KDCDallas, United States · founded Founded in 1990 · 1 active markets
PRIVATE

KDC develops commercial office buildings, corporate build-to-suit facilities, data centers, industrial projects, and mixed-use environments across the United States. Its clients are corporations and institutions seeking headquarters, campuses, regional facilities, and mission-critical workplaces, delivered through development, acquisition, and land partnerships.

Years in business
36
founded Founded in 1990
LinkedIn headcount
79
employees, as shown on LinkedIn · size band 51–200
Portfolio value
USD 14 billion
For more than 35 years
Total projects
more than 150
across the company’s whole history
Projects last researched October 15, 2026
Every figure on this card was read out of a document.

Overview

Investor tear sheet

a summary of the tabs that follow · no rating of our own

Company dossier

Legal name
KDC, LLC1
Headquarters
2525 Knight Street, Suite 3001, Dallas1, United States
Founded
Founded in 19901
Entity type
PRIVATE1
Business model
commercial1, mixed use1, masterplan1
Markets
1 market listed
What they build
Office (5 of 8) · Industrial (4 of 8) · Other (1 of 8)
Full dossier in About →

Delivery record

4 date-assessed of 8 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
8
within the rolling ten-year window
Median delay
+3.8 mo
the middle of 4 scored projects
Average delay
+3.8 mo
the same projects, pulled by the worst
Average time to deliver
2.3 yrs
start to completion, over 4 delivered projects
Worst slip
+8.0 mo
Raytheon Advanced Integration and Manufacturing Center · +1.0 to +15.0
2
early or less than 6 months late
6 to 12 months late
2
yellow rows below
Over 12 months late
0
red rows below

Against other developers

4 date-assessed here · 249 developers, 929 date-assessed projects in United States
Median delay
KDC·249 developers in United States
+3.8 mo vs +4.5 mo
this developer 0.7 mo better
The typical project on each side.
Average delay
KDC·249 developers in United States
+3.8 mo vs +7.5 mo
this developer 3.7 mo better
Both pulled by their worst few.
On time
KDC·249 developers in United States
50% vs 55%
this developer 5 pts worse
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Average time to deliver
KDC·249 developers in United States
2.3 yrs vs 2.9 yrs
this developer 0.6 yrs faster
Start to completion, over 4 delivered here and 768 in the market.
Projects and timelines in Track Record →

Resident experience

4 of 8 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
8.3/ 10
Weighted judgment across build and operations · from 4 of 4 rated buildings
Little structure evidence (0 of 4 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
—/ 10
Fabric, services, waterproofing, envelope · from 0 of 4 rated buildings
Management & living
8.2/ 10
Upkeep, response times, amenities, community · from 4 of 4 rated buildings

Against other developers

4 rated here · 269 developers, 1381 rated buildings in United States
Overall rating
KDC · 269 other developers in United States
8.3 vs 7.7
this developer 0.6 better
The weighted verdict on each side. From 4 of 4 rated buildings here and 1381 in the market.
Structure & systems
KDC · 269 other developers in United States
— vs 6.9
Too few buildings with this score here to compare (0 of 4)
Fabric and engineering only — fixed at handover. From 0 of 4 rated buildings here and 585 in the market.
Management & living
KDC · 269 other developers in United States
8.2 vs 7.4
this developer 0.8 better
Upkeep and response — belongs to whoever runs the building now. From 4 of 4 rated buildings here and 1326 in the market.
The market here is United States: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.
Ratings by building →

Awards & recognition

All awards →

Risks & source coverage

  • PROJECT CANCELLED Reported August 8, 2022; project commencement was in 2019. The KDC-promoted Valley View mixed-use redevelopment in Dallas never got off the ground after a 2019 commencement ceremony; by August 2022, Seritage was seeking to sell the land and reported that KDC was no longer involved.
  • DELIVERY DELAY Redesign reported January 19, 2021; KDC’s disassociation and continued lack of development reported May 7, 2024. The KDC-planned Uptown Dallas Central Market mixed-use project was substantially redesigned in 2021 after its office tower and hotel were eliminated, and by May 2024 the site remained undeveloped with KDC saying it was no longer affiliated; the originally announced high-rise project was replaced by a possible standalone grocery store, so the original completion commitment was not achieved.
  • FINANCIAL DISTRESS November 10, 1992. The predecessor Koll Co., which KDC’s own history identifies as becoming KDC, faced foreclosure proceedings in 1992 after Wells Fargo said a $51 million construction loan was past due; the report described the matter as involving a Koll joint venture and noted that Koll’s liability was limited under a non-recourse arrangement.
  • 3 more in Risk & Sources
Record status
active
Company sources
131 source entries across 125 fields
Projects tracked
8 · 8 completed in assessment
All flags and sources →

Track Record

Delivery record

4 date-assessed of 8 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
8
within the rolling ten-year window
Median delay
+3.8 mo
the middle of 4 scored projects
Average delay
+3.8 mo
the same projects, pulled by the worst
Average time to deliver
2.3 yrs
start to completion, over 4 delivered projects
Worst slip
+8.0 mo
Raytheon Advanced Integration and Manufacturing Center · +1.0 to +15.0
2
early or less than 6 months late
6 to 12 months late
2
yellow rows below
Over 12 months late
0
red rows below

Against other developers

4 date-assessed here · 249 developers, 929 date-assessed projects in United States
Median delay
KDC·249 developers in United States
+3.8 mo vs +4.5 mo
this developer 0.7 mo better
The typical project on each side.
Average delay
KDC·249 developers in United States
+3.8 mo vs +7.5 mo
this developer 3.7 mo better
Both pulled by their worst few.
On time
KDC·249 developers in United States
50% vs 55%
this developer 5 pts worse
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Average time to deliver
KDC·249 developers in United States
2.3 yrs vs 2.9 yrs
this developer 0.6 yrs faster
Start to completion, over 4 delivered here and 768 in the market.
The market here is United States: every other developer whose head office is in the same country, because planning regimes and reporting norms move together within one. It is not a city, a sector or a size band. Read the two delay figures together. A median close to the market with a much better average means no single disaster; the reverse means one project is carrying the record. Time to deliver runs from the earliest start we hold to the completion itself — a construction start where a source gave one, otherwise a sales launch, otherwise the launch year read as its January. A handover the sources place only inside a year is read as that December, so a duration is the widest the record allows rather than the flattering end of it. Only delivered projects dated at both ends count, so it is taken over fewer projects than the delay figures, and a long build is not a fault: a tower is not a villa run. Sourced figures only, both sides, and values taken from documents held on file are excluded here — a developer who shares their records should not score better than one who does not.

