Artificial Intelligence
Builders Company
Developers/MGS Development
MD
MGS DevelopmentDubai, United Arab Emirates · 1 active markets
PRIVATE

MGS Development builds residential apartments and waterfront communities in Dubai, with earlier projects identified in Kazakhstan. Its Dubai offering targets buyers seeking premium coastal homes, blending modern design, amenities, sustainability and flexible off-plan sales through developer and marketing partners.

LinkedIn headcount
15
employees, as shown on LinkedIn · size band 11–50
Projects last researched October 14, 2026
Every figure on this card was read out of a document.

Overview

Investor tear sheet

a summary of the tabs that follow · no rating of our own

Company dossier

Legal name
M G S Development L.L.C1
Headquarters
Jumeirah Street1, Dubai1, United Arab Emirates
Founded
not published
Entity type
PRIVATE1
Business model
offplan for sale1
Markets
1 market listed
What they build
Residential, for sale (10 of 10)
Full dossier in About →

Delivery record

5 date-assessed of 10 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
10
within the rolling ten-year window
Median delay
0.0 mo
the middle of 5 scored projects
Average delay
0.0 mo
the same projects, pulled by the worst
Average time to deliver
—
no delivered projects with a dated start — needs 3
Worst slip
0.0 mo
Delta — Moldagaliyeva 1 · −11.0 to +11.0
5
early or less than 6 months late
6 to 12 months late
0
yellow rows below
Over 12 months late
0
red rows below

Against other developers

5 date-assessed here · 102 developers, 363 date-assessed projects in United Arab Emirates
Median delay
MGS Development·102 developers in United Arab Emirates
0.0 mo vs +4.5 mo
this developer 4.5 mo better
The typical project on each side.
Average delay
MGS Development·102 developers in United Arab Emirates
0.0 mo vs +9.6 mo
this developer 9.6 mo better
Both pulled by their worst few.
On time
MGS Development·102 developers in United Arab Emirates
100% vs 54%
this developer 46 pts better
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
Projects and timelines in Track Record →

Resident experience

10 of 10 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
9.4/ 10
Weighted judgment across build and operations · from 10 of 10 rated buildings
Structure & systems
8.0/ 10
Fabric, services, waterproofing, envelope · from 4 of 10 rated buildings
Management & living
9.3/ 10
Upkeep, response times, amenities, community · from 10 of 10 rated buildings

Against other developers

10 rated here · 118 developers, 503 rated buildings in United Arab Emirates
Overall rating
MGS Development · 118 other developers in United Arab Emirates
9.4 vs 7.6
this developer 1.8 better
The weighted verdict on each side. From 10 of 10 rated buildings here and 503 in the market.
Structure & systems
MGS Development · 118 other developers in United Arab Emirates
8.0 vs 6.8
this developer 1.2 better
Fabric and engineering only — fixed at handover. From 4 of 10 rated buildings here and 228 in the market.
Management & living
MGS Development · 118 other developers in United Arab Emirates
9.3 vs 7.3
this developer 2.0 better
Upkeep and response — belongs to whoever runs the building now. From 10 of 10 rated buildings here and 480 in the market.
The market here is United Arab Emirates: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.
Ratings by building →

Awards & recognition

No documented awards or recognitions in the sources reviewed.

All awards →

Risks & source coverage

  • DELIVERY DELAY Planned completion: August 2026; last inspection: 31 August 2026; position researched: 14 October 2026 Edgewater Residences 2, developed by MGS Development, was still recorded as 54.7% complete at the 31 August 2026 inspection even though its planned completion date was August 2026; the source marks that date as passed, documenting non-delivery by the research date.
Record status
active
Company sources
76 source entries across 76 fields
Projects tracked
10 · 10 completed in assessment
All flags and sources →

Track Record

Delivery record

5 date-assessed of 10 projects
Unverified by developer

AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.

Completed projects from 2016-10-15 through 2026-10-15, with sufficient delivery-date evidence. Date assessment and developer profile verification do not mean an independent audit of every source. Original source links and available snippets are provided. May not represent the developer’s full portfolio. 0 undated and 0 boundary-uncertain completions are excluded. Delivery exceptions are listed separately under Projects.
Completed projects assessed
10
within the rolling ten-year window
Median delay
0.0 mo
the middle of 5 scored projects
Average delay
0.0 mo
the same projects, pulled by the worst
Average time to deliver
—
no delivered projects with a dated start — needs 3
Worst slip
0.0 mo
Delta — Moldagaliyeva 1 · −11.0 to +11.0
5
early or less than 6 months late
6 to 12 months late
0
yellow rows below
Over 12 months late
0
red rows below

Against other developers

5 date-assessed here · 102 developers, 363 date-assessed projects in United Arab Emirates
Median delay
MGS Development·102 developers in United Arab Emirates
0.0 mo vs +4.5 mo
this developer 4.5 mo better
The typical project on each side.
Average delay
MGS Development·102 developers in United Arab Emirates
0.0 mo vs +9.6 mo
this developer 9.6 mo better
Both pulled by their worst few.
On time
MGS Development·102 developers in United Arab Emirates
100% vs 54%
this developer 46 pts better
Share of date-assessed projects delivered early or less than 6 months after the original target. Exactly 6 months late is excluded.
The market here is United Arab Emirates: every other developer whose head office is in the same country, because planning regimes and reporting norms move together within one. It is not a city, a sector or a size band. Read the two delay figures together. A median close to the market with a much better average means no single disaster; the reverse means one project is carrying the record. Time to deliver runs from the earliest start we hold to the completion itself — a construction start where a source gave one, otherwise a sales launch, otherwise the launch year read as its January. A handover the sources place only inside a year is read as that December, so a duration is the widest the record allows rather than the flattering end of it. Only delivered projects dated at both ends count, so it is taken over fewer projects than the delay figures, and a long build is not a fault: a tower is not a villa run. Sourced figures only, both sides, and values taken from documents held on file are excluded here — a developer who shares their records should not score better than one who does not.

