Taylor Wimpey builds apartments, houses and affordable homes in the United Kingdom and Spain for private buyers and affordable-housing customers, investing in land and creating planned communities through regional businesses.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
AI-researched delivery record, not yet confirmed by the developer. Dates may be approximate; original sources are linked.
AI research over published reviews and resident comments. Scores are a model’s reading of opinion, not figures stated on a page, and nothing here feeds any number above it. The links under each block are the pages that research says it used. Based on available resident reviews of covered buildings. These are reported experiences, not independent building inspections, and may not represent all residents or properties.
| Project | Overall | Structure & systems | Management & living |
|---|---|---|---|
| The DenizenCity of London, London | 8.0/ 10 | —/ 10 | 7.4/ 10 HomeViews 5/5, 4.5/5, 5/5, 4.5/5, 5/5, 4/5 · 2 reviews · homeviews.com Combined from 6 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7.4. |
Google’s building listing is the largest reported review base, with 3 reviews and a published 3.7/5; using the stated conversion curve gives approximately 6.1/10. The two HomeViews resident reviews are more positive but too few to replace the anchor, and the reported commentary contains no recurring complaint or praise theme that warrants a further adjustment. | Not found in sources: No published systems evidence | ||
No published resident review located in the reviewed material reports plumbing, HVAC, electrical, leaks, waterproofing or lift failures. A 2017 local residents’ post alleged the scheme would reduce neighbouring homes’ winter sunlight by up to 62% and leave some apartments “extremely dark”; this is an event/planning objection, not evidence of a completed defect. HomeViews residents nevertheless described “Great space, high ceilings” and a “lovely, spacious and welcoming” design, while one noted limited storage and a smaller-than-preferred bedroom. | The two resident reviews on HomeViews were strongly positive about everyday living: one said the area was “Great space, high ceilings etc. Great location, very quiet,” and the other said, “In total, I’m satisfied.” Reservations were limited to the absence of a gym, storage constraints, a smaller bedroom, difficult bicycle access, and uncertainty over using the game room and private theatre during COVID-19; the developer lists a 24-hour concierge, games room, cinema, study and pocket park. | ||
| Aston ReachAylesbury | 7.4/ 10 | —/ 10 | 7.1/ 10 Google Reviews/Maps 4.3/5 · 4 reviews · exa.ai Google Reviews/Maps publishes 4.3/5 from 4 reviews. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 7.1. |
The 4.1/5 Google aggregate based on 21 reviews is the largest review base and sets the level; converted using the specified curve, it produces 7.4/10. The smaller 4.3/5 playground rating is supportive but does not replace the anchor, and the isolated waterlogging/design complaint was not a recurring theme under the stated rules. | Not found in sources: No published structural rating · No published plumbing feedback · No published HVAC feedback · No published electrical feedback · No published framework assessment · No published structural rating · No published plumbing feedback · No published HVAC feedback · No published electrical feedback · No published framework assessment | ||
no notes returned no links returned | The strongest operational praise was for sales staff: one reviewer said they were “very professional and helpful” and “Always promptly replied to any queries.” The play area received 4.3/5 from four reviews, including praise for “lots to do for children,” although another reviewer complained it “gets water logged with decent rain” and called the design poor; a separate council report recorded flooding at the nearby Aston Reach access road in October 2023, so that infrastructure evidence is historical rather than proof of the position on 2026-10-10. | ||
| Chobham ManorQueen Elizabeth Olympic Park, London880 units | 6.7/ 10 | 5.8/ 10 CIBSE Journal / LLDC post-occupancy evaluation 79/100, 89/100, 80/100, 74/100, 62/100, 50/100, 33/100 · 100 reviews · cibsejournal.com Combined from 7 published figures on 1 platform, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 5.8. | 7.0/ 10 HomeViews 4.1/5, 3.7/5, 4.6/5, 4/5, 2.6/5, 3.9/5 · 42 reviews · homeviews.com HomeViews 4/5, 3.8/5, 4.9/5, 4/5, 2.6/5, 3.2/5 · 9 reviews · homeviews.com CIBSE Journal / LLDC post-occupancy evaluation 87/100, 82/100 · 100 reviews · cibsejournal.com Combined from 14 published figures on 2 platforms, weighted by review count, adjusted for where resident ratings usually fall and weighted toward the 6.5 midpoint where reviews are few: 7. |
