Notting Hill Genesis develops affordable, below-market-rent and mixed-use homes across London, working with councils and public-sector partners for residents who struggle to afford housing. It reinvests commercial surpluses into existing homes, services, regeneration and additional affordable housing for London communities.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| Kidbrooke Square Phase 1Royal Borough of Greenwich, London413 units | 7.2/ 10 | 7.4/ 10 HomeViews 4.3/5 · 38 reviews · homeviews.com HomeViews publishes 4.3/5 from 38 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.4. | 7.0/ 10 HomeViews 4.2/5, 4.6/5, 3.9/5, 3.7/5 · 38 reviews · homeviews.com Combined from 4 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7. |
HomeViews’ building-level resident aggregate of 4.14/5 from 38 reviews sets the level and converts to 7.4/10 under the specified curve. The score is reduced for repeated reports of slow management, ventilation odours and utility disruption, with positive design, location and communal-space commentary limiting the reduction. The structural sub-score is a resident-perception measure, not an engineering inspection, so the structure component is indicative rather than independently verified. | |||
The published resident evidence is mixed on physical systems. One March 2026 review reports that “heating and hot water go off on average once a week,” that water was unavailable for nearly three days on one occasion, and that “the lifts are constantly breaking down”; another reviewer said a bathroom heater was broken for nearly a year before repair. The HomeViews design sub-score is 4.3/5, but that is a resident-perception score rather than an engineering inspection, so no independent structural-condition conclusion is available. | Residents describe “superb transport links,” a “lovely quiet area” where they feel safe, and communal gardens that are good for children. Day-to-day operations are less consistent: reviewers report that management takes days to reply or does not respond to service queries, while ventilation odours and water interruptions remain recurring frustrations; one review says a bigger gym was promised but “nothing has been built.” | ||
| City Park WestChelmsford, Chelmsford665 units | 7.1/ 10 | 5.5/ 10 | 6.8/ 10 HomeViews 4/5, 3.6/5, 4.8/5, 3.9/5, 3.8/5, 3.9/5 · 65 reviews · homeviews.com Combined from 6 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 6.8. |
HomeViews’ building-level resident aggregate of 4.04/5 from 65 reviews sets the anchor; using the specified conversion curve gives 7.1/10. The living score remains at the anchor because the written evidence is mixed—strong location, concierge and responsiveness praise alongside one serious management complaint—while the structure score is lower because the 2026 heat-network study documents outages, hot-water interruptions, leaks and reliability problems. The study’s proposed improvement works are future commitments as of the research date and are not treated as completed. | |||
Resident feedback described “wonderful thermal insulation” that reduces noise, and another resident said the lifts were quick. However, a May 2026 City Park West heat-network study records intermittent hot-water complaints, total heating outages from plant-room failures and leaking HIUs; it also says equipment control, overheating and reliability have had multiple historic issues. The proposed works are future commitments, not evidence that all problems were completed by 2026-10-10. | Residents consistently praised the location: one called the station and shops “literally around the corner,” while another said the property manager was “very approachable and professional.” The evidence is not uniformly positive: a July 2026 review called the experience “Great Location, Horrible Property Management,” citing unclear communication and unhelpful management; other reviews mention occasional noise, flying trash or an unclean water pond, and unexpected parking charges. | ||
| Royal Albert WharfRoyal Docks, Newham, London1,856 units | 7.0/ 10 | 7.5/ 10 HomeViews 4.3/5 · 87 reviews · homeviews.com HomeViews 4.5/5 · 19 reviews · homeviews.com Combined from 2 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.5. | 6.7/ 10 HomeViews 4.1/5, 3.8/5, 4.1/5, 3.8/5, 3.3/5 · 87 reviews · homeviews.com HomeViews 4.4/5, 4.2/5, 4.6/5, 4.4/5, 3.9/5 · 19 reviews · homeviews.com Combined from 10 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 6.7. |
HomeViews’ 4.01/5 rating from 87 resident reviews is the largest resident review base and sets the level at 7.0 before commentary. The score is reduced for repeated slow management, cleaning/maintenance and parking complaints and the single serious final-phase heating/power report, while recurring praise prevents a harsher result; the July 2026 official update says the overall project is now complete, but it does not establish that every earlier system complaint was resolved. | |||