Construction start to handover

10 of 10 projects dated · 1 place
Based on covered projects with documented construction or launch dates and available handover dates. Timelines vary by project and may not represent the developer’s full portfolio.
Construction start, or the launchTarget completion (window)Completion or handover, as reportedCurrently statedLaunch year only, no date publishedEarly or ≤6 mo lateOver 6–12 mo lateOver 12 mo lateStalled
Astana
20232024202520262027todayASTANAon timeverifiedcompleted, no target publishedon timeverifiedon timeverifiedon timeverifiedcompleted, no target publishedcompleted, no target publisheddates under reviewon timeverifiedcompleted, no target published
Click a row in the chart to open a project, or a table row below to see its sources. The chart runs wider than the page where the record spans many years — scroll it sideways to follow a project to its handover. Every date we have is drawn. A hollow marker is only a launch year, not a date anyone published. No dates published means we looked and found none; dates not yet checked means we have not looked yet. Handing over is not finished — rows say which. A delay is shown when one source gives the promised date and another gives the real one, however rough: "2019" still counts, and the row shows how wide that is. Projects missing one of the two dates, or with sources that disagree, are left out of the figures. 4 turned out to be about something else — a phase, a neighbour, the wider masterplan — and are marked off-subject.

Building & Livability Ratings

Resident experience

10 of 10 buildings rated · scale 1–10

AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.

Overall verdict
9.4/ 10
Weighted judgment across build and operations · from 10 of 10 rated buildings
Structure & systems
8.0/ 10
Fabric, services, waterproofing, envelope · from 4 of 10 rated buildings
Management & living
9.3/ 10
Upkeep, response times, amenities, community · from 10 of 10 rated buildings

Against other developers

10 rated here · 118 developers, 503 rated buildings in United Arab Emirates
Overall rating
MGS Development · 118 other developers in United Arab Emirates
9.4 vs 7.6
this developer 1.8 better
The weighted verdict on each side. From 10 of 10 rated buildings here and 503 in the market.
Structure & systems
MGS Development · 118 other developers in United Arab Emirates
8.0 vs 6.8
this developer 1.2 better
Fabric and engineering only — fixed at handover. From 4 of 10 rated buildings here and 228 in the market.
Management & living
MGS Development · 118 other developers in United Arab Emirates
9.3 vs 7.3
this developer 2.0 better
Upkeep and response — belongs to whoever runs the building now. From 10 of 10 rated buildings here and 480 in the market.
The market here is United Arab Emirates: every other developer whose head office is in the same country, because the review platforms residents use, and the service norms they judge against, move together within one. It is not a city, a sector or a price band. Read structure and living together. A developer above the market on structure and below it on living builds well and runs buildings badly, which is a fixable problem and a different one from building badly. Higher ratings are better; differences use the displayed scores rounded to one decimal. Rated buildings only, on both sides, and a structure or living score with no stated basis — no review count and no notes or links — is left out of both.

By building

10 rated · 0 not rated · scale 1–10
ProjectOverallStructure & systemsManagement & living
Delta — Moldagaliyeva 3Astana
9.9/ 10
—/ 10
9.9/ 10

The 2GIS building page is the largest published resident rating set at 4.9/5 from 505 assessments, which converts to an approximately 9.7/10 anchor under the supplied curve. The second 2GIS building listing is also positive at 4.8/5 from 203 assessments and does not materially dissent. Readable comments add modest positive commentary for cleanliness, quiet neighbours and the courtyard, while no recurring operational or structural complaint was established.

+ Clean entrances+ Quiet neighbours+ Comfortable playground+ Quiet area+ Good courtyard

no notes returned

no links returned

The resident-facing feedback is strongly positive: one reviewer wrote “подъезды чистые, соседи тихие, площадка комфортная, атмосфера уютная” (“clean entrances, quiet neighbours, a comfortable playground, a cosy atmosphere”). Another praised the “шикарный двор” and said the area was “очень тихий” (“very quiet”); the only material concern read was a question asking whether there were water problems, not a reported failure.

Delta — Moldagaliyeva 7Astana
9.9/ 10
8.8/ 10
9.9/ 10

2GIS provides the largest published review base at 5/5 from 1,006 ratings, setting a 10.0 converted anchor; Yandex independently reports 5/5 from 178 ratings. The reported reviews contain strong repeated praise, but also mixed structural comments and some operational/environmental complaints, so the anchor is adjusted modestly downward rather than treated as a perfect resident-experience score.

+ Warm homes+ Good sound insulation reported+ Quality laminate and Schneider electrical installation reported+ Spacious parking+ Reportedly attractive architecture
− Thin walls reported− Weak pipes reported− Single flooding report− Lift sometimes not working− One report of poor construction quality
+ Quiet and clean+ Comfortable service+ Warm and secured compound+ Spacious courtyard and parking+ Friendly, positive resident experience
− Waste reported around the complex− Infrastructure still developing− Management communication complaint− Reported recurring-cost/garbage-charge frustration− One complaint about neighbour relations

Structural feedback is mixed: one Yandex reviewer wrote that “трубы очень слабые” and that the lift sometimes does not work, while a 2GIS reviewer said “Стены очень тонкие.” Other reviews praise warmth, sound insulation and apartment specifications, including quality laminate and Schneider electrical installation; these are resident comments rather than an engineering inspection.

