in Business Administration
https://ulidigitalmarketing.blob.core.windows.net/ulidcnc/sites/5/2024/09/Tony-Giarratana-Bio.pdf

Sources: institution

OTHER2024-09-30

Tony Giarratana, President GIARRATANA LLC

Urban Land Institute · carried by ulidigitalmarketing.blob.core.windows.net
Tony earned a degree in Business Administration from the University of South Florida.
value seen: University of South Florida
https://ulidigitalmarketing.blob.core.windows.net/ulidcnc/sites/5/2024/09/Tony-Giarratana-Bio.pdf

Sources: full name

OTHER2024-09-30

Tony Giarratana, President GIARRATANA LLC

Urban Land Institute · carried by ulidigitalmarketing.blob.core.windows.net
Tony Giarratana, President
value seen: Tony Giarratana
https://ulidigitalmarketing.blob.core.windows.net/ulidcnc/sites/5/2024/09/Tony-Giarratana-Bio.pdf

Sources: linkedin page

SOCIAL2026-09-18

Tony Giarratana

LinkedIn
# Tony Giarratana
value seen: https://linkedin.com/in/tony-giarratana-4b99bb103
value paraphrased from this source
https://linkedin.com/in/tony-giarratana-4b99bb103

Sources: other boards

OTHER2024-09-30

Tony Giarratana, President GIARRATANA LLC

Urban Land Institute · carried by ulidigitalmarketing.blob.core.windows.net
He serves on the advisory boards of the Nashville Downtown Partnership, Lipscomb University College of Business, Monroe Carrel, Jr. Children’s Hospital, Nashville Symphony, and Nashville Zoo.
value seen: Nashville Downtown Partnership; Lipscomb University College of Business; Monroe Carrel, Jr. Children’s Hospital; Nashville Symphony; Nashville Zoo
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://ulidigitalmarketing.blob.core.windows.net/ulidcnc/sites/5/2024/09/Tony-Giarratana-Bio.pdf

Sources: date

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
Robert Looper III October 7, 2024 2 Mins Read
value seen: October 7, 2024
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: quote

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
“We are incredibly honored to receive this global recognition for Alcove. This award is a testament to the hard work and dedication of everyone involved in the project, from conception to completion.”
value seen: We are incredibly honored to receive this global recognition for Alcove. This award is a testament to the hard work and dedication of everyone involved in the project, from conception to completion.
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: role type

SOCIAL2026-09-18

Tony Giarratana

LinkedIn
Owner, developer, manager, sales, and leasing of high-rise apartments and condominiums in Nashville’s urban core.
value seen: President; owner and developer
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://linkedin.com/in/tony-giarratana-4b99bb103

Sources: since

SOCIAL2026-09-18

Tony Giarratana

LinkedIn
Jan 1986 - Present (40 years and 8 months) in Nashville, Tennessee, United States
value seen: Jan 1986
https://linkedin.com/in/tony-giarratana-4b99bb103

Sources: summary

SOCIAL2026-09-18

Tony Giarratana

LinkedIn
Owner, developer, manager, sales, and leasing of high-rise apartments and condominiums in Nashville’s urban core.
value seen: Tony Giarratana is Giarratana’s President, owner and developer, with responsibility spanning the company’s high-rise apartment and condominium development, management, sales and leasing.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://linkedin.com/in/tony-giarratana-4b99bb103

Sources: tags

OTHER2024-09-30

Tony Giarratana, President GIARRATANA LLC

Urban Land Institute · carried by ulidigitalmarketing.blob.core.windows.net
Tony Giarratana has been a real estate entrepreneur and developer in downtown Nashville for 39 years.
value seen: real estate entrepreneur and developer in downtown Nashville for 39 years
value paraphrased from this source
https://ulidigitalmarketing.blob.core.windows.net/ulidcnc/sites/5/2024/09/Tony-Giarratana-Bio.pdf