Construction start to handover

8 of 8 projects dated · 5 places
Based on covered projects with documented construction or launch dates and available handover dates. Timelines vary by project and may not represent the developer’s full portfolio.
Construction start, or the launchTarget completion (window)Completion or handover, as reportedCurrently statedLaunch year only, no date publishedEarly or ≤6 mo lateOver 6–12 mo lateOver 12 mo lateStalled
McKinney, United States
Ruston, United States
Irving, United States
Midlothian, United States
Freeport, United States
201920202021202220232024202520262027todayMCKINNEY, UNITED STATESon timeestimated+7 moestimated+0.5 moestimated+8 moverifiedRUSTON, UNITED STATES−0.5 moestimatedIRVING, UNITED STATES−0.5 moverifiedMIDLOTHIAN, UNITED STATESon timeverifiedFREEPORT, UNITED STATES+7.5 moverified
Click a row in the chart to open a project, or a table row below to see its sources. The chart runs wider than the page where the record spans many years — scroll it sideways to follow a project to its handover. Every date we have is drawn. A hollow marker is only a launch year, not a date anyone published. No dates published means we looked and found none; dates not yet checked means we have not looked yet. Handing over is not finished — rows say which. A delay is shown when one source gives the promised date and another gives the real one, however rough: "2019" still counts, and the row shows how wide that is. Projects missing one of the two dates, or with sources that disagree, are left out of the figures.

Building & Livability Ratings

Resident experience

4 of 8 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
8.3/ 10
Weighted judgment across build and operations · from 4 of 4 rated buildings
Little structure evidence (0 of 4 buildings) — this rests mainly on whole-building and living reviews.
Structure & systems
—/ 10
Fabric, services, waterproofing, envelope · from 0 of 4 rated buildings
Management & living
8.2/ 10
Upkeep, response times, amenities, community · from 4 of 4 rated buildings

Against other developers

4 rated here · 269 developers, 1381 rated buildings in United States
Overall rating
KDC · 269 other developers in United States
8.3 vs 7.7
this developer 0.6 better
The weighted verdict on each side. From 4 of 4 rated buildings here and 1381 in the market.
Structure & systems
KDC · 269 other developers in United States
— vs 6.9
Too few buildings with this score here to compare (0 of 4)
Fabric and engineering only — fixed at handover. From 0 of 4 rated buildings here and 585 in the market.
Management & living
KDC · 269 other developers in United States
8.2 vs 7.4
this developer 0.8 better
Upkeep and response — belongs to whoever runs the building now. From 4 of 4 rated buildings here and 1326 in the market.
The market here is United States: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.

By building

4 rated · 4 not rated · scale 1–10
ProjectOverallStructure & systemsManagement & living
Hugs Café Inc. Headquarters and Home for Hugs Training AcademyDowntown McKinney, McKinney
10.0/ 10
—/ 10
10.0/ 10

Google's 4.9/5 from 598 reviews is the largest review base and converts to 9.7/10 under the stated curve. Tripadvisor is somewhat lower but not materially divergent under the disagreement rule, while repeated operational praise raises the result to the 10.0 ceiling. The published material reviewed concerns the café and visitor experience at 221 Andrews St.; no published evidence about structural systems, plumbing, HVAC or similar physical performance was found.

+ Friendly staff+ Welcoming atmosphere+ Clean interior
− Isolated food-taste complaint− Isolated ordering/seating complaint

no notes returned

no links returned

Reviews for the café operating inside the new headquarters emphasize hospitable day-to-day service: one guest said staff were “lovely, kind and thoughtful,” while another praised staff who greeted them by name and asked when they would return. Review summaries also describe the interior as clean and the atmosphere as welcoming; the limited negative material consists of isolated complaints about particular food items and the ordering/seating process.

Volkswagen Group of America Port Freeport FacilityFreeport
8.9/ 10
—/ 10
8.9/ 10

The building-specific Google aggregate of 4.6/5 from 13 reviews sets the level, converting to 8.8/10 under the supplied curve. A small positive adjustment reflects repeated praise for professional/helpful staff, while the 3/5 convenience criticism is isolated and no structural condition evidence was published.

+ Professional staff+ Helpful staff
− No overnight parking− Limited nearby truck-stop access

no notes returned

no links returned

The available operational feedback is mostly favorable: one reviewer called it “The best VW port of America,” another said staff were “very professional and ready to help,” and another described a staff member helping repair a bumper. Operational caveats include closing at 4:00 p.m. with “no overnight parking” and a review noting that “The closest truck stop is about 30 miles away.”

Raytheon McKinney Phase IIMcKinney
8.8/ 10
—/ 10
8.8/ 10

The 4.5/5 Google aggregate based on 218 reviews sets the level and converts to 8.5/10 under the specified curve. The sampled written comments include repeated favorable impressions of the facility and people, supporting a modest upward adjustment, while the structural score remains unevidenced because the published material does not provide resident-facing infrastructure reviews.

+ Positive staff interactions+ Well-regarded facility+ Family-day and visitor amenities

no notes returned

no links returned

The sampled location reviews describe a favorable day-to-day impression: one reviewer called it a "Beautiful facility. Nice folks," and another praised the "fabulous tour" and food trucks at an employee family day. The main negative operational comment was that the site had "declined greatly" and was "not managing our defense budget tax dollars well at all," but this was a single review rather than a recurring complaint.

Oncor Midlothian Distribution CenterRailport Business Park, Midlothian
5.7/ 10
—/ 10
4.9/ 10

The Google Reviews/Maps aggregate of 3.3/5 from 14 reviews sets the level; under the requested conversion curve this is approximately 4.9/10. The displayed reviews provide mixed operational evidence, with repeated praise for unloading speed and guards offset by repeated service-delay complaints, while no published structural-condition feedback was found.

+ Fast unloading+ Generally courteous guards
− Slow unloading− Service delays− Unpleasant security-guard interaction− Parking constraints

no notes returned

no links returned

Operational feedback is mixed. Reviewers wrote “fast at unloading” and “The guards are very nice,” but others reported “Bad service,” a guard with “a very bad attitude,” and waiting about three hours while only six rolls were unloaded.

Only buildings that have reached handover are rated. 4 of 8 projects carry no rating: a building still under construction is never asked about, one that has just been handed over may not have been reached yet, and the rest were asked about and no published resident commentary was found. Structure is fixed at handover and stays the developer's; management and living belongs to whoever runs the building now. The overall verdict weights both rather than averaging them. None of this is checked: a rating is what people published about a building, aggregated — it is not evidence, it cannot move a delay figure, and it is not part of the delivery record above.

About

Company dossier

Legal name
KDC, LLC
Headquarters
2525 Knight Street, Suite 300, Dallas, United States
75219
Founded
Founded in 1990
Entity type
PRIVATE
Revenue
USD 32.47 million annual revenue
Business model
commercial, mixed use, masterplan

Offices

head office and 2 others
DunwoodyCharlotte

Sources: office cities

COMPANY2026-02-09

KDC Expands Data Center Development Platform, Welcomes Industry…

KDC
offices in Dunwoody, Georgia, and Charlotte, North Carolina.
value seen: Dunwoody
https://kdc.com/news/kdc-expands-data-center-development-platform-welcomes-industry-veteran-robert-child-as-executive-vice-president

Sources: office cities

COMPANY2026-02-09

KDC Expands Data Center Development Platform, Welcomes Industry…

KDC
offices in Dunwoody, Georgia, and Charlotte, North Carolina.
value seen: Charlotte
https://kdc.com/news/kdc-expands-data-center-development-platform-welcomes-industry-veteran-robert-child-as-executive-vice-president

Partners

7 partners
Cadillac Fairview
joint venture

Cadillac Fairview acquired a 50% interest in KDC alongside management and Compatriot Capital.