Day-to-day reviews are predominantly favourable: residents describe Delta as “тихо, чисто, уютно” with service “на высшем уровне,” and another reviewer calls it warm, guarded and enclosed. Negative feedback includes “Кругом мусор. Инфраструктура не развита” and a complaint that the KSK and manager “толком ничего не объясняет”; the local area was also described as still developing.

Park CityNura, Astana100 units
9.9/ 10
—/ 10
9.9/ 10

The largest published review base is the 2GIS Park City Forum aggregate at 5/5 from 261 evaluations, which converts to 10/10 under the specified curve. The smaller 4.1/5 building listing is materially lower, while the written feedback is mostly positive but includes one management complaint; applying only the reported commentary produces 9.9 overall and for living quality. No building-fabric/system score is assigned because the reviews did not publish usable structural-condition evidence.

+ Positive location feedback+ Lake views+ New residential complex
− Management responsiveness complaint

no notes returned

no links returned

Residents describe Park City Forum as a “прекрасный дом” with a “топ” location, and another review praises the lake view from higher floors. The main operational complaint found was that the management company was “ужасное” and the accountant allegedly “вообще не берет трубку”; this is one serious management report rather than a demonstrated recurring pattern.

ElevenNura, Astana643 units
9.7/ 10
—/ 10
9.7/ 10

The 2GIS building aggregate of 4.9/5 from 682 evaluations sets the level and converts to 9.5/10 under the specified curve. The limited substantive written feedback is positive and aligns with the aggregate, while no recurring complaint was found; the score therefore receives only a modest positive commentary adjustment. The complex was reported as completed by Q2 2025, so this is a current-position assessment as of 2026-10-14, not a forecast.

+ Warm building+ Monolithic construction+ Central heating+ Energy-saving glazing+ Video surveillance
+ Friendly neighbours+ Convenient nearby amenities+ Closed/private courtyard+ Face ID and electronic locks+ Children’s and sports areas

The published resident feedback includes the direct observation “дом очень теплый” (“the building is very warm”). The property descriptions report a monolithic structure, central heating, energy-saving glazing, connected utilities and video surveillance, but no resident review read reported leaks, lift failures, plumbing problems or other structural defects.

The resident comments describe “соседи дружные” (“friendly neighbours”), a prestigious area and nearby necessities, while another review calls the complex “очень классный.” Published building information also lists a closed courtyard, Face ID access, surveillance, children’s and sports areas, and nearby schools, shops and leisure facilities; no recurring operational complaint was found in the reviews read.

Delta — Moldagaliyeva 1Astana
9.4/ 10
9.0/ 10
8.0/ 10
Booking.com (syndicated review page) 9.8/10 · 6 reviews · nur-sultan-hotel.com
Booking.com (syndicated review page) publishes 9.8/10 from 6 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 8.

The building-specific 2GIS aggregate of 4.8/5 from 229 assessments sets the level, converting to 9.4/10 under the stated curve. The report contains substantial positive operational commentary, but also one serious infrastructure allegation and lesser management/waste complaints; these temper the structure and living subscores without overturning the large resident aggregate. Evidence is current enough to establish a review position as of the research date, but individual review dates are not uniformly exposed and some Yandex material is cluster-level.

+ Warm apartments+ Good sound insulation reported+ Large windows+ Monolithic construction+ Central communications
− Weak pipes reported− Flooding reported− Occasional lift failure reported− One review alleges poor construction quality
+ Warm and clean+ Quiet environment+ Enclosed courtyard+ Security/guarding reported+ Good parking and courtyard
− Management communication complaint− Waste-charge explanation complaint− Rubbish reported nearby− Surrounding infrastructure still developing

Resident-facing reviews describe the building as warm, with one resident saying the apartment stays warm even with radiators off, and another reporting good sound insulation and large windows. The main adverse infrastructure report says «трубы очень слабые», that neighbours flood one another, and that the lift sometimes does not work; this is a serious but isolated report in the material read.

Day-to-day feedback is mostly favourable: residents describe Delta as «тихо, чисто, уютно» with service «на высшем уровне», and another review praises the warm, secured home and enclosed grounds. Counterpoints include a complaint that the KSK and manager do not explain waste charges properly, plus «Кругом мусор» and an observation that nearby infrastructure is still developing.

Delta — Moldagaliyeva 5Astana
9.4/ 10
—/ 10
9.4/ 10

Единственный применимый рейтинг именно для Delta по адресу Жубан Молдагалиева, 5 — 4,8/5 на 226 оценках 2GIS, поэтому он задаёт уровень и переводится в 9,4/10. Прочитанные отзывы содержат положительные наблюдения о дворе и детской инфраструктуре, но единичная жалоба на утренний шум не является повторяющейся темой и оценку не меняет; структурный балл не выставлен из-за отсутствия опубликованной оценки физического состояния здания.

+ чистый и аккуратный двор+ детские площадки и беседки
− утренний шум от автобусной остановки

no notes returned

no links returned

На странице 2GIS жилой комплекс получил 4,8/5 по 226 оценкам. В содержательных отзывах двор описан как «чистый и аккуратный», с детскими площадками и беседками; отдельная жалоба отмечает: «Под окнами реально шумно, особенно утром» из-за конечной остановки автобусов.

Respublika — phase 2 (blocks C and D)Nura, Astana
9.4/ 10
8.5/ 10
9.4/ 10

The 2GIS Respublika listing provides the largest review base at 4.9/5 from 296 evaluations, setting a 9.7 converted level. Google’s 4.9/5 from 14 reviews is consistent, while the written complaints about sewage and alleged structural/lift problems justify a modest downward adjustment rather than overturning the aggregate.