Sources: title

OTHER2024-09-30

Tony Giarratana, President GIARRATANA LLC

Urban Land Institute · carried by ulidigitalmarketing.blob.core.windows.net
Tony Giarratana, President GIARRATANA LLC
value seen: President
https://ulidigitalmarketing.blob.core.windows.net/ulidcnc/sites/5/2024/09/Tony-Giarratana-Bio.pdf
MS
Morgan Stengel
Morgan Stengel is Giarratana’s Executive Vice President and a senior development executive involved in delivering the company’s major urban projects, including Paramount. Before returning to Giarratana’s senior leadership, she worked in development, investment analysis and real-estate research, including at Wood Partners, MESA Capital Partners and JLL.
Current title
Executive Vice President; Vice President of Development
since Apr 2021
Experience
20+ years experience
Companies before
Wood PartnersMESA Capital PartnersJLLCassidy Turley / CarterFifth Street Management Company, LLCPUMA North America
Education
University of North Carolina at Chapel Hill, Kenan-Flagler Business SchoolBachelor of Science (BS), Business Administration
Other boards
none sourced
Known for
Executive Vice PresidentHead of developmentParamountex-Wood PartnersUNC Kenan-Flagler
https://linkedin.com/in/morgan-stengel-5941948
Alcove is more than just a building. It’s a reflection of Nashville’s future—a bold, sustainable vision that pushes the boundaries of what’s possible in high-rise living. City Now Next October 7, 2024https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: degree

SOCIAL2026-10-04

Morgan Stengel

LinkedIn
### Bachelor of Science (BS), Business Administration at [UNC Kenan-Flagler Business School]
value seen: Bachelor of Science (BS), Business Administration
https://linkedin.com/in/morgan-stengel-5941948

Sources: institution

SOCIAL2026-10-04

Morgan Stengel

LinkedIn
Bachelor of Science (BS), Business Administration at UNC Kenan-Flagler Business School
value seen: University of North Carolina at Chapel Hill, Kenan-Flagler Business School
held out of the figures · the quote does not carry this value
https://linkedin.com/in/morgan-stengel-5941948

Sources: full name

SOCIAL2026-10-04

Morgan Stengel

LinkedIn
# Morgan Stengel
value seen: Morgan Stengel
https://linkedin.com/in/morgan-stengel-5941948

Sources: linkedin page

SOCIAL2026-10-04

Morgan Stengel

LinkedIn
# Morgan Stengel
value seen: https://linkedin.com/in/morgan-stengel-5941948
https://linkedin.com/in/morgan-stengel-5941948

Sources: previous companies

SOCIAL2026-10-04

Morgan Stengel

LinkedIn
### Vice President, Development - [Wood Partners] ... ### Investment Analyst - MESA Capital Partners ... ### Analyst - [JLL] ... ### Financial Analyst, Investment Sales - Cassidy Turley / Carter ... ### Tenant Services Coordinator - [Fifth Street Management Company, LLC] ... ### Sales and Marketing Ambassador - PUMA North America
value seen: Wood Partners; MESA Capital Partners; JLL; Cassidy Turley / Carter; Fifth Street Management Company, LLC; PUMA North America
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://linkedin.com/in/morgan-stengel-5941948

Sources: date

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
Robert Looper III October 7, 2024 2 Mins Read
value seen: October 7, 2024
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: quote

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
“Alcove is more than just a building. It’s a reflection of Nashville’s future—a bold, sustainable vision that pushes the boundaries of what’s possible in high-rise living.”
value seen: Alcove is more than just a building. It’s a reflection of Nashville’s future—a bold, sustainable vision that pushes the boundaries of what’s possible in high-rise living.
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: since

SOCIAL2026-10-04

Morgan Stengel

LinkedIn
Apr 2021 - Present (5 years and 6 months) in Nashville, Tennessee, United States
value seen: Apr 2021
https://linkedin.com/in/morgan-stengel-5941948