Compatriot Capital
joint venture

Compatriot Capital is KDC’s long-standing partner in the joint venture with Cadillac Fairview.

University of Dallas
joint venture

KDC and the University of Dallas partnered on the development of a data center campus.

Research Triangle Foundation of North Carolina
joint venture

KDC partnered with the foundation to build 1 million square feet of office space at Park Center East/Hub RTP.

L. C. Fulenwider, Inc.
landowner

KDC and the master-land developer announced new build-to-suit sites at mixed-use Peña Station.

Digital Realty Trust
joint venture

KDC partnered with Digital Realty Trust on multiple data center projects in the United States.

State Farm
joint venture

KDC partnered with State Farm on multiple data center projects in the United States.

Sources: name

COMPANY2021-07-13

KDC partnership or company announcement

KDC
Cadillac Fairview has acquired a 50% interest in KDC alongside management and its long standing partner, Compatriot Capital.
value seen: Cadillac Fairview
value paraphrased from this source
https://kdc.com/news/kdc-cadillac-fairview-and-compatriot-capital-form-joint-venture
COMPANY2021-07-13

KDC partnership or company announcement

KDC
Cadillac Fairview has acquired a 50% interest in KDC alongside management and its long standing partner, Compatriot Capital.
value seen: Cadillac Fairview
value paraphrased from this source
https://kdc.com/news/kdc-cadillac-fairview-and-compatriot-capital-form-joint-venture

Sources: summary

COMPANY2021-07-13

KDC partnership or company announcement

KDC
Cadillac Fairview has acquired a 50% interest in KDC alongside management and its long standing partner, Compatriot Capital.
value seen: Cadillac Fairview acquired a 50% interest in KDC alongside management and Compatriot Capital.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/news/kdc-cadillac-fairview-and-compatriot-capital-form-joint-venture

Sources: name

COMPANY2021-07-13

KDC partnership or company announcement

KDC
Cadillac Fairview has acquired a 50% interest in KDC alongside management and its long standing partner, Compatriot Capital.
value seen: Compatriot Capital
value paraphrased from this source
https://kdc.com/news/kdc-cadillac-fairview-and-compatriot-capital-form-joint-venture
COMPANY2021-07-13

KDC partnership or company announcement

KDC
Cadillac Fairview has acquired a 50% interest in KDC alongside management and its long standing partner, Compatriot Capital.
value seen: Compatriot Capital
value paraphrased from this source
https://kdc.com/news/kdc-cadillac-fairview-and-compatriot-capital-form-joint-venture

Sources: summary

COMPANY2021-07-13

KDC partnership or company announcement

KDC
Cadillac Fairview has acquired a 50% interest in KDC alongside management and its long standing partner, Compatriot Capital.
value seen: Compatriot Capital is KDC’s long-standing partner in the joint venture with Cadillac Fairview.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/news/kdc-cadillac-fairview-and-compatriot-capital-form-joint-venture

Sources: name

COMPANY2024-07-15

KDC partnership or company announcement

KDC
Developer KDC and the University of Dallas (UD) received approval tonight from the Irving City Council on an application to rezone land near its main campus and pave the way for KDC and UD to partner in the development of a much-anticipated data center campus.
value seen: University of Dallas
value paraphrased from this source
https://kdc.com/news/university-of-dallas-receives-approval-from-irving-city-council-on-rezoning-application
COMPANY2024-07-15

KDC partnership or company announcement

KDC
Developer KDC and the University of Dallas (UD) received approval tonight from the Irving City Council on an application to rezone land near its main campus and pave the way for KDC and UD to partner in the development of a much-anticipated data center campus.
value seen: University of Dallas
value paraphrased from this source
https://kdc.com/news/university-of-dallas-receives-approval-from-irving-city-council-on-rezoning-application

Sources: summary

COMPANY2024-07-15

KDC partnership or company announcement

KDC
Developer KDC and the University of Dallas (UD) received approval tonight from the Irving City Council on an application to rezone land near its main campus and pave the way for KDC and UD to partner in the development of a much-anticipated data center campus.
value seen: KDC and the University of Dallas partnered on the development of a data center campus.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/news/university-of-dallas-receives-approval-from-irving-city-council-on-rezoning-application

Sources: name

COMPANY2020-01-29

KDC partnership or company announcement

KDC
KDC, a leading developer of corporate build-to-suit campus projects for major companies such as JPMorgan Chase, State Farm and Toyota, announced today a development partnership with the Research Triangle Foundation of North Carolina, the not-for-profit organization that manages Research Triangle Park, to build 1 million square feet of office space as part of Park Center East, LLC.
value seen: Research Triangle Foundation of North Carolina
value paraphrased from this source
https://kdc.com/news/kdc-announces-development-partnership-with-research-triangle-foundation-for-1-million-square-feet-of-office-space
COMPANY2020-01-29

KDC partnership or company announcement

KDC
KDC, a leading developer of corporate build-to-suit campus projects for major companies such as JPMorgan Chase, State Farm and Toyota, announced today a development partnership with the Research Triangle Foundation of North Carolina, the not-for-profit organization that manages Research Triangle Park, to build 1 million square feet of office space as part of Park Center East, LLC.
value seen: Research Triangle Foundation of North Carolina
value paraphrased from this source
https://kdc.com/news/kdc-announces-development-partnership-with-research-triangle-foundation-for-1-million-square-feet-of-office-space

Sources: summary

COMPANY2020-01-29

KDC partnership or company announcement

KDC
KDC, a leading developer of corporate build-to-suit campus projects for major companies such as JPMorgan Chase, State Farm and Toyota, announced today a development partnership with the Research Triangle Foundation of North Carolina, the not-for-profit organization that manages Research Triangle Park, to build 1 million square feet of office space as part of Park Center East, LLC.
value seen: KDC partnered with the foundation to build 1 million square feet of office space at Park Center East/Hub RTP.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/news/kdc-announces-development-partnership-with-research-triangle-foundation-for-1-million-square-feet-of-office-space

Sources: name

COMPANY2025-07-17

KDC partnership or company announcement

KDC
KDC, one of the nation’s leading real estate development and investment firms, and master-land developer L.C. Fulenwider, Inc., announced the availability of new build-to-suit sites at the 490-acre, mixed-use Peña Station.
value seen: L. C. Fulenwider, Inc.
https://kdc.com/news/kdc-and-l-c-fulenwider-launch-next-phase-for-office-tech-development-at-the-490-acre-pe%C3%B1a-station
COMPANY2025-07-17

KDC partnership or company announcement

KDC
KDC, one of the nation’s leading real estate development and investment firms, and master-land developer L.C. Fulenwider, Inc., announced the availability of new build-to-suit sites at the 490-acre, mixed-use Peña Station.
value seen: L. C. Fulenwider, Inc.
https://kdc.com/news/kdc-and-l-c-fulenwider-launch-next-phase-for-office-tech-development-at-the-490-acre-pe%C3%B1a-station