+ Sound insulation praised+ Three lifts reported+ Central heating+ Three-metre ceilings
− Alleged flooded basement− Alleged wall cracks and structural disturbance− Alleged lift failures− Sewage runoff affecting the surroundings
+ Highly rated location+ Eco-park outlook+ Closed courtyard+ Parking+ Positive service comments
− Persistent sewage odour reported− Complaints said to receive no response from authorities

One Google review describes the complex as having “шумоизоляция отличная, 3 лифта, паркинг, потолки 3 м,” while another resident-facing review alleges a “затопленный подвал,” wall cracks and lift failures. Separately, a 2025 report quotes a resident saying sewage odour rises “буквально в каждую квартиру”; these are published allegations, not an engineering inspection or confirmed finding.

Residents and reviewers repeatedly praise the location and eco-park, including “Оочень удобно для проживания!!”; other reviews mention a closed courtyard, parking and good service. The main operational concern is a resident’s report that sewage odour enters apartments and that repeated calls to the Nura district administration produced “никакой реакции” (no reaction).

Delta — Moldagaliyeva 9Astana
9.1/ 10
—/ 10
9.1/ 10

2GIS provides the largest and only published review aggregate located for the specific building: 4.7/5 from 165 ratings, which converts to 9.1/10 on the specified curve. The written comments contain positive lifestyle feedback and one isolated short-stay service complaint, but no recurring theme meeting the adjustment rule; no structural score is assigned because no published review evidence about physical systems was found.

+ тихая и тёплая квартира+ положительное общее впечатление о доме
− жалоба на невозврат депозита− жалоба на отсутствие базовых удобств в краткосрочной аренде

no notes returned

no links returned

Жильцы и посетители описывали опыт неодинаково: один отзыв говорит «Очень теплая квартира, тихо, спокойно», а другой — «Мне очень понравилось это дом». Отдельный отрицательный отзыв заявляет о невозврате депозита, отсутствии жидкого мыла, туалетной бумаги и фена, а также о «контакта к клиентами 0»; это единичная жалоба и не доказывает системную проблему управления всем домом.

Four SeasonsAstana511 units
8.8/ 10
—/ 10
8.8/ 10

2GIS provides the largest published review base and sets the level at 4.6/5, converted to 8.8/10; its rating is marked UNKNOWN audience because the page also contains reviews of businesses inside the complex. The resident portals contain materially less favorable evidence but each has fewer than 10 reviews, and the detailed physical-condition criticism is a single report rather than a recurring theme, so no commentary adjustment is applied.

+ Clean, attractive entrance reported+ Good views reported
− Weak window profiles and handles reported− Open, non-functional balcony ventilation grilles− Dust and dampness on balcony reported− Apartment electrical wiring absent in one handover report− Finishing required in apartment reported
+ Highly rated building listing+ Strong location praise+ Clean, attractive entrance reported+ Nearby amenities and walkability praised
− Concern about overcrowded transport− Concern about high apartment density− Construction affecting views reported

One resident review reported that quality «оставляет желать лучшего», citing cheap window profiles, weak handles, open air-conditioning grilles that made the balcony «пыльно и сыро», protruding monoblock finishes and no apartment electrical wiring. This is a single detailed condition report rather than a recurring structural theme; the other readable resident reviews did not describe physical-system failures.

The 2GIS building listing publishes 4.6/5 from 314 ratings, but its visible text includes reviews of businesses operating in the building, so it is not purely a resident-management measure. Resident comments praised the location and entrance—«Локация самая шикарная что есть!» and «Подъезд красивый, чистый, супер!»—while other reviews complained about crowded buses, apartment density and nearby construction.

Respublika — phase 3 (blocks E and F)Nura, Astana
8.6/ 10
5.5/ 10
8.8/ 10

The largest qualifying review base is the 2GIS Block E aggregate, 4.7/5 from 186 evaluations, which converts to 9.1 under the specified curve; the separate Block F 4.7/5 aggregate is directionally consistent. The score is lowered by the serious sewage-odour report and smaller operational complaints, while favourable comments on warmth, courtyard quality, location and current management keep the result above the unadjusted midrange.

+ Warm apartments+ Dry parking+ Good windows and sound insulation
− Sewage odour reaching apartments− Wastewater flowing to a drainage channel− Reported flooding in the surrounding development area− Very loud lift-door sound
Not found in sources: No water problems reported
+ Well-kept courtyard+ Greenery and children's playgrounds+ Fast current management response+ Convenient schools, shops and services+ Quiet location praised by residents
− Earlier management response delays− Entrance door can remain open− Weak access control near shops/parking− Late-night child noise− Litter near refuse area

Residents reported that the apartments are warm, water supply is trouble-free and the parking areas are dry; another review praised “хорошие окна и шумоизоляцию.” However, a September 2025 report quoted a resident saying sewage odour rose “буквально в каждую квартиру” and described wastewater flowing through manholes into a drainage channel; this is a serious environmental/infrastructure complaint, but the available evidence is a single reported resident account rather than an engineering finding.

Daily-life feedback is mixed but leans positive: residents describe a “тихий спокойный район,” a well-kept green courtyard, functioning lifts and management that “быстро реагирует на заявки.” Complaints include earlier unresponsive management, an entrance door that can be left open, people entering through commercial/parking areas, litter beside the bins and children making noise after 23:00.

Only buildings that have reached handover are rated. 0 of 10 projects carry no rating: a building still under construction is never asked about, one that has just been handed over may not have been reached yet, and the rest were asked about and no published resident commentary was found. Structure is fixed at handover and stays the developer's; management and living belongs to whoever runs the building now. The overall verdict weights both rather than averaging them. None of this is checked: a rating is what people published about a building, aggregated — it is not evidence, it cannot move a delay figure, and it is not part of the delivery record above.