Residents generally praise the modern design and apartment space, but the physical evidence is not uniformly positive: one HomeViews review says the paint “peel[s] off easily,” and another reports that a faulty lift should be fixed the same day. A 2025 report recorded “serious unresolved issues with the heating and power systems” in the latest phase; NHG attributed the delay to complications connecting the communal energy network, while the July 2026 project update described the overall project as complete, so the final-phase position is clearer on completion than on the lasting quality of those systems. | Day-to-day reviews describe a visually attractive, quiet waterside community with friendly concierge staff, security and useful transport links; one resident says the concierge is “always friendly and ready to take parcels,” while another says the area feels like “a little village.” The main operational weaknesses are repeated slow management responses, dirty communal/outdoor areas, parking difficulty and some safety/parcel concerns; a resident reported parcels stolen five times and said management would not provide CCTV information. | ||
| Gallions PlaceRoyal Docks, Newham, London241 units | 6.9/ 10 | 7.5/ 10 HomeViews 4.3/5 · 87 reviews · homeviews.com HomeViews publishes 4.3/5 from 87 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.5. | 7.1/ 10 HomeViews 4.1/5, 3.8/5, 4.1/5, 3.8/5, 3.3/5 · 87 reviews · homeviews.com Google Reviews/Maps 5/5 · 3 reviews · exa.ai Combined from 6 published figures on 2 platforms, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.1. |
HomeViews’ 4.01/5 from 87 resident reviews is the largest published review base located and converts to approximately 7.0/10, setting the level. The score is reduced for repeated management, cleanliness and security concerns, while the positive themes prevent a larger reduction; the structure sub-score is kept separate because most evidence is cluster-level and limited. | |||
The available cluster evidence is broadly positive about appearance and space: one resident said the buildings’ design was good and that apartment size was the strongest feature. Physical-condition criticisms include “paint on the walls are low quality and so peel off easily,” bathroom-faucet quality, slow resolution of a faulty lift, and a separate 2025 report of unresolved heating and power issues in Royal Albert Wharf phase 3; the latter is not proof that Gallions Place itself had the same failure. | Residents describe Royal Albert Wharf as “Calm and picturesque,” with friendly concierge staff, quiet streets and convenient DLR access. Operational feedback is mixed: management is often said to require prompting, communal areas are described as “constantly dirty,” parking is “a nightmare,” and one resident reported five parcel thefts over 1.5 years; these are cluster-level reviews rather than all Gallions Place-only reviews. | ||
| Lampton Parkside – Grimshaw CourtHounslow, London42 units | 5.8/ 10 | 6.6/ 10 HomeViews 3.9/5 · 34 reviews · homeviews.com HomeViews publishes 3.9/5 from 34 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 6.6. | 5.4/ 10 HomeViews 3.6/5, 3.2/5, 2.9/5 · 34 reviews · homeviews.com Combined from 3 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 5.4. |
Grimshaw Court was confirmed as a 42-home, five-storey affordable-rent block handed over in September 2023, but the published resident rating and written reviews located are for the wider Lampton Parkside development, not this block. Because the evidence cannot be reliably assigned to Grimshaw Court, no building score is calculated; the 2030 completion statement concerns the wider development and is a future commitment, not completion of Grimshaw Court. | Not found in sources: No Grimshaw-specific engineering feedback | ||
No review source located publishes structural or systems feedback specifically for Grimshaw Court. Cluster-level HomeViews reviews mention “technical, installation ... and other repair issues,” a major unresolved defect, and a mechanical case lasting “more than 50days”; these observations should not be assumed to describe Grimshaw Court itself. | The available resident reviews are for the wider Lampton Parkside development rather than Grimshaw Court alone. They praise the location—“next to the nice Lampton Park”—and one resident says a “brilliant management team” helped resolve issues, while others report that cases stayed open for weeks, access doors were used by non-occupiers, and bike thefts and a burglary occurred at another court in the development. | ||