Sources: summary

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
On hand to receive the award were Developer Tony Giarratana, Giarratana Development Director Ted Kromer, Executive Vice President of Development Morgan Stengel, and Alcove architect Vladimir Andrejevic of Goettsch Partners.
value seen: Morgan Stengel is Giarratana’s Executive Vice President and a senior development executive involved in delivering the company’s major urban projects, including Paramount.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: tags

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
Morgan Stengel, Executive Vice President of Development, Giarratana
value seen: Executive Vice President of Development
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: title

SOCIAL2026-10-04

Morgan Stengel

LinkedIn
Executive Vice President at Giarratana, LLC
value seen: Executive Vice President
https://linkedin.com/in/morgan-stengel-5941948
PM
Phil Meadows
Phil Meadows is identified as Giarratana Development’s CFO and the company’s finance lead. The available professional profile also records his education at Freed-Hardeman University; no independently documented prior-company history or start date was found in the retrieved material.
Current title
Chief Financial Officer
Experience
no career length stated
Companies before
none sourced
Education
Freed-Hardeman University
Other boards
none sourced
Known for
CFOFinance & accountingFreed-Hardeman University
https://linkedin.com/in/phil-meadows-77b0998

Sources: institution

SOCIAL2026-09-07

Phil Meadows

LinkedIn
### [Freed-Hardeman University]
value seen: Freed-Hardeman University
https://linkedin.com/in/phil-meadows-77b0998

Sources: full name

DIRECTORYdate not shown in source

Giarratana Development, LLC | BBB Business Profile

Better Business Bureau
Business Management: Mr. Phil Meadows, CFO
value seen: Phil Meadows
https://www.bbb.org/us/tn/nashville/profile/real-estate-development/giarratana-development-llc-0573-15103552

Sources: linkedin page

SOCIAL2026-09-07

Phil Meadows

LinkedIn
# Phil Meadows
value seen: https://linkedin.com/in/phil-meadows-77b0998
https://linkedin.com/in/phil-meadows-77b0998

Sources: summary

DIRECTORYdate not shown in source

Giarratana Development, LLC | BBB Business Profile

Better Business Bureau
Principal Contacts Mr. Phil Meadows, CFO Mr. Tony Giarratana, President
value seen: Phil Meadows is identified as Giarratana Development’s CFO
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.bbb.org/us/tn/nashville/profile/real-estate-development/giarratana-development-llc-0573-15103552

Sources: tags

SOCIAL2026-09-07

Phil Meadows

LinkedIn
### [Freed-Hardeman University]
value seen: Freed-Hardeman University
https://linkedin.com/in/phil-meadows-77b0998
SOCIAL2026-09-07

Phil Meadows

LinkedIn
CFO at Giarratana Development
value seen: CFO
https://linkedin.com/in/phil-meadows-77b0998

Sources: title

DIRECTORYdate not shown in source

Giarratana Development, LLC | BBB Business Profile

Better Business Bureau
Business Management: Mr. Phil Meadows, CFO
value seen: CFO
https://www.bbb.org/us/tn/nashville/profile/real-estate-development/giarratana-development-llc-0573-15103552
TK
Ted Kromer
Ted Kromer is identified in independent coverage as Giarratana’s Development Director and was named alongside the company’s senior project leadership at the CTBUH award recognition for Alcove. The retrieved evidence establishes his Giarratana role but does not provide a sufficiently reliable current start date, education record or prior-company sequence for this report.
Current title
Development Director
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
Development DirectorAlcoveTall-building development
https://www.linkedin.com/in/ted-kromer-3a0938373

Sources: full name

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
Giarratana Development Director Ted Kromer
value seen: Ted Kromer
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: linkedin page

SOCIALdate not shown in source

ted kromer - Director of Development at Giarratana

LinkedIn
Director of Development at Giarratana
value seen: https://www.linkedin.com/in/ted-kromer-3a0938373
https://www.linkedin.com/in/ted-kromer-3a0938373