About

Company dossier

Legal name
M G S Development L.L.C
Headquarters
Jumeirah Street, Dubai, United Arab Emirates
Jumeirah 1
Founded
not published
Entity type
PRIVATE
Revenue
USD 427775 annual
Business model
offplan for sale

Partners

4 partners
SAT-NS Construction Company
partner

MGS Development is described as operating under SAT-NS Construction Company, which is identified as a subsidiary of SAT Holding.

AYENK
partner

AYENK, a Miami-based architectural firm, partnered with MGS Development on the Edgewater Residences design.

Metropolitan Premium Properties
partner

Metropolitan Premium Properties is identified as Edgewater Residences' exclusive sales and marketing partner.

Ancient Builders Constructions LLC
contractor

Ancient Builders identifies MGS Developments LLC as the client for the Edge Water B construction project.

Sources: name

LISTING_PORTALdate not shown in source

EDGEWATER RESIDENCES PHASE 3 by MGS Development in Dubai Islands, Dubai | Apartments for sale

OPR
MGS Development is a Dubai-based developer that operates under SAT-NS Construction Company, a subsidiary of SAT Holding.
value seen: SAT-NS Construction Company
https://opr.ae/projects/edgewater-residences-phase-3-mgs-development-dubai-islands

Sources: partner type

LISTING_PORTALdate not shown in source

EDGEWATER RESIDENCES PHASE 3 by MGS Development in Dubai Islands, Dubai | Apartments for sale

OPR
MGS Development is a Dubai-based developer that operates under SAT-NS Construction Company, a subsidiary of SAT Holding.
value seen: operates under SAT-NS Construction Company
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://opr.ae/projects/edgewater-residences-phase-3-mgs-development-dubai-islands

Sources: summary

LISTING_PORTALdate not shown in source

EDGEWATER RESIDENCES PHASE 3 by MGS Development in Dubai Islands, Dubai | Apartments for sale

OPR
MGS Development is a Dubai-based developer that operates under SAT-NS Construction Company, a subsidiary of SAT Holding.
value seen: a subsidiary of SAT Holding
value paraphrased from this source
https://opr.ae/projects/edgewater-residences-phase-3-mgs-development-dubai-islands

Sources: name

PRESS2025-02-26

MGS Development announces the launch of Edgewater Residences on Dubai Islands

Zawya
MGS Development has partnered with AYENK, a Miami-based architectural firm known for its expertise in luxury waterfront design.
value seen: AYENK
https://www.zawya.com/en/press-release/companies-news/mgs-development-announces-the-launch-of-edgewater-residences-on-dubai-islands-w8u7oja0

Sources: partner type

PRESS2025-02-26

MGS Development announces the launch of Edgewater Residences on Dubai Islands

Zawya
MGS Development has partnered with AYENK, a Miami-based architectural firm known for its expertise in luxury waterfront design.
value seen: partnered with AYENK, a Miami-based architectural firm
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://www.zawya.com/en/press-release/companies-news/mgs-development-announces-the-launch-of-edgewater-residences-on-dubai-islands-w8u7oja0

Sources: summary

PRESS2025-02-26

MGS Development announces the launch of Edgewater Residences on Dubai Islands

Zawya
MGS Development has partnered with AYENK, a Miami-based architectural firm known for its expertise in luxury waterfront design.
value seen: luxury waterfront design
value paraphrased from this source
https://www.zawya.com/en/press-release/companies-news/mgs-development-announces-the-launch-of-edgewater-residences-on-dubai-islands-w8u7oja0

Sources: name

PRESS2025-02-26

MGS Development announces the launch of Edgewater Residences on Dubai Islands

Zawya
Metropolitan Premium Properties (MPP), the flagship property company of the Metropolitan Group is the exclusive sales and marketing partner for the project.
value seen: Metropolitan Premium Properties
https://www.zawya.com/en/press-release/companies-news/mgs-development-announces-the-launch-of-edgewater-residences-on-dubai-islands-w8u7oja0

Sources: partner type

PRESS2025-02-26

MGS Development announces the launch of Edgewater Residences on Dubai Islands

Zawya
Metropolitan Premium Properties (MPP), the flagship property company of the Metropolitan Group is the exclusive sales and marketing partner for the project.
value seen: exclusive sales and marketing partner
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://www.zawya.com/en/press-release/companies-news/mgs-development-announces-the-launch-of-edgewater-residences-on-dubai-islands-w8u7oja0

Sources: summary

PRESS2025-02-26

MGS Development announces the launch of Edgewater Residences on Dubai Islands

Zawya
Metropolitan Premium Properties (MPP), the flagship property company of the Metropolitan Group is the exclusive sales and marketing partner for the project.
value seen: exclusive sales and marketing partner for the project
value paraphrased from this source
https://www.zawya.com/en/press-release/companies-news/mgs-development-announces-the-launch-of-edgewater-residences-on-dubai-islands-w8u7oja0

Sources: name

CONTRACTORdate not shown in source

Edge Water B - ABC Builders

Ancient Builders Constructions LLC
Client MGS Developments LLC
value seen: MGS Developments LLC
https://ancientbuilders.ae/project/edge-water-deira-island-b/

Sources: partner type

CONTRACTORdate not shown in source

Edge Water B - ABC Builders

Ancient Builders Constructions LLC
Client MGS Developments LLC
value seen: Client MGS Developments LLC
no listed category matches this wording, so it is shown as the source wrote it
held out of the figures · no listed category matches this wording
value paraphrased from this source
https://ancientbuilders.ae/project/edge-water-deira-island-b/

Sources: summary

CONTRACTORdate not shown in source

Edge Water B - ABC Builders

Ancient Builders Constructions LLC
Client MGS Developments LLC
value seen: Client MGS Developments LLC
value paraphrased from this source
https://ancientbuilders.ae/project/edge-water-deira-island-b/

Registrations & licences

none found
Jurisdiction-agnostic: a DLD number, a Companies House number and a state RERA registration all land in the same table.