| Manor Place DepotElephant and Castle, London262 units | 5.5/ 10 | —/ 10 | 6.1/ 10 HomeViews 3.8/5, 3.6/5, 4.4/5, 3.4/5, 2.4/5, 3.7/5 · 52 reviews · homeviews.com Combined from 6 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 6.1. |
HomeViews’ 3.57/5 building rating from 52 resident reviews is the anchor, converting to approximately 5.7/10 on the specified curve. The published 2.4/5 management sub-score and repeated complaints about delayed responses, antisocial behaviour and communal cleanliness pull the score down, while strong location and comfort praise limits the reduction. Evidence is current enough to include reviews dated November 2025 and a 2024 garden-improvement update, but no source establishes the status of every older complaint on 2026-10-10. | |||
Residents describe some homes as “quiet, well insulated” and “top rated warm,” while another says a first-move leak was dealt with “swiftly and efficiently.” Countervailing physical-condition feedback includes concern that materials prioritised “lower price” over “quality and durability,” and a report that fire doors were “broken for years at a time”; the latter is a single serious report rather than a published structural rating. | The strongest day-to-day positives are connectivity and convenience: residents call the location “very central” and say transport links “can’t be beaten”; Notting Hill Genesis also reports resident-led garden improvement. The operational picture is materially weaker: HomeViews publishes a 2.4/5 management sub-score and residents report enquiries unanswered for months, “very dirty” surroundings, ongoing antisocial behaviour and unresolved issues. | ||
| Oaklands RiseOld Oak Common, London605 units | 3.8/ 10 | 2.5/ 10 | 2.0/ 10 |
The Google Reviews/Maps building aggregate of 2/5 from 14 resident reviews sets the level; applying the stated conversion curve gives an anchor of 2.5/10. Repeated reports of hot-water/heating failures, missing facilities and poor management justify a downward adjustment, with the 2022 flooding/electrical report treated as dated evidence whose current resolution is uncertain as of 2026-10-10. | Not found in sources: No widespread structural defect established | ||
The review material reports repeated hot-water and heating interruptions: one resident wrote that “Hot water breaks down every 2 weeks,” while another described being without “heating + hot/cold water” on multiple occasions. A 2022 residents’ submission reported flats made uninhabitable by “flash flooding and failure of electrical and hot water systems”; these are published complaints, not an independently verified engineering assessment, and the latest evidence located does not establish that every defect remained unresolved on 2026-10-10. | Day-to-day reviews are strongly negative about operations: residents report that promised shops, gym, café and crèche were still absent after years, and one said management did not “communicate the problem or acknowledge” recurring water issues. There is limited counter-evidence: one reviewer praised management as quick to resolve problems and described the flats as “really nice,” while the developer’s description confirms balconies, fitted kitchens and access to nearby transport and amenities. |
### Hammersmith 1 Sussex Place Hammersmith London, W6 9EA
### Chelmsford The Law Building Burgess Springs Chelmsford, CM1 1NW
The partnership regenerates the Aylesbury Estate and has built homes, council homes, a library, a health centre and a public square.
LLDC selected Notting Hill Genesis to develop three Hackney Wick sites in its and Hackney Council’s masterplan.
Hackney Council is part of the Hackney Wick Central masterplan alongside LLDC and Notting Hill Genesis.
The Hackney Wick development was procured using the Greater London Authority’s London Development Panel framework.
Ardmore is identified as a project partner on the fully affordable Hackney Wick/Fish Island scheme.
ENGIE Regeneration Ltd was identified as the Hackney Wick-based construction partner for the LLDC masterplan sites.
Southwark Council and housing association Notting Hill Genesis have agreed in principle to changing their longstanding partnership to regenerate the Aylesbury Estate.
The London Legacy Development Corporation has selected Notting Hill Genesis to develop three strategic sites close to the newly refurbished Hackney Wick Overground Station
These sites are owned by the LLDC and form part of the LLDC and Hackney Council's Hackney Wick Central masterplan
The team includes award-winning architects Hawkins\Brown, Delvendahl Martin and Studio Weave as well as Bow Arts as consultant workspace providers and HW based construction partner, ENGIE Regeneration Ltd.
This milestone was celebrated alongside the project’s partners: Notting Hill Genesis, London Legacy Development Corporation (LLDC), Ardmore, London Boroughs of Hackney and Tower Hamlets, and the Greater London Authority (GLA).