Sources: summary

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
On hand to receive the award were Developer Tony Giarratana, Giarratana Development Director Ted Kromer, Executive Vice President of Development Morgan Stengel, and Alcove architect Vladimir Andrejevic of Goettsch Partners.
value seen: Ted Kromer is identified in independent coverage as Giarratana’s Development Director
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: tags

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
Giarratana Development Director Ted Kromer
value seen: Giarratana Development Director Ted Kromer
value paraphrased from this source
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/

Sources: title

PRESS2024-10-07

Giarratana Tower Brings International Tall Building Award To Nashville.

City Now Next
Giarratana Development Director Ted Kromer
value seen: Development Director
https://citynownext.com/2024/10/07/giarratana-tower-brings-international-tall-building-award-to-nashville/
SR
Scott Reynolds
Scott Reynolds is documented in a professional profile as Development Director at Giarratana Development, placing him in the company’s project-development leadership group. The retrieved material confirms the company association and title but does not support a dependable biography, start date, education, board-seat or prior-company claim.
Current title
Development Director
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
Development Director
https://www.linkedin.com/in/scott-reynolds-281a43b

Sources: full name

SOCIALdate not shown in source

Scott Reynolds - Giarratana Development, LLC

LinkedIn
Scott Reynolds - Giarratana Development, LLC
value seen: Scott Reynolds
https://www.linkedin.com/in/scott-reynolds-281a43b

Sources: linkedin page

SOCIALdate not shown in source

Scott Reynolds - Giarratana Development, LLC

LinkedIn
Development Director at Giarratana Development, LLC
value seen: https://www.linkedin.com/in/scott-reynolds-281a43b
value paraphrased from this source
https://www.linkedin.com/in/scott-reynolds-281a43b

Sources: summary

SOCIALdate not shown in source

Scott Reynolds - Giarratana Development, LLC

LinkedIn
Development Director at Giarratana Development, LLC
value seen: Scott Reynolds is documented in a professional profile as Development Director at Giarratana Development
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://www.linkedin.com/in/scott-reynolds-281a43b

Sources: tags

SOCIALdate not shown in source

Scott Reynolds - Giarratana Development, LLC

LinkedIn
Development Director at Giarratana Development, LLC
value seen: Development Director
https://www.linkedin.com/in/scott-reynolds-281a43b

Sources: title

SOCIALdate not shown in source

Scott Reynolds - Giarratana Development, LLC

LinkedIn
Development Director at Giarratana Development, LLC
value seen: Development Director
https://www.linkedin.com/in/scott-reynolds-281a43b
KG
Kate Giarratana
Kate Giarratana is a sales leader for Paramount and a REALTOR® marketing Nashville luxury homes and condominiums. Her professional profile identifies current Giarratana sales work, while her public business site describes her Nashville market knowledge and exposure to high-rise residential development through her father, Tony Giarratana.
Current title
Sales Director at Paramount; REALTOR®
since Aug 2024
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
Sales DirectorParamountREALTOR®Luxury condominiumsNashville market
Work email: kate@giarratana.com1 Email
https://linkedin.com/in/kate-giarratana-51462023b

Sources: email

OTHERdate not shown in source

Kate Giarratana

Kate Giarratana
Email kate@giarratana.com
value seen: kate@giarratana.com
https://kategiarratana.com/

Sources: full name

OTHERdate not shown in source

Kate Giarratana

Kate Giarratana
# Kate Giarratana
value seen: Kate Giarratana
https://kategiarratana.com/

Sources: linkedin page

SOCIAL2026-10-06

Kate Giarratana

LinkedIn
# Kate Giarratana Sales Director at Paramount
value seen: https://linkedin.com/in/kate-giarratana-51462023b
https://linkedin.com/in/kate-giarratana-51462023b