The largest directly published review aggregate is HomeViews’ 3.92/5 from 42 resident reviews, which converts to 6.8/10 under the specified curve. The score remains moderate because the same review record repeatedly reports weak management, security concerns and unresolved operational issues, partly offset by consistent praise for community, location, space and build quality; the 2026 evidence is current to the requested date but includes future improvement commitments that are not treated as completed. | |||
Resident evidence is positive on the fabric and environmental performance: the POE reports 89% satisfaction with daylight, 80% with winter temperature and 74% with general ventilation, while individual reviewers describe excellent insulation and few build-quality issues. The counter-evidence includes summer overheating—only 33% satisfaction in the Phase 1 survey—poor water pressure reported as unresolved for six months, and a January 2026 district-heating failure that affected multiple properties and took several days to trigger the major recovery plan. | Residents consistently praise the central green, parks, transport, shops and community; the POE says residents express “high levels of satisfaction, pride and belonging,” and HomeViews includes the comment “Brilliant sense of community and a great place to live.” Day-to-day operations are much less consistent: reviews describe management as “extremely poor,” “often non-responsive to emails,” and report increasing security concerns, while the 2026 residents’ meeting recorded long waits and an “unsatisfactory” out-of-hours heating call-centre response. | ||
| Postmark Phase 3Camden, London186 units | 6.1/ 10 | —/ 10 | 5.3/ 10 Apple App Store 1/5 · 1 review · apps.apple.com Apple App Store publishes 1/5 from 1 review. Adjusted for where resident ratings usually fall, and weighted toward the 6.5 midpoint (more strongly the fewer the reviews), that gives 5.3. |
The largest applicable published review base is the Google aggregate of 3.6/5 from 30 reviews, treated as a cluster-level Postmark rating because the page covers Taylor Wimpey Postmark London rather than Phase 3 alone; the stated conversion curve gives 5.8/10. No recurring complaint theme was supported by separately readable review texts, so no additional commentary adjustment was applied; structure remains unevidenced by a building-specific rating. | Not found in sources: No plumbing evidence · No HVAC evidence · No leak or waterproofing evidence | ||
The published project material describes reinforced-concrete frames supported by steel trusses above live Mail Rail tunnels, with challenging ground conditions addressed through piling; this is project-description evidence, not a resident condition review. A property listing describes the apartment as having a high-standard finish and being in “excellent condition with modern interiors,” while the Google-review summary separately notes concerns about “construction quality”; no specific defect reports or infrastructure sub-scores were published in the material read. | Published descriptions identify 24-hour concierge, wellness facilities, gym/pool access and an outdoor amenity area. The Google-review summary says feedback is mixed and highlights “customer service responsiveness,” “ongoing management” and “on-site security”; the Postmark resident app is rated 1.0/5 from one rating, while an independent park review calls the public realm “over-engineered” and says children’s play was designed out. | ||
| Harts MeadGreater Manchester, Ashton-under-Lyne195 units | 5.5/ 10 | —/ 10 | —/ 10 |
The only building-specific published rating located is Google Reviews/Maps’ 3.0/5 from 3 reviews, which converts to 4/10 on the specified curve. Because the anchor has fewer than 10 reviews, the score is kept within one point of 6.5, producing 5.5; no structural or living sub-score is reported because none was published. | |||
no notes returned no links returned | The building-specific review listing publishes only the overall result—“3.0 out of 5 from 3 reviews”—and provides no review text about management, staff, security, amenities or upkeep. The developer’s page describes a new play area and attenuation pond, but that is promotional project information rather than resident review evidence. |
Exeter
Bristol
Tonbridge
Leatherhead
Winchester
Hook
Bury St Edmunds
Brentwood
Kings Langley
Leicester
Warwick
Wolverhampton
Milton Keynes
Solihull
Dunfermline
Paisley
Manchester
Warrington
Sunderland
Stockton on Tees
Wakefield
Cardiff
DIO appointed Taylor Wimpey and Dorchester Living to deliver a residential-led mixed-use development.