HW based construction partner, ENGIE Regeneration Ltd.
| COMPANY NUMBER | 7746 Financial Conduct Authority · GB · Active charitable Community Benefit Society |
| United Kingdom | active 9 projects tracked |
| Residential, for rent | 9 of 9 |
| Mixed use | 7 of 9 |
| Residential, for sale | 6 of 9 |
| Masterplan | 1 of 9 |
I’m honoured to take on the role of chair at this pivotal time.Inside Housing 23.06.25https://www.insidehousing.co.uk/news/ex-peabody-chief-executive-to-join-nhg-as-chair-92441
I look forward to working with the board and colleagues to help build trust, strengthen relationships and ensure we deliver the standards our customers and stakeholders rightly expect.Inside Housing 23.06.25https://www.insidehousing.co.uk/news/ex-peabody-chief-executive-to-join-nhg-as-chair-92441
He has since taken on a variety of advisory and non-executive roles, including at crisis support charity Hestia, the Shared Ownership Council and as chair of Sustainability for Housing, from which he stepped down in 2024.
He brings 20 years of chief executive experience, including at Peabody and Family Mosaic housing associations.
Mr Sarsfield said: “I’m honoured to take on the role of chair at this pivotal time.
The former chief executive of Peabody has been selected to join Notting Hill Genesis (NHG) as its new chair from September.
He brings 20 years of chief executive experience, including at Peabody and Family Mosaic housing associations.
He brings 20 years of chief executive experience, including at Peabody and Family Mosaic housing associations.
Brendan Sarsfield Chair
Interim Chief Executive Officer at Notting Hill Genesis
was CEO of Network Homes for 12 years
28 Sept 2026
Helen has decades of experience in social housing in London and the South of England, is a former Chair of the G15 and was CEO of Network Homes for 12 years.
Helen has decades of experience in social housing in London and the South of England, is a former Chair of the G15 and was CEO of Network Homes for 12 years.
He will be replaced by Helen Evans as interim CEO for a 12 month period while a permanent successor is recruited.
Chief Financial Officer - Notting Hill Genesis (Current) Mar 2026 - Present
He has recently been interim CFO at Anchor Hanover, GreenSquareAccord and Sovereign Network Housing Association.
Ken is our chief financial officer and joined in March 2026.
Ken has 25 years’ executive experience in social housing, care and commercial real estate.
Ken has 25 years’ executive experience in social housing, care and commercial real estate.
Chief financial officer
Chief Homes Officer (Current)
Matthew has many years’ experience at Notting Hill Genesis and Notting Hill Housing before that
Matthew is chief homes officer, having joined our executive board in January 2023.
His role brings together the work of our development, sales and building safety colleagues with those in assets and sustainability to create a full lifecycle approach to our homes.
His role brings together the work of our development, sales and building safety colleagues with those in assets and sustainability to create a full lifecycle approach to our homes.
Chief homes officer
I firmly believe that talented individuals and a robust and resilient organisational culture are fundamental to the success of any organisation.Notting Hill Genesis 18 Nov 2024https://group.nhg.org.uk/news/notting-hill-genesis-makes-two-senior-appointments-to-its-executive-board/
Chief Corporate & People Officer (Current)
Craig is also a non-executive director and chair of the people and culture committee at Nottingham University NHS Trust.
Most recently, he served as chief people officer at Marston Holdings
Craig added: “I am pleased to be coming back to social housing. I firmly believe that talented individuals and a robust and resilient organisational culture are fundamental to the success of any organisation.
Craig, who joins us in December as chief people officer, will oversee the existing human resources and communications functions
Most recently, he served as chief people officer at Marston Holdings, a business comprising eight companies delivering end-to-end technology, consultancy and debt management services.
Craig is an experienced executive and non-executive director who has worked across public and private companies, including in the not-for-profit housing sector and the NHS. Most recently, he served as chief people officer at Marston Holdings
Craig Wilcockson Chief corporate and people officer
I’m looking forward to applying my housing experience both commercially at Heylo, as well as at Network Homes and in the charity sector, to ensure we are set up and managed in the best way to deliver what we must for our residents.Notting Hill Genesis 18 Nov 2024https://group.nhg.org.uk/news/notting-hill-genesis-makes-two-senior-appointments-to-its-executive-board/
She was previously general counsel and director of governance for Heylo... Before that Tabitha was the executive director of governance, technology and transformation at Network Homes. Earlier in her career, she was legal director for the Howard League for Penal Reform, a national charity.