Sources: summary

COMPANY2025-07-17

KDC partnership or company announcement

KDC
KDC, one of the nation’s leading real estate development and investment firms, and master-land developer L.C. Fulenwider, Inc., announced the availability of new build-to-suit sites at the 490-acre, mixed-use Peña Station.
value seen: KDC and the master-land developer announced new build-to-suit sites at mixed-use Peña Station.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/news/kdc-and-l-c-fulenwider-launch-next-phase-for-office-tech-development-at-the-490-acre-pe%C3%B1a-station

Sources: name

COMPANY2026-02-09

KDC partnership or company announcement

KDC
The firm has also partnered with Digital Realty Trust, State Farm, and others throughout the United States on developing multiple data center projects.
value seen: Digital Realty Trust
value paraphrased from this source
https://kdc.com/news/kdc-expands-data-center-development-platform-welcomes-industry-veteran-robert-child-as-executive-vice-president

Sources: summary

COMPANY2026-02-09

KDC partnership or company announcement

KDC
The firm has also partnered with Digital Realty Trust, State Farm, and others throughout the United States on developing multiple data center projects.
value seen: KDC partnered with Digital Realty Trust on multiple data center projects in the United States.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/news/kdc-expands-data-center-development-platform-welcomes-industry-veteran-robert-child-as-executive-vice-president

Sources: name

COMPANY2026-02-09

KDC partnership or company announcement

KDC
The firm has also partnered with Digital Realty Trust, State Farm, and others throughout the United States on developing multiple data center projects.
value seen: State Farm
value paraphrased from this source
https://kdc.com/news/kdc-expands-data-center-development-platform-welcomes-industry-veteran-robert-child-as-executive-vice-president

Sources: summary

COMPANY2026-02-09

KDC partnership or company announcement

KDC
The firm has also partnered with Digital Realty Trust, State Farm, and others throughout the United States on developing multiple data center projects.
value seen: KDC partnered with State Farm on multiple data center projects in the United States.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/news/kdc-expands-data-center-development-platform-welcomes-industry-veteran-robert-child-as-executive-vice-president

Registrations & licences

COMPANY NUMBER0802184819
Texas Department of State, Division of Corporations · · Active
Jurisdiction-agnostic: a DLD number, a Companies House number and a state RERA registration all land in the same table.

Contact

Markets

1 countries
United Statesactive 8 projects tracked

What they build

3 types
Office5 of 8
Industrial4 of 8
Other1 of 8
A project counts once under each type it carries, so the shares add to more than the project count.

Management

Principals & executives

6 names found
SV
Steve Van Amburgh
Steve Van Amburgh is KDC’s Executive Chairman and participates in its Executive Committee, board and long-term strategy. He joined predecessor The Koll Company in 1989, assumed leadership and ownership, and oversaw the company’s expansion into corporate build-to-suit, data-center and industrial work.
Current title
Executive Chairman
since 1989
Experience
no career length stated
Companies before
none sourced
Education
Washington and Lee UniversityBachelor of Science, Economics and Commerce
Other boards
Benchmark Bank board of directorsHighland Park Education Foundation board of directorsSalesmanship Club of Dallas board of directors
Known for
nothing tagged
We have always been lean. But we've also project-managed and construction-managed projects. The Fort Podcast 2024-08-20https://www.thefortpod.com/362-steve-van-amburgh-ceo-kdc-developing-the-best-corporate-build-to-suits-in-america/

Sources: degree

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
Van Amburgh earned his Bachelor of Science in Economics and Commerce from Washington and Lee University in Lexington, Virginia.
value seen: Bachelor of Science, Economics and Commerce
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/steve-van-amburgh

Sources: institution

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
Van Amburgh earned his Bachelor of Science in Economics and Commerce from Washington and Lee University in Lexington, Virginia.
value seen: Washington and Lee University
https://kdc.com/why-kdc/team/steve-van-amburgh

Sources: full name

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
KDC - Steve Van Amburgh
value seen: Steve Van Amburgh
https://kdc.com/why-kdc/team/steve-van-amburgh

Sources: other boards

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
He has served on Benchmark Bank’s board of directors for over 25 years.
value seen: Benchmark Bank board of directors
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/steve-van-amburgh

Sources: other boards

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
His community focus includes serving on the board of directors of the Highland Park Education Foundation, the Highland Park Presbyterian Church Foundation, and the Salesmanship Club of Dallas.
value seen: Highland Park Education Foundation board of directors
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/steve-van-amburgh

Sources: other boards

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
His community focus includes serving on the board of directors of the Highland Park Education Foundation, the Highland Park Presbyterian Church Foundation, and the Salesmanship Club of Dallas.
value seen: Salesmanship Club of Dallas board of directors
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/steve-van-amburgh

Sources: date

PRESS2024-08-20

#362 - Steve Van Amburgh - CEO @ KDC - Developing The BEST Corporate Build-To-Suits in America

The Fort Podcast · carried by thefortpod.com
PublishedDate: 2024-08-20
value seen: 2024-08-20
value paraphrased from this source
https://www.thefortpod.com/362-steve-van-amburgh-ceo-kdc-developing-the-best-corporate-build-to-suits-in-america/

Sources: publisher

PRESS2024-08-20

#362 - Steve Van Amburgh - CEO @ KDC - Developing The BEST Corporate Build-To-Suits in America

The Fort Podcast · carried by thefortpod.com
The Fort Podcast
value seen: The Fort Podcast
value paraphrased from this source
https://www.thefortpod.com/362-steve-van-amburgh-ceo-kdc-developing-the-best-corporate-build-to-suits-in-america/

Sources: quote

PRESS2024-08-20

#362 - Steve Van Amburgh - CEO @ KDC - Developing The BEST Corporate Build-To-Suits in America

The Fort Podcast · carried by thefortpod.com
We have always been lean. But we've also project-managed and construction-managed projects.
value seen: We have always been lean. But we've also project-managed and construction-managed projects.
https://www.thefortpod.com/362-steve-van-amburgh-ceo-kdc-developing-the-best-corporate-build-to-suits-in-america/

Sources: url

PRESS2024-08-20

#362 - Steve Van Amburgh - CEO @ KDC - Developing The BEST Corporate Build-To-Suits in America

The Fort Podcast · carried by thefortpod.com
https://www.thefortpod.com/362-steve-van-amburgh-ceo-kdc-developing-the-best-corporate-build-to-suits-in-america/
value seen: https://www.thefortpod.com/362-steve-van-amburgh-ceo-kdc-developing-the-best-corporate-build-to-suits-in-america/
value paraphrased from this source
https://www.thefortpod.com/362-steve-van-amburgh-ceo-kdc-developing-the-best-corporate-build-to-suits-in-america/

Sources: role type

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
Executive Chairman
value seen: Executive Chairman
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://kdc.com/why-kdc/team/steve-van-amburgh

Sources: since

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
Van Amburgh joined KDC’s predecessor, The Koll Company, in 1989, assuming leadership and ownership and rebranding the company to KDC in 2001.
value seen: 1989
https://kdc.com/why-kdc/team/steve-van-amburgh