Contact

Markets

1 countries
United Arab Emiratesactive 0 projects tracked
10 of 10 projects carry no country in the record — most of those name only a city — so they are not counted against a market here.

What they build

1 type
Residential, for sale10 of 10
A project counts once under each type it carries, so the shares add to more than the project count.

Management

Principals & executives

6 names found
AJ
Armin Jalili
A third-party developer profile identifies Armin Jalili as MGS Development’s CEO and describes the company as a Dubai residential developer linked to SAT Holding through SAT-NS Construction Company. Separately, a July 2025 business report records Jalili’s appointment as CEO of Unique Properties, so his current MGS role should be treated as uncertain rather than assumed current.
Current title
Chief Executive Officer
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
nothing tagged
https://linkedin.com/in/armin-jalili

Sources: full name

OTHERdate not shown in source

3 Projects by MGS Development in Dubai: Track Record & Prices

DataHabibi
MGS Development is a privately held real estate developer based in Dubai, founded in 2013 and led by CEO Armin Jalili.
value seen: Armin Jalili
https://datahabibi.ae/dubai/developers/mgs-development

Sources: linkedin page

SOCIAL2026-09-30

Armin Jalili

LinkedIn
# Armin Jalili
value seen: https://linkedin.com/in/armin-jalili
https://linkedin.com/in/armin-jalili

Sources: summary

OTHERdate not shown in source

MGS Development – Properties for Sale in Dubai

Inside Realty
The ownership structure is such that MGS Development acts as the Dubai division of SAT-NS Construction Company and SAT Holding.
value seen: MGS Development L.L.C. is part of SAT Holding (via SAT-NS Construction Company).
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://insiderealty.ae/en/real-estate-developers/mgs-development

Sources: title

OTHERdate not shown in source

3 Projects by MGS Development in Dubai: Track Record & Prices

DataHabibi
MGS Development is a privately held real estate developer based in Dubai, founded in 2013 and led by CEO Armin Jalili.
value seen: CEO
https://datahabibi.ae/dubai/developers/mgs-development
AS
Aidar Shukenov
A public professional profile identifies Aidar Shukenov as a Director at MGS Development in Dubai. No independently corroborated career, education, board or quote information was located in the reviewed material.
Current title
Director
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
nothing tagged
https://ae.linkedin.com/in/aidar-shukenov-090108301

Sources: full name

SOCIALdate not shown in source

Aidar Shukenov - Director at MGS Development

LinkedIn
# Aidar Shukenov - Director at MGS Development
value seen: Aidar Shukenov
https://ae.linkedin.com/in/aidar-shukenov-090108301

Sources: linkedin page

SOCIALdate not shown in source

Aidar Shukenov - Director at MGS Development

LinkedIn
Aidar Shukenov. Director at MGS Development. MGS Development. Dubai, United Arab Emirates.
value seen: https://ae.linkedin.com/in/aidar-shukenov-090108301
https://ae.linkedin.com/in/aidar-shukenov-090108301

Sources: title

SOCIALdate not shown in source

Aidar Shukenov - Director at MGS Development

LinkedIn
Director at MGS Development
value seen: Director at MGS Development
https://ae.linkedin.com/in/aidar-shukenov-090108301
AM
Assem Mengdibay
Assem Mengdibay is identified as MGS Development’s Senior Operations Project Manager, in the role since March 2023. His profile describes responsibility for project documentation, contractor coordination and payments, MEP and interior-design oversight, government approvals, escrow-account control and pricing strategy.
Current title
Senior Operations Project Manager
since Mar 2023 - Present
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
nothing tagged
https://linkedin.com/in/assem-mengdibay-114098227

Sources: full name

SOCIAL2026-09-23

Assem Mengdibay

LinkedIn
### Senior Operations Project Manager - [MGS Development] (Current)
value seen: Assem Mengdibay
held out of the figures · the quote does not carry this value
https://linkedin.com/in/assem-mengdibay-114098227

Sources: linkedin page

SOCIAL2026-09-23

Assem Mengdibay

LinkedIn
### Senior Operations Project Manager - [MGS Development] (Current)
value seen: https://linkedin.com/in/assem-mengdibay-114098227
https://linkedin.com/in/assem-mengdibay-114098227

Sources: since

SOCIAL2026-09-23

Assem Mengdibay

LinkedIn
Mar 2023 - Present (3 years and 6 months) in Dubai, Dubai, United Arab Emirates
value seen: Mar 2023 - Present
https://linkedin.com/in/assem-mengdibay-114098227

Sources: summary

SOCIAL2026-09-23

Assem Mengdibay

LinkedIn
Oversee and manage all project documentation and records for ongoing construction projects, ensuring accuracy and timely updates.
value seen: Oversee and manage all project documentation and records for ongoing construction projects
value paraphrased from this source
https://linkedin.com/in/assem-mengdibay-114098227