Taylor Wimpey and Story Homes are partnering to bring forward affordable and open-market homes.
The council and Taylor Wimpey formed a joint venture for estate regeneration.
Homes England supported housing delivery through the New Homes Accelerator collaboration.
Bromford acquired land and homes from Taylor Wimpey for affordable housing.
The Defence Infrastructure Organisation (DIO) appointed Taylor Wimpey and our joint venture partner, Dorchester Living, to deliver a residential-led, mixed use development including community facilities, natural green space, two schools and a new town centre.
the scheme as a whole will consist of 330 new homes as we are partnering with Story Homes
the NHA programme (a collaboration between the Government, Homes England, developers and local authorities) and the Environment Agency have supported Taylor Wimpey to deliver 3,000 high-quality new homes.
Bromford has purchased 6.7 acres at the Perryfields development site ... A further 106 homes will be acquired from Taylor Wimpey
In September 2017 the Council entered a corporate joint venture with Taylor Wimpey UK Limited to deliver the regeneration of the Winstanley-York Road estates.
| COMPANY NUMBER | 00296805 Companies House · GB · Active |
| United Kingdom | active 8 projects tracked |
| Spain | active 0 projects tracked |
| Residential, for sale | 6 of 8 |
| Other | 1 of 8 |
| Residential, for rent | 1 of 8 |
| Mixed use | 1 of 8 |
Noel was educated at Marlborough College. He went on to study at the University of Reading and graduated with a bachelor's degree in 1986.
External appointments: - Chairman of Hammerson plc - Member of the Natural History Museum’s Infrastructure Committee - Non Executive Director of GMS Estates Limited
Rob was Chief Executive of Land Securities Group PLC from 2012 to 2020 and was previously Property Director at Great Portland Estates plc and a director of Nelson Bakewell, the property services group.
Chair 27 April 2023
Rob was Chief Executive of Land Securities Group PLC from 2012 to 2020 and was previously Property Director at Great Portland Estates plc and a director of Nelson Bakewell, the property services group.
Chair 27 April 2023
We can’t as Taylor Wimpey or as the wider private housing sector meet all need. But we do all have a societal responsibility to make sure that need is met.Building https://www.building.co.uk/focus/home-truths-podcast-in-conversation-with-jennie-daly-at-taylor-wimpey/5129368.article
In 1991, Jennie Daly completed a Bachelor of Arts in Town and Country Planning at University of Manchester.
External appointments: - Member of the Board of the Home Builders Federation- Member of the Government's AI Opportunity Forum
Daly started her career as a planner, before joining Harrow Estates, a subsidiary of Redrow, where she had a number of roles before becoming managing director.
We can’t as Taylor Wimpey or as the wider private housing sector meet all need. But we do all have a societal responsibility to make sure that need is met.
Appointed: - CEO 26 April 2022 - Group Operations Director 20 April 2018
Jennie Daly is Chief Executive and has full day-to-day responsibility for delivering Taylor Wimpey’s strategy. She joined from Redrow in 2014 and progressed through planning, land and operations leadership; her earlier career included Harrow Estates and Westbury Homes.
Chief Executive
Chris is a Chartered Accountant and has worked in private practice with Deloitte and in-house for Associated British Foods plc.
Appointed: 20 April 2018
Chris Carney is Group Finance Director, responsible for Taylor Wimpey’s finance, tax, treasury, IT and pension functions. He is a Chartered Accountant whose earlier experience included Deloitte and Associated British Foods, and he has held several senior operating roles within Taylor Wimpey since joining in 2006.
Chris is a Chartered Accountant and has worked in private practice with Deloitte and in-house for Associated British Foods plc.
Group Finance Director
Jitesh graduated from Cambridge University with a degree in Economics and attended the London Business School as a Sloan Fellow.
Jitesh graduated from Cambridge University with a degree in Economics and attended the London Business School as a Sloan Fellow.