Sources: summary

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
As Executive Chairman of KDC, Steve Van Amburgh is involved in the firm’s Executive Committee, Board of Directors, and in the long-term strategic planning.
value seen: Steve Van Amburgh is KDC’s Executive Chairman and participates in its Executive Committee, board and long-term strategy. He joined predecessor The Koll Company in 1989, assumed leadership and ownership, and oversaw the company’s expansion into corporate build-to-suit, data-center and industrial work.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/why-kdc/team/steve-van-amburgh

Sources: title

COMPANYdate not shown in source

KDC - Steve Van Amburgh

KDC
Executive Chairman
value seen: Executive Chairman
https://kdc.com/why-kdc/team/steve-van-amburgh
EH
Eric Hage
Eric Hage is KDC’s President and an Operating Committee member, responsible for corporate strategy, growth and investment initiatives, relationships and day-to-day operations. He joined KDC after 18 years in construction, including leading a Dallas office of a major national contractor, and has worked on major North Texas developments.
Current title
President / Operating Committee Member
since Sept. 5, 2024
Experience
no career length stated
Companies before
Structure Tone Southwest
Education
University of RichmondPolitical Science
Other boards
Mercy Street boardClayton Dabney Foundation board
Known for
nothing tagged
Work email: eric.hage@kdc.com1 Email
Because of AI and the growing demand for data center space from a lot of the big tech companies and others, the hyperscalers, the demand is off the charts for data center space right now. D Magazine September 26, 2024https://www.dmagazine.com/commercial-real-estate/2024/09/for-eric-hage-and-kdc-now-is-the-time-to-double-down/

Sources: degree

COMPANYdate not shown in source

KDC - Eric Hage

KDC
Born and raised in the Dallas area, Hage earned his undergraduate degree from the University of Richmond in Virginia.
value seen: Political Science
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/eric-hage

Sources: institution

COMPANYdate not shown in source

KDC - Eric Hage

KDC
Born and raised in the Dallas area, Hage earned his undergraduate degree from the University of Richmond in Virginia.
value seen: University of Richmond
https://kdc.com/why-kdc/team/eric-hage

Sources: email

COMPANYdate not shown in source

KDC - Eric Hage

KDC
- eric.hage@kdc.com
value seen: eric.hage@kdc.com
https://kdc.com/why-kdc/team/eric-hage

Sources: full name

COMPANYdate not shown in source

KDC - Eric Hage

KDC
KDC - Eric Hage
value seen: Eric Hage
https://kdc.com/why-kdc/team/eric-hage

Sources: other boards

COMPANYdate not shown in source

KDC - Eric Hage

KDC
Eric is a member of the Salesmanship Club of Dallas and serves on the boards of Mercy Street and the Clayton Dabney Foundation.
value seen: Mercy Street board
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/eric-hage

Sources: other boards

COMPANYdate not shown in source

KDC - Eric Hage

KDC
Eric is a member of the Salesmanship Club of Dallas and serves on the boards of Mercy Street and the Clayton Dabney Foundation.
value seen: Clayton Dabney Foundation board
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/eric-hage

Sources: previous companies

COMPANYdate not shown in source

KDC - Eric Hage

KDC
After leaving Structure Tone Southwest and a following three-and-a-half-year stint running his own construction company, Hage joined KDC in 2021 as an executive vice president of development.
value seen: Structure Tone Southwest
https://kdc.com/why-kdc/team/eric-hage

Sources: date

PRESS2024-09-26

For Eric Hage and KDC, Now is the Time to Double Down

D Magazine
By Audrey Henvey | September 26, 2024 | 1:29 pm
value seen: September 26, 2024
value paraphrased from this source
https://www.dmagazine.com/commercial-real-estate/2024/09/for-eric-hage-and-kdc-now-is-the-time-to-double-down/

Sources: publisher

PRESS2024-09-26

For Eric Hage and KDC, Now is the Time to Double Down

D Magazine
D Magazine
value seen: D Magazine
value paraphrased from this source
https://www.dmagazine.com/commercial-real-estate/2024/09/for-eric-hage-and-kdc-now-is-the-time-to-double-down/

Sources: quote

PRESS2024-09-26

For Eric Hage and KDC, Now is the Time to Double Down

D Magazine
Because of AI and the growing demand for data center space from a lot of the big tech companies and others, the hyperscalers, the demand is off the charts for data center space right now.
value seen: Because of AI and the growing demand for data center space from a lot of the big tech companies and others, the hyperscalers, the demand is off the charts for data center space right now.
https://www.dmagazine.com/commercial-real-estate/2024/09/for-eric-hage-and-kdc-now-is-the-time-to-double-down/

Sources: url

PRESS2024-09-26

For Eric Hage and KDC, Now is the Time to Double Down

D Magazine
https://www.dmagazine.com/commercial-real-estate/2024/09/for-eric-hage-and-kdc-now-is-the-time-to-double-down/
value seen: https://www.dmagazine.com/commercial-real-estate/2024/09/for-eric-hage-and-kdc-now-is-the-time-to-double-down/
value paraphrased from this source
https://www.dmagazine.com/commercial-real-estate/2024/09/for-eric-hage-and-kdc-now-is-the-time-to-double-down/

Sources: role type

COMPANYdate not shown in source

KDC - Eric Hage

KDC
President / Operating Committee Member
value seen: President / Operating Committee Member
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://kdc.com/why-kdc/team/eric-hage

Sources: since

COMPANYdate not shown in source

KDC - Eric Hage

KDC
DALLAS (Sept. 5, 2024)— KDC, one of the nation’s leading real estate development and investment firms, has promoted Eric Hage to president.
value seen: Sept. 5, 2024
https://kdc.com/why-kdc/team/eric-hage

Sources: summary

COMPANYdate not shown in source

KDC - Eric Hage

KDC
As President of KDC, Eric Hage is responsible for the firm’s overall corporate strategy, growth and investment initiatives, business relationships, and the day-to-day operations of the company.
value seen: Eric Hage is KDC’s President and an Operating Committee member, responsible for corporate strategy, growth and investment initiatives, relationships and day-to-day operations. He joined KDC after 18 years in construction, including leading a Dallas office of a major national contractor, and has worked on major North Texas developments.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/why-kdc/team/eric-hage

Sources: title

COMPANYdate not shown in source

KDC - Eric Hage

KDC
President / Operating Committee Member
value seen: President / Operating Committee Member
https://kdc.com/why-kdc/team/eric-hage
SO
Scott Ozymy
Scott Ozymy is KDC’s Chief Investment Officer and an Operating Committee member. He oversees development, acquisitions, financing, partner relations and asset dispositions, and brings prior experience as an asset manager and commercial real-estate investment adviser for the Carpenter Family, the original developers of Las Colinas.
Current title
Chief Investment Officer / Operating Committee Member
since 2000
Experience
no career length stated
Companies before
Carpenter Family
Education
Midwestern State UniversityBachelor of Business Administration, Finance
Other boards
none sourced
Known for
nothing tagged
Work email: scott.ozymy@kdc.com1 Email