Sources: title

SOCIAL2026-09-23

Assem Mengdibay

LinkedIn
### Senior Operations Project Manager - [MGS Development] (Current)
value seen: Senior Operations Project Manager
https://linkedin.com/in/assem-mengdibay-114098227
GT
Gulzira Tashenova
Gulzira Tashenova is MGS Development’s Chief Project Engineer and heads its Engineering and Technical department. Her profile describes her as a senior civil engineer and technical director with more than 20 years in construction, QA/QC and project management, including technical supervision, compliance, cost control and delivery.
Current title
Chief Project Engineer
since Aug 2025 - Present
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
nothing tagged
https://linkedin.com/in/gulzira-tashenova-9b5b10350

Sources: full name

SOCIAL2026-09-09

GULZIRA TASHENOVA

LinkedIn
### Chief Project Engineer - [MGS Development] (Current)
value seen: GULZIRA TASHENOVA
held out of the figures · the quote does not carry this value
https://linkedin.com/in/gulzira-tashenova-9b5b10350

Sources: linkedin page

SOCIAL2026-09-09

GULZIRA TASHENOVA

LinkedIn
### Chief Project Engineer - [MGS Development] (Current)
value seen: https://linkedin.com/in/gulzira-tashenova-9b5b10350
https://linkedin.com/in/gulzira-tashenova-9b5b10350

Sources: since

SOCIAL2026-09-09

GULZIRA TASHENOVA

LinkedIn
Aug 2025 - Present (1 year and 1 month) in Dubai, Dubai, United Arab Emirates
value seen: Aug 2025 - Present
https://linkedin.com/in/gulzira-tashenova-9b5b10350

Sources: summary

SOCIAL2026-09-09

GULZIRA TASHENOVA

LinkedIn
Senior Civil Engineer / Technical Director with 20+ years in construction, QA/QC, and project management. Proven expertise in team leadership, compliance, cost control, and on-time project delivery.
value seen: Senior Civil Engineer / Technical Director with 20+ years in construction, QA/QC, and project management.
https://linkedin.com/in/gulzira-tashenova-9b5b10350

Sources: title

SOCIAL2026-09-09

GULZIRA TASHENOVA

LinkedIn
### Chief Project Engineer - [MGS Development] (Current)
value seen: Chief Project Engineer
https://linkedin.com/in/gulzira-tashenova-9b5b10350
ID
Ilyas Daulenov
Ilyas Daulenov has been MGS Development’s Senior Construction Consultant / Government Relations Manager since March 2024. His profile describes more than 15 years in regulatory strategy, anti-bribery systems and stakeholder governance across Kazakhstan and the UAE, with prior roles at EY and Arabtec Construction.
Current title
Senior Construction Consultant / Government Relations Manager
since Mar 2024 - Present
Experience
no career length stated
Companies before
Ernst & Young Global Consulting ServicesArabtec Construction
Education
D. Serikbayev East Kazakhstan Technical UniversityBachelor’s degree in Metallurgy
Other boards
none sourced
Known for
nothing tagged
https://linkedin.com/in/ilyas-daulenov-921921294

Sources: degree

SOCIAL2026-08-12

Ilyas Daulenov

LinkedIn
### Бакалавр, Металлургия at [D. Serikbayev East Kazakhstan Technical University]
value seen: Бакалавр, Металлургия
held out of the figures · the quote does not carry this value
value paraphrased from this source
https://linkedin.com/in/ilyas-daulenov-921921294

Sources: institution

SOCIAL2026-08-12

Ilyas Daulenov

LinkedIn
### Бакалавр, Металлургия at [D. Serikbayev East Kazakhstan Technical University]
value seen: D. Serikbayev East Kazakhstan Technical University
value paraphrased from this source
https://linkedin.com/in/ilyas-daulenov-921921294

Sources: full name

SOCIAL2026-08-12

Ilyas Daulenov

LinkedIn
### Senior Construction Consultant / Government Relations Manager - [MGS Development] (Current)
value seen: Ilyas Daulenov
held out of the figures · the quote does not carry this value
https://linkedin.com/in/ilyas-daulenov-921921294

Sources: linkedin page

SOCIAL2026-08-12

Ilyas Daulenov

LinkedIn
### Senior Construction Consultant / Government Relations Manager - [MGS Development] (Current)
value seen: https://linkedin.com/in/ilyas-daulenov-921921294
https://linkedin.com/in/ilyas-daulenov-921921294

Sources: previous companies

SOCIAL2026-08-12

Ilyas Daulenov

LinkedIn
### Senior Consultant - [Ernst & Young Global Consulting Services]
value seen: Ernst & Young Global Consulting Services
https://linkedin.com/in/ilyas-daulenov-921921294

Sources: previous companies

SOCIAL2026-08-12

Ilyas Daulenov

LinkedIn
### Compliance Manager / Government Relations Manager - [Arabtec Construction]
value seen: Arabtec Construction
https://linkedin.com/in/ilyas-daulenov-921921294

Sources: since

SOCIAL2026-08-12

Ilyas Daulenov

LinkedIn
Mar 2024 - Present (2 years) in Dubai, Dubai, United Arab Emirates
value seen: Mar 2024 - Present
https://linkedin.com/in/ilyas-daulenov-921921294

Sources: summary

SOCIAL2026-08-12

Ilyas Daulenov

LinkedIn
Senior GR & Compliance Manager with 15+ years of experience in regulatory strategy, anti-bribery systems, and stakeholder governance across infrastructure projects in Kazakhstan and the UAE.
value seen: Senior GR & Compliance Manager with 15+ years of experience in regulatory strategy, anti-bribery systems, and stakeholder governance across infrastructure projects in Kazakhstan and the UAE.
https://linkedin.com/in/ilyas-daulenov-921921294