Tabitha commented: “I am delighted to be returning to the not-for-profit social housing sector. I am especially pleased to be joining Notting Hill Genesis, with its long history of providing homes for Londoners and a clear plan to better deliver for its residents. I’m looking forward to applying my housing experience both commercially at Heylo, as well as at Network Homes and in the charity sector, to ensure we are set up and managed in the best way to deliver what we must for our residents.”
Tabitha joined us in April 2025 as our new chief governance and risk officer.
She leads on the effective management of risks as well as being the responsible officer for compliance with regulatory standards including the Consumer Standards. She also acts as our company secretary and our health and safety lead.
A qualified solicitor, Tabitha has significant experience across corporate governance, including compliance and assurance, as well as legal and regulatory expertise. She was previously general counsel and director of governance for Heylo, which owns and manages more than 9,000 shared ownership homes across the UK. Before that Tabitha was the executive director of governance, technology and transformation at Network Homes. Earlier in her career, she was legal director for the Howard League for Penal Reform, a national charity.
Chief governance and risk officer
0 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Royal Albert Wharf | London, United Kingdom Royal Docks, Newham | masterplan, residential for sale, residential for rent, mixed use | 1,8561 | — | — | — | — | — | — | Jan 2021 – Dec 2021 | Sep 2025 – Dec 2025 | +52.0 mo (+45.0 to +59.0) | sourced | completed |
| Gallions 3B | London, United Kingdom Royal Docks, Newham | residential for sale, residential for rent | 2381 | — | — | — | — | 2022 | late 2022 | Apr 2025 | Jun 2025 | +2.0 mo (+2.0 to +2.0) | estimated | completed |
| Woodberry Down Phase 3 | London, United Kingdom Hackney | residential for sale, residential for rent, mixed use | 5841 | — | — | — | — | 2021 | October 2021 | Jan 2024 – Dec 2024 | Jan 2025 – Dec 2025 | +12.0 mo (+1.0 to +23.0) | sourced | completed |
| Kidbrooke Square Phase 1 | London, United Kingdom Royal Borough of Greenwich | residential for sale, residential for rent, mixed use | 4131 | — | — | — | — | — | — | Apr 2022 | Nov 2024 | +31.0 mo (+31.0 to +31.0) | sourced | completed |
| Lampton Parkside – Grimshaw Court | London, United Kingdom Hounslow | residential for rent | 421 | 5 | — | — | — | — | — | Sep 2023 | Sep 2023 | dates under review | dates under review | completed |
| Gallions Place | London, United Kingdom Royal Docks, Newham | residential for sale, residential for rent, mixed use | 2411 | — | — | — | — | 2021 | 15th May 2021 | Jan 2023 | Jan 2023 | 0.0 mo (0.0 to 0.0) | estimated | completed |
| Oaklands Rise | London, United Kingdom Old Oak Common | residential for rent, mixed use | 6051 | — | — | — | — | — | — | — | Jan 2022 – Dec 2022 | — | not scorable | completed |
| City Park West | Chelmsford, United Kingdom Chelmsford | residential for rent, mixed use | 6651 | 14-storey tower | — | — | — | 2013 | 2013 | — | Nov 2019 | — | not scorable | completed |
| Manor Place Depot | London, United Kingdom Elephant and Castle | residential for sale, residential for rent, mixed use | 2621 | — | — | — | — | 2018 | Saturday 13th October | Jan 2019 – Dec 2019 | Oct 2019 | +3.5 mo (−2.0 to +9.0) | sourced | completed |
| Auditor | Crowe UK LLP |
| Standard and Poor’s | A- negative outlook · 13 September 2024 |
| Fitch | A- stable outlook · 18 October 2024 |
| Coverage | active |
| Tracked since | October 10, 2026 |
| Last checked | October 10, 2026 this month |
| Profile last researched | October 10, 2026 |
| Claim |