Sources: degree

COMPANYdate not shown in source

KDC - Scott Ozymy

KDC
Ozymy attended Midwestern State University, where he earned a Bachelor of Business Administration in Finance.
value seen: Bachelor of Business Administration, Finance
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/scott-ozymy

Sources: institution

COMPANYdate not shown in source

KDC - Scott Ozymy

KDC
Ozymy attended Midwestern State University, where he earned a Bachelor of Business Administration in Finance.
value seen: Midwestern State University
https://kdc.com/why-kdc/team/scott-ozymy

Sources: email

COMPANYdate not shown in source

KDC - Scott Ozymy

KDC
- scott.ozymy@kdc.com
value seen: scott.ozymy@kdc.com
https://kdc.com/why-kdc/team/scott-ozymy

Sources: full name

COMPANYdate not shown in source

KDC - Scott Ozymy

KDC
KDC - Scott Ozymy
value seen: Scott Ozymy
https://kdc.com/why-kdc/team/scott-ozymy

Sources: previous companies

COMPANYdate not shown in source

KDC - Scott Ozymy

KDC
Prior to his KDC career, Ozymy worked for the Carpenter Family, the original developer of the 12,000-acre, mixed-use Las Colinas in Irving, TX.
value seen: Carpenter Family
https://kdc.com/why-kdc/team/scott-ozymy

Sources: role type

COMPANYdate not shown in source

KDC - Scott Ozymy

KDC
Chief Investment Officer / Operating Committee Member
value seen: Chief Investment Officer / Operating Committee Member
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://kdc.com/why-kdc/team/scott-ozymy

Sources: since

COMPANYdate not shown in source

KDC - Scott Ozymy

KDC
The four-decade commercial real estate veteran joined KDC in 2000, shortly after its rebranding from Koll Development Company.
value seen: 2000
https://kdc.com/why-kdc/team/scott-ozymy

Sources: summary

COMPANYdate not shown in source

KDC - Scott Ozymy

KDC
Scott Ozymy, KDC’s chief investment officer, oversees all company investment activities. His responsibilities include hands-on activities in development, acquisition, financing, partner relations and asset dispositions.
value seen: Scott Ozymy is KDC’s Chief Investment Officer and an Operating Committee member. He oversees development, acquisitions, financing, partner relations and asset dispositions, and brings prior experience as an asset manager and commercial real-estate investment adviser for the Carpenter Family, the original developers of Las Colinas.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/why-kdc/team/scott-ozymy

Sources: title

COMPANYdate not shown in source

KDC - Scott Ozymy

KDC
Chief Investment Officer / Operating Committee Member
value seen: Chief Investment Officer / Operating Committee Member
https://kdc.com/why-kdc/team/scott-ozymy
MK
Mike Kaufman
Mike Kaufman is KDC’s Chief Financial Officer and an Operating Committee member, overseeing financial management, accounting, cash flow, taxes, compliance, asset management and lender relationships. Before KDC he was a Goldman Sachs vice president in merchant banking, where he helped launch and manage large infrastructure funds.
Current title
Chief Financial Officer / Operating Committee Member
since 2017
Experience
no career length stated
Companies before
Goldman Sachs
Education
Southern Methodist UniversityBachelor of Business Administration, Accounting
Other boards
none sourced
Known for
nothing tagged
Work email: mike.kaufman@kdc.com1 Email

Sources: degree

COMPANYdate not shown in source

KDC - Mike Kaufman

KDC
Born and raised in Champaign, IL, Kaufman relocated to Dallas in the early 1990s, earning a Bachelor of Business Administration in Accounting from Southern Methodist University.
value seen: Bachelor of Business Administration, Accounting
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/mike-kaufman

Sources: institution

COMPANYdate not shown in source

KDC - Mike Kaufman

KDC
Born and raised in Champaign, IL, Kaufman relocated to Dallas in the early 1990s, earning a Bachelor of Business Administration in Accounting from Southern Methodist University.
value seen: Southern Methodist University
https://kdc.com/why-kdc/team/mike-kaufman

Sources: email

COMPANYdate not shown in source

KDC - Mike Kaufman

KDC
- mike.kaufman@kdc.com
value seen: mike.kaufman@kdc.com
https://kdc.com/why-kdc/team/mike-kaufman

Sources: full name

COMPANYdate not shown in source

KDC - Mike Kaufman

KDC
KDC - Mike Kaufman
value seen: Mike Kaufman
https://kdc.com/why-kdc/team/mike-kaufman

Sources: previous companies

COMPANYdate not shown in source

KDC - Mike Kaufman

KDC
Kaufman joined KDC in 2017 from his previous role as a Goldman Sachs Vice President.
value seen: Goldman Sachs
https://kdc.com/why-kdc/team/mike-kaufman

Sources: role type

COMPANYdate not shown in source

KDC - Mike Kaufman

KDC
Chief Financial Officer / Operating Committee Member
value seen: Chief Financial Officer / Operating Committee Member
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://kdc.com/why-kdc/team/mike-kaufman

Sources: since

COMPANYdate not shown in source

KDC - Mike Kaufman

KDC
Kaufman joined KDC in 2017 from his previous role as a Goldman Sachs Vice President.
value seen: 2017
https://kdc.com/why-kdc/team/mike-kaufman

Sources: summary

COMPANYdate not shown in source

KDC - Mike Kaufman

KDC
As Chief Financial Officer, Mike Kaufman handles all issues related to KDC’s sound financial management. His role includes overseeing bookkeeping and accounting functions, including monitoring cash flow, taxes and asset management.
value seen: Mike Kaufman is KDC’s Chief Financial Officer and an Operating Committee member, overseeing financial management, accounting, cash flow, taxes, compliance, asset management and lender relationships. Before KDC he was a Goldman Sachs vice president in merchant banking, where he helped launch and manage large infrastructure funds.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/why-kdc/team/mike-kaufman

Sources: title

COMPANYdate not shown in source

KDC - Mike Kaufman

KDC
Chief Financial Officer / Operating Committee Member
value seen: Chief Financial Officer / Operating Committee Member
https://kdc.com/why-kdc/team/mike-kaufman
KP
Kurt Petersen
Kurt Petersen is KDC’s Executive Vice President for Design & Construction. He leads planning and execution of design-build projects, gives strategic direction to internal design and construction experts, and oversees scheduling, budgeting and compliance.
Current title
Executive Vice President / Design & Construction
since 2005
Experience
no career length stated
Companies before
Dalmac Construction Co.
Education
Kansas State UniversityBachelor of Science, Construction
Other boards
none sourced
Known for
nothing tagged
Work email: kurt.petersen@kdc.com1 Email

Sources: degree

COMPANYdate not shown in source

KDC - Kurt Petersen

KDC
Born and raised in Kansas, Petersen earned his Bachelor of Science in Construction from Kansas State University.
value seen: Bachelor of Science, Construction
held out of the figures · the quote does not carry this value
https://kdc.com/why-kdc/team/kurt-petersen

Sources: institution

COMPANYdate not shown in source

KDC - Kurt Petersen

KDC
Born and raised in Kansas, Petersen earned his Bachelor of Science in Construction from Kansas State University.
value seen: Kansas State University
https://kdc.com/why-kdc/team/kurt-petersen