Sources: role type

SOCIAL2026-10-06

Kate Giarratana

LinkedIn
# Kate Giarratana Sales Director at Paramount
value seen: Sales Director at Paramount
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://linkedin.com/in/kate-giarratana-51462023b

Sources: since

SOCIAL2026-10-06

Kate Giarratana

LinkedIn
Sales - Giarratana (Current) Aug 2024 - Present
value seen: Aug 2024
https://linkedin.com/in/kate-giarratana-51462023b

Sources: summary

OTHERdate not shown in source

Kate Giarratana

Kate Giarratana
Whether you're buying, selling, or investing in Nashville real estate, Kate Giarratana brings professionalism and expertise to every transaction.
value seen: Kate Giarratana is a sales leader for Paramount and a REALTOR® marketing Nashville luxury homes and condominiums.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kategiarratana.com/

Sources: tags

OTHERdate not shown in source

Kate Giarratana

Kate Giarratana
Giarratana Development proudly introduces Paramount.
value seen: Paramount
value paraphrased from this source
https://kategiarratana.com/
OTHERdate not shown in source

Kate Giarratana

Kate Giarratana
Kate Giarratana REALTOR®
value seen: REALTOR®
https://kategiarratana.com/
OTHERdate not shown in source

Kate Giarratana

Kate Giarratana
Kate Giarratana is a Nashville native with a passion for connecting people with their perfect homes.
value seen: Nashville market
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kategiarratana.com/

Sources: title

OTHERdate not shown in source

Kate Giarratana

Kate Giarratana
Kate Giarratana REALTOR®
value seen: REALTOR®
https://kategiarratana.com/

Projects

Assessment coverage

Completed projects: 2016-10-15 through 2026-10-15. Initial research is capped at 10 completed projects and a separate delivery-risk search capped at 7 findings. Risk findings are not project assessment counts. Absence is not proof of a complete portfolio or no failures. Month-level dates overlapping a boundary are excluded from figures.

0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.

Stalled, cancelled & overdue projects

0 evidenced cases
The capped delivery-risk search ran; no project-level exception cases are recorded here. Risk findings are listed under Risks and are separate from assessed projects. This does not establish that the developer has no delivery failures.

Completed projects

7 projects
ProjectLocationTypeUnitsFloorsAreaCostPayment planLaunchedConstruction startOriginal targetHandoverDelayConfidenceStatus
Downtown YMCA redevelopmentNashville, United States
other—————2023January 2023—Sep 2025—not scorablecompleted
PrimeNashville, United States
residential for rent, retail350139—————Jun 2024 – Aug 2024Jan 2024 – Dec 2024−0.5 mo
(−7.0 to +6.0)
sourcedcompleted
AlcoveNashville, United States
residential for rent356134—————Jan 2022 – Dec 2022Mar 2023+8.5 mo
(+3.0 to +14.0)
estimatedcompleted
Pearl FlatsNashville, United States
North Nashville
residential for rent10713—————Sep 2021 – Dec 2021Dec 2021+1.5 mo
(0.0 to +3.0)
sourcedcompleted
Elliston Place Soda Shop relocation and renovationNashville, United States
retail—————2020January 23, 2020Jun 2020 – Aug 2020May 2021+10.0 mo
(+9.0 to +11.0)
sourcedcompleted
505Nashville, United States
residential for rent, residential for sale527145———2015December 2015Jan 2018Jan 2018 – Apr 2018+1.5 mo
(0.0 to +3.0)
sourcedcompleted
The PearlNashville, United States
residential for rent501——————Nov 2017Jan 2017 – Dec 2017−4.5 mo
(−10.0 to +1.0)
sourcedcompleted
Click any row for the sources behind it. Cost basis matters: an estimated cost, a construction loan and a sale price are different numbers. Each row states which one it is, so they are never averaged together.