Lord Gadhia is also Chair of The British Asian Trust... Jitesh ... currently serves on the boards of Rolls-Royce Holdings plc and Taylor Wimpey plc.
Jitesh has over 25 years investment banking and financial services experience, having held senior positions at Blackstone, Barclays Capital, ABN AMRO and Baring Brothers.
Appointed: 1 March 2021 - Senior Independent Director 1 December 2024
Lord Jitesh Gadhia is Taylor Wimpey’s Senior Independent Director and brings more than 25 years of banking and private-equity experience. He has held senior roles at Blackstone, Barclays Capital, ABN AMRO and Baring Brothers, and also serves on major public, central-bank and charitable boards.
Senior Independent Director; Independent Non Executive Director
Scilla has significant finance, risk and technology related experience in customer facing environments, having been Chief Financial Officer at Deliveroo plc and Moneysupermarket.com Group plc and held senior roles at UBS, Tesco plc and Marks and Spencer Group plc.
Appointed: 1 March 2021
Scilla Grimble is an independent non-executive director with significant finance, risk and technology experience in customer-facing businesses. Her prior executive roles include CFO of Deliveroo and Moneysupermarket.com Group, plus senior positions at UBS, Tesco and Marks & Spencer.
Independent Non Executive Director
BSC, Mathematics at Cardiff University
External appointments: - Non Executive Director of Luceco plc -Independent Non Executive Director and Chair Designate at Stelrad Group plc
Martyn was the CEO of Marshalls plc for over 10 years and prior to this he was the CEO of Baxi Group and Divisional CEO of BDR Thermea.
Appointed: 1 December 2024
Martyn Coffey is an independent non-executive director with extensive building-materials and industrial-sector leadership experience. He was CEO of Marshalls for more than ten years and previously led Baxi Group and a BDR Thermea division; he also holds non-executive roles at Luceco and Stelrad.
Independent Non Executive Director
1 undated completions and 0 boundary-uncertain completions are retained but excluded from figures.
| Project | Location | Type | Units | Floors | Area | Cost | Payment plan | Launched | Construction start | Original target | Handover | Delay | Confidence | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Yardley Manor community facility | Olney, United Kingdom Buckinghamshire | other | — | — | — | — | — | 2025 | 2025 | Aug 2025 | Mar 2026 | +7.0 mo (+7.0 to +7.0) | sourced | completed |
| Harts Mead | Ashton-under-Lyne, United Kingdom Greater Manchester | residential for sale | 1951 | — | — | — | — | 2020 | 2020 | — | Feb 2026 | — | not scorable | completed |
| Bramley Park | Warsash, United Kingdom Hampshire | residential for sale | 851 | — | — | — | — | 2023 | 2023 | — | Sep 2025 | — | not scorable | completed |
| Vision at Whitehouse | Milton Keynes, United Kingdom Whitehouse | residential for sale | 4381 | — | — | — | — | 2016 | late February/early March 2016 | — | Apr 2025 | — | not scorable | completed |
| Aston Reach | Aylesbury, United Kingdom | residential for sale | — | — | — | — | — | 2019 | 2019 | — | Jun 2024 | — | not scorable | completed |
| Postmark Phase 3 | London, United Kingdom Camden | residential for sale, residential for rent | 1861 | — | — | — | — | 2022 | Thursday 19th May 2022 | Jan 2025 – Mar 2025 | Feb 2024 | dates under review | dates under review | completed |
| Chobham Manor | London, United Kingdom Queen Elizabeth Olympic Park | mixed use | 8801 | — | — | — | — | — | — | — | Jan 2022 – Dec 2022 | — | not scorable | completed |
| The Denizen | London, United Kingdom City of London | residential for sale | — | — | — | — | — | 2017 | 13th September 2017 | — | Jun 2020 – Aug 2020 | — | not scorable | completed |
| Auditor | PricewaterhouseCoopers LLP |
| Coverage | active |
| Tracked since | October 10, 2026 |
| Last checked | October 10, 2026 this month |
| Profile last researched | October 10, 2026 |
| Claim |