Sources: email

COMPANYdate not shown in source

KDC - Kurt Petersen

KDC
- kurt.petersen@kdc.com
value seen: kurt.petersen@kdc.com
https://kdc.com/why-kdc/team/kurt-petersen

Sources: full name

COMPANYdate not shown in source

KDC - Kurt Petersen

KDC
KDC - Kurt Petersen
value seen: Kurt Petersen
https://kdc.com/why-kdc/team/kurt-petersen

Sources: previous companies

COMPANYdate not shown in source

KDC - Kurt Petersen

KDC
Before joining KDC in 2005, Petersen spent more than 20 years with Dalmac Construction Co.
value seen: Dalmac Construction Co.
https://kdc.com/why-kdc/team/kurt-petersen

Sources: role type

COMPANYdate not shown in source

KDC - Kurt Petersen

KDC
Executive Vice President / Design & Construction
value seen: Executive Vice President / Design & Construction
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://kdc.com/why-kdc/team/kurt-petersen

Sources: since

COMPANYdate not shown in source

KDC - Kurt Petersen

KDC
Before joining KDC in 2005, Petersen spent more than 20 years with Dalmac Construction Co.
value seen: 2005
https://kdc.com/why-kdc/team/kurt-petersen

Sources: summary

COMPANYdate not shown in source

KDC - Kurt Petersen

KDC
Kurt Petersen is KDC’s Executive Vice President/Design & Construction. He is responsible for the planning and execution of all KDC’s design-build projects and for providing strategic direction and guidance to the company’s team of internal design and construction experts.
value seen: Kurt Petersen is KDC’s Executive Vice President for Design & Construction. He leads planning and execution of design-build projects, gives strategic direction to internal design and construction experts, and oversees scheduling, budgeting and compliance.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/why-kdc/team/kurt-petersen

Sources: title

COMPANYdate not shown in source

KDC - Kurt Petersen

KDC
Executive Vice President / Design & Construction
value seen: Executive Vice President / Design & Construction
https://kdc.com/why-kdc/team/kurt-petersen
BC
Bret Creel
Bret Creel is KDC’s Executive Vice President for Design & Construction and co-leads its design and development departments. His remit covers the full commercial-real-estate development cycle; before KDC he held construction leadership roles with Balfour Beatty Construction, Crescent Real Estate and Centex Construction.
Current title
Executive Vice President / Design & Construction
since September 2024
Experience
no career length stated
Companies before
Balfour Beatty ConstructionCrescent Real EstateCentex Construction
Education
University of Texas-Austin’s McCombs School of BusinessBachelor of Business Administration in Financial Management and Electrical Engineering
Other boards
none sourced
Known for
nothing tagged
Work email: bret.creel@kdc.com1 Email

Sources: degree

COMPANYdate not shown in source

KDC - Bret Creel

KDC
He graduated from the University of Texas-Austin’s McCombs School of Business with a Bachelor of Business Administration in Financial Management and Electrical Engineering.
value seen: Bachelor of Business Administration in Financial Management and Electrical Engineering
https://kdc.com/why-kdc/team/bret-creel

Sources: institution

COMPANYdate not shown in source

KDC - Bret Creel

KDC
He graduated from the University of Texas-Austin’s McCombs School of Business with a Bachelor of Business Administration in Financial Management and Electrical Engineering.
value seen: University of Texas-Austin’s McCombs School of Business
https://kdc.com/why-kdc/team/bret-creel

Sources: email

COMPANYdate not shown in source

KDC - Bret Creel

KDC
- bret.creel@kdc.com
value seen: bret.creel@kdc.com
https://kdc.com/why-kdc/team/bret-creel

Sources: full name

COMPANYdate not shown in source

KDC - Bret Creel

KDC
KDC - Bret Creel
value seen: Bret Creel
https://kdc.com/why-kdc/team/bret-creel

Sources: previous companies

COMPANYdate not shown in source

KDC - Bret Creel

KDC
Creel joined KDC in early 2013, following his role as chief estimator with Balfour Beatty Construction. His more than 30 years of experience in the industry include leadership positions with Crescent Real Estate and Centex Construction.
value seen: Balfour Beatty Construction
https://kdc.com/why-kdc/team/bret-creel

Sources: previous companies

COMPANYdate not shown in source

KDC - Bret Creel

KDC
Creel joined KDC in early 2013, following his role as chief estimator with Balfour Beatty Construction. His more than 30 years of experience in the industry include leadership positions with Crescent Real Estate and Centex Construction.
value seen: Crescent Real Estate
https://kdc.com/why-kdc/team/bret-creel

Sources: previous companies

COMPANYdate not shown in source

KDC - Bret Creel

KDC
Creel joined KDC in early 2013, following his role as chief estimator with Balfour Beatty Construction. His more than 30 years of experience in the industry include leadership positions with Crescent Real Estate and Centex Construction.
value seen: Centex Construction
https://kdc.com/why-kdc/team/bret-creel

Sources: role type

COMPANYdate not shown in source

KDC - Bret Creel

KDC
Executive Vice President / Design & Construction
value seen: Executive Vice President / Design & Construction
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://kdc.com/why-kdc/team/bret-creel

Sources: since

COMPANYdate not shown in source

KDC - Bret Creel

KDC
Bret Creel was promoted to KDC’s Executive Vice President/Design and Construction in September 2024.
value seen: September 2024
https://kdc.com/why-kdc/team/bret-creel

Sources: summary

COMPANYdate not shown in source

KDC - Bret Creel

KDC
Creel co-leads KDC’s design and development departments in his current role, focusing on generating new opportunities. His daily activities include management of all phases of commercial real estate development including preconstruction due diligence, design, permitting, budgeting, scheduling, contracting and construction.
value seen: Bret Creel is KDC’s Executive Vice President for Design & Construction and co-leads its design and development departments. His remit covers the full commercial-real-estate development cycle; before KDC he held construction leadership roles with Balfour Beatty Construction, Crescent Real Estate and Centex Construction.
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://kdc.com/why-kdc/team/bret-creel

Sources: title

COMPANYdate not shown in source

KDC - Bret Creel

KDC
Executive Vice President / Design & Construction
value seen: Executive Vice President / Design & Construction
https://kdc.com/why-kdc/team/bret-creel

Projects

Assessment coverage

Completed projects: 2016-10-15 through 2026-10-15. Initial research is capped at 10 completed projects and a separate delivery-risk search capped at 7 findings. Risk findings are not project assessment counts. Absence is not proof of a complete portfolio or no failures. Month-level dates overlapping a boundary are excluded from figures.

0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.

Stalled, cancelled & overdue projects

0 evidenced cases
The capped delivery-risk search ran; no project-level exception cases are recorded here. Risk findings are listed under Risks and are separate from assessed projects. This does not establish that the developer has no delivery failures.