Awards

Awards & recognition

4 found
PROJECT AWARD Winner 2024 (reported October 1, 2024)
CTBUH Award of Excellence for Best Tall Building (100–199 meters) · Alcove
Alcove, developed by Giarratana, won the CTBUH Award of Excellence in the Best Tall Building (100–199 meters) category; the Nashville Post reported it as an international award and the first such honor for a Nashville building.
PROJECT AWARD Winner 2024 (page published November 15, 2024)
American Architecture Award · Alcove Residential Tower
The Chicago Athenaeum listed Alcove Residential Tower among its 2024 American Architecture Award projects and identified Giarratana LLC as the client.
PROJECT AWARD Winner 2024
Excellence in Development Award · Alcove
ULI Nashville listed Alcove as a winner of its 2024 Excellence in Development Awards, which recognize development projects for design, land use, financial success and community impact; Giarratana identifies itself as Alcove’s developer.
COMPANY AWARD Winner 2019 (reported March 8, 2019)
Multi-Family Development of the Year
The Nashville Post reported that Giarratana LLC captured NAIOP Nashville’s Multi-Family Development of the Year award at the chapter’s annual awards ceremony.

Risks

Risk flags

7 found
DELIVERY DELAY June 6, 2025; updated August 11, 2025
As reported on June 6, 2025, Giarratana terminated the previously arranged $232 million construction loans for the proposed Paramount tower, leaving the project without construction financing; in August 2025, it was still seeking to close a replacement $360 million loan after an expected July closing did not occur. Giarratana said new financing was being pursued, so this documents delay and financing uncertainty rather than cancellation or completed abandonment.
FINANCIAL DISTRESS July 13, 2009 (reporting on defaults beginning in 2008 and 2009)
A July 2009 report documented that the project entity Signature Holdings, owned by Giarratana, had a development loan for the proposed Signature Tower in default for nonpayment, including an unpaid scheduled $1.4 million payment, and that the project remained in pre-construction; the report also stated that no property had yet entered foreclosure. Giarratana disputed the characterization of its relationship with the lender and said it was negotiating an extension and continuing to service the debt.
DELIVERY DELAY 6 June 2025; financing resolution reported 19 August 2025
Paramount — Giarratana had terminated the project’s prior $232 million construction-loan package, leaving the 60-story tower without construction financing in June 2025; this was subsequently resolved when Giarratana closed a $340 million loan in August 2025 and reported full-scale work expected to begin September 15, 2025.
DELIVERY DELAY 19 August 2026
Rock Block Flats — Giarratana Development halted work after the project’s announcement, producing a yearslong delay; in August 2026 the developer said it planned to break ground by year-end, so the retrieved evidence supports delayed delivery and a proposed restart, not abandonment.
PROJECT CANCELLED 26 March 2019
Church Street Park tower land-swap proposal — a proposal led by Tony Giarratana to obtain the park for a tower did not go through; by March 2019 the mayor was considering alternatives and Metro was moving toward a request-for-proposals process instead.
PROJECT CANCELLED Loan default reported 13 July 2009; unsuccessful outcome described 18 November 2011
Signature Tower — Giarratana Development’s proposed tower was never built after repeated financing problems; contemporary reporting documented at least two loan defaults and an unresolved maturity, while a later account described the developer’s unsuccessful pursuit and the partners’ substantial loss.
PROJECT CANCELLED 25 November 2009
May Town Center — Giarratana was no longer the master developer after Metro Planning Commission rejection, and he withdrew his effort to obtain reconsideration; the landowner ended the developer relationship because there was no project timeline.

Record status

active
Coverageactive
Tracked sinceOctober 10, 2026
Last checkedOctober 11, 2026 this month
Profile last researchedOctober 11, 2026
Claim
Work for this company? Claiming lets you correct the record with sources and get alerts when it changes.
For informational purposes only. This information is not investment, financial or credit advice and should not be relied on for investment, lending or credit decisions. Records may be incomplete or outdated. Verify information independently and seek qualified advice before making a decision.