Sources: title

SOCIAL2026-08-12

Ilyas Daulenov

LinkedIn
### Senior Construction Consultant / Government Relations Manager - [MGS Development] (Current)
value seen: Senior Construction Consultant / Government Relations Manager
https://linkedin.com/in/ilyas-daulenov-921921294
LD
Lloyd Dsouza, AssocRICS
Lloyd Dsouza is identified with two current MGS Development roles: Team Lead and Senior Sales Manager. The available profile evidence places him in Dubai and records the Team Lead appointment from September 2026 and the Senior Sales Manager role from April 2026.
Current title
Team Lead; Senior Sales Manager
Experience
no career length stated
Companies before
none sourced
Education
not published
Other boards
none sourced
Known for
nothing tagged
https://linkedin.com/in/lloyd-dsouza-assocrics-3a72081b5
since Team Lead: Sep 2026 - Present; Senior Sales Manager: Apr 2026 - Present

Sources: full name

SOCIAL2026-09-18

Lloyd Dsouza, AssocRICS

LinkedIn
### [MGS Development]
value seen: Lloyd Dsouza, AssocRICS
held out of the figures · the quote does not carry this value
https://linkedin.com/in/lloyd-dsouza-assocrics-3a72081b5

Sources: linkedin page

SOCIAL2026-09-18

Lloyd Dsouza, AssocRICS

LinkedIn
### [MGS Development]
value seen: https://linkedin.com/in/lloyd-dsouza-assocrics-3a72081b5
https://linkedin.com/in/lloyd-dsouza-assocrics-3a72081b5

Sources: since

SOCIAL2026-09-18

Lloyd Dsouza, AssocRICS

LinkedIn
Team Lead (Current) Sep 2026 - Present in Dubai, Dubai, United Arab Emirates; Senior Sales Manager (Current) Apr 2026 - Present
value seen: Sep 2026 - Present; Apr 2026 - Present
value paraphrased from this source
https://linkedin.com/in/lloyd-dsouza-assocrics-3a72081b5

Sources: title

SOCIAL2026-09-18

Lloyd Dsouza, AssocRICS

LinkedIn
#### Team Lead (Current) Sep 2026 - Present in Dubai, Dubai, United Arab Emirates
value seen: Team Lead
https://linkedin.com/in/lloyd-dsouza-assocrics-3a72081b5

Projects

Assessment coverage

Completed projects: 2016-10-15 through 2026-10-15. Initial research is capped at 10 completed projects and a separate delivery-risk search capped at 7 findings. Risk findings are not project assessment counts. Absence is not proof of a complete portfolio or no failures. Month-level dates overlapping a boundary are excluded from figures.

0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.

Stalled, cancelled & overdue projects

0 evidenced cases
The capped delivery-risk search ran; no project-level exception cases are recorded here. Risk findings are listed under Risks and are separate from assessed projects. This does not establish that the developer has no delivery failures.

Completed projects

10 projects
ProjectLocationTypeUnitsFloorsAreaCostPayment planLaunchedConstruction startOriginal targetHandoverDelayConfidenceStatus
Delta — Moldagaliyeva 1Astana
residential for sale———————Jan 2025 – Dec 2025Jan 2025 – Dec 20250.0 mo
(−11.0 to +11.0)
sourcedcompleted
Delta — Moldagaliyeva 7Astana
residential for sale————————Jan 2025 – Dec 2025—not scorablecompleted
ElevenAstana
Nura
residential for sale64319-12—————Jan 2025 – Dec 2025Jan 2025 – Dec 20250.0 mo
(−11.0 to +11.0)
sourcedcompleted
Park CityAstana
Nura
residential for sale100112-14-16-18—————Jan 2025 – Dec 2025Jan 2025 – Dec 20250.0 mo
(−11.0 to +11.0)
sourcedcompleted
Respublika — phase 3 (blocks E and F)Astana
Nura
residential for sale———————Jan 2025 – Dec 2025Jan 2025 – Dec 20250.0 mo
(−11.0 to +11.0)
sourcedcompleted
Delta — Moldagaliyeva 3Astana
residential for sale————————Jan 2024 – Dec 2024—not scorablecompleted
Delta — Moldagaliyeva 5Astana
residential for sale————————Jan 2024 – Dec 2024—not scorablecompleted
Delta — Moldagaliyeva 9Astana
residential for sale———————Jan 2024 – Dec 2024Jan 2024 – Dec 2024dates under reviewdates under reviewcompleted
Respublika — phase 2 (blocks C and D)Astana
Nura
residential for sale———————Jan 2024 – Dec 2024Jan 2024 – Dec 20240.0 mo
(−11.0 to +11.0)
sourcedcompleted
Four SeasonsAstana
residential for sale511116, 22——————Jan 2023 – Dec 2023—not scorablecompleted
Click any row for the sources behind it. Cost basis matters: an estimated cost, a construction loan and a sale price are different numbers. Each row states which one it is, so they are never averaged together.

Awards

Awards & recognition

No documented awards or recognitions in the sources reviewed.

Risks

Risk flags

1 found
DELIVERY DELAY Planned completion: August 2026; last inspection: 31 August 2026; position researched: 14 October 2026
Edgewater Residences 2, developed by MGS Development, was still recorded as 54.7% complete at the 31 August 2026 inspection even though its planned completion date was August 2026; the source marks that date as passed, documenting non-delivery by the research date.

Record status

active
Coverageactive
Tracked sinceOctober 6, 2026
Last checkedOctober 14, 2026 this month
Profile last researchedOctober 14, 2026
Claim
Work for this company? Claiming lets you correct the record with sources and get alerts when it changes.
For informational purposes only. This information is not investment, financial or credit advice and should not be relied on for investment, lending or credit decisions. Records may be incomplete or outdated. Verify information independently and seek qualified advice before making a decision.