Completed projects

8 projects
ProjectLocationTypeUnitsFloorsAreaCostPayment planLaunchedConstruction startOriginal targetHandoverDelayConfidenceStatus
Hugs Café Inc. Headquarters and Home for Hugs Training AcademyMcKinney, United States
Downtown McKinney
office, other—two-story13,500 sq ftUSD 10m
other
—2025May 8, 2025Jun 2026 – Aug 2026Jul 20260.0 mo
(−1.0 to +1.0)
estimatedcompleted
JPMorgan Chase Operations CenterRuston, United States
office——50,000 sq ftUSD 31m
other
—2023November 2023Sep 2025 – Dec 2025Oct 2025−0.5 mo
(−2.0 to +1.0)
estimatedcompleted
Wells Fargo Las Colinas CampusIrving, United States
Las Colinas
office——850,000 sq ft——2023April 2023Sep 2025 – Dec 2025Oct 2025−0.5 mo
(−2.0 to +1.0)
sourcedcompleted
Raytheon McKinney Phase IIMcKinney, United States
office, industrial——458,000 sq ft——202220 Jan 2022Apr 2024 – Jun 2024Dec 2024+7.0 mo
(+6.0 to +8.0)
estimatedcompleted
Oncor Midlothian Distribution CenterMidlothian, United States
Railport Business Park
industrial——422,000 sq ft——2023December 2023Sep 2024 – Nov 2024Oct 20240.0 mo
(−1.0 to +1.0)
sourcedcompleted
Volkswagen Group of America Port Freeport FacilityFreeport, United States
industrial———USD 114m
other
—2022October 4, 2022Jan 2024 – Apr 2024Oct 2024+7.5 mo
(+6.0 to +9.0)
sourcedcompleted
Independent Financial Headquarters Phase 2McKinney, United States
McKinney Corporate Center Craig Ranch
office—six-story198,000 sq ft——202102/03/21Jan 2022 – Dec 2022Jul 2022+0.5 mo
(−5.0 to +6.0)
estimatedcompleted
Raytheon Advanced Integration and Manufacturing CenterMcKinney, United States
industrial——200,000 sq ft——20192019Sep 2020 – Dec 2020Jan 2021 – Dec 2021+8.0 mo
(+1.0 to +15.0)
sourcedcompleted
Click any row for the sources behind it. Cost basis matters: an estimated cost, a construction loan and a sale price are different numbers. Each row states which one it is, so they are never averaged together.

Awards

Awards & recognition

7 found
PROJECT AWARD Winner April 9, 2026
Headquarters & Build to Suit Excellence Award — 2026 Black White & Blue Awards · Wells Fargo Campus
KDC reports that its Wells Fargo project received the chapter’s Headquarters & Build to Suit Excellence Award, recognizing the collaboration on the Irving workplace campus.
PROJECT AWARD Winner April 3, 2024
Best New Office Project — D CEO’s Commercial Real Estate Awards · Wells Fargo Campus
KDC reports that the Wells Fargo campus received the Best New Office Project award at D CEO’s 2024 Commercial Real Estate Awards.
PROJECT AWARD Winner April 3, 2024
Best Office Lease — D CEO’s Commercial Real Estate Awards · Bank of America Tower at Parkside
KDC reports that the Bank of America at Parkside transaction received D CEO’s Best Office Lease award, with KDC identified as part of the project team.
GOVERNMENT RECOGNITION Winner May 3, 2021
Project of the Year Award · SRS Distribution Headquarters
KDC reports that KDC and SRS Distribution won the City of McKinney’s Project of the Year Award for the headquarters project.
RECOGNITION April 21, 2022
Special Recognition for Philanthropy — Best Real Estate Deals Awards · Children’s Advocacy Center of Collin County facility
The Dallas Business Journal reported that KDC received a special recognition at its Best Real Estate Deals Awards for work supporting the Children’s Advocacy Center of Collin County facility.
COMPANY AWARD Finalist February 5, 2025
Developer of the Year — D CEO’s 2025 Commercial Real Estate Awards
KDC reported that it was named a finalist for Developer of the Year in D CEO Magazine’s 2025 Commercial Real Estate Awards; this was a finalist recognition, not a win.
PROJECT AWARD Finalist February 5, 2025
Project category — D CEO’s 2025 Commercial Real Estate Awards · Oncor project
KDC reported that the Oncor project was recognized as a finalist in the Project category of D CEO Magazine’s 2025 Commercial Real Estate Awards; this was a finalist recognition, not a win.

Risks

Risk flags

6 found
PROJECT CANCELLED Reported August 8, 2022; project commencement was in 2019.
The KDC-promoted Valley View mixed-use redevelopment in Dallas never got off the ground after a 2019 commencement ceremony; by August 2022, Seritage was seeking to sell the land and reported that KDC was no longer involved.
DELIVERY DELAY Redesign reported January 19, 2021; KDC’s disassociation and continued lack of development reported May 7, 2024.
The KDC-planned Uptown Dallas Central Market mixed-use project was substantially redesigned in 2021 after its office tower and hotel were eliminated, and by May 2024 the site remained undeveloped with KDC saying it was no longer affiliated; the originally announced high-rise project was replaced by a possible standalone grocery store, so the original completion commitment was not achieved.
FINANCIAL DISTRESS November 10, 1992.
The predecessor Koll Co., which KDC’s own history identifies as becoming KDC, faced foreclosure proceedings in 1992 after Wells Fargo said a $51 million construction loan was past due; the report described the matter as involving a Koll joint venture and noted that Koll’s liability was limited under a non-recourse arrangement.
PROJECT CANCELLED 2019 commencement; reported stalled and KDC no longer involved on 2022-08-08
Park Heritage, the Seritage–KDC–Toll Brothers redevelopment at the former Valley View Mall site, never got off the ground after its May 2019 commencement; by August 2022 Seritage was marketing the land for sale and reporting said KDC was no longer involved, so the originally announced project was effectively abandoned (the source does not establish parent-company liability beyond the project partnership).
PROJECT CANCELLED Original plan announced 2018; redesign reported 2021; KDC non-affiliation and non-delivery reported 2024-05-07; replacement store approved 2026-04-23
KDC’s proposed Uptown Dallas mixed-use development at Lemmon and McKinney Avenues was materially abandoned/reconfigured: the planned office tower and hotel were eliminated during the COVID-era redesign, and by May 2024 KDC said it was no longer affiliated; H-E-B later pursued a standalone Central Market redevelopment instead, with city approval in April 2026, so the original KDC project should not be treated as an active failure today.
PROJECT CANCELLED Contract signed October 2018; termination announced 2018-12-10
KDC Development and Hoque Global cancelled their contract to acquire the former Dallas Morning News campus at 508 Young Street, a site they had pitched as a location for Amazon’s second headquarters; A.H. Belo confirmed that the buyer exercised its termination right, and the transaction did not close (this records a failed acquisition/development proposal, not a completed KDC construction project).

Record status

active
Coverageactive
Tracked sinceOctober 10, 2026
Last checkedOctober 15, 2026 this month
Profile last researchedOctober 15, 2026
Claim
Work for this company? Claiming lets you correct the record with sources and get alerts when it changes.
For informational purposes only. This information is not investment, financial or credit advice and should not be relied on for investment, lending or credit decisions. Records may be incomplete or outdated. Verify information independently and seek qualified advice before making